<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0">
  <channel>
    <item>
      <title street="RAGLAN STREET" suburb="ROMA" dateFrom="Monday, July 15, 2013" timeFrom="06:00:00 AM" dateTo="" timeTo="">RAGLAN STREET ROMA From Monday, July 15, 2013 06:00:00 AM </title>
      <description><![CDATA[Raglan Street, Roma - Commencing: Mid July 2013, between the hours of 6:00am and 6:00pm planned roadworks are taking place Both Directions - Between Currey Street and Cattle Creek .
Single lane in operation. Medium delays expected. Changed traffic conditions. Expected completion is 30 April 2014, weather permitting.

On Site during working hours (6am-6pm): Single lane in operation, reduced speed limit (40km/h), portable traffic signals with possible delays of up to 15 minutes.

On Site During NON working hours: Single lane in operation, reduced speed limit (60km/h), portable traffic signals with possible delays of up to 15 minutes.

Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au
]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=423107</link>
    </item>
    <item>
      <title street="CONDAMINE KOGAN ROAD" suburb="CROSSROADS" dateFrom="Wednesday, July 03, 2013" timeFrom="06:00:00 AM" dateTo="" timeTo="">CONDAMINE KOGAN ROAD CROSSROADS From Wednesday, July 03, 2013 06:00:00 AM </title>
      <description><![CDATA[Condamine Kogan Road, Crossroads - Commencing: 03 July 2013, between the hours of 6:00am and 6:00pm planned roadworks are taking place Both Directions - Approximately 46km west of Kogan.
Partial lane closures. Short delays expected. Changed traffic conditions. Expected completion is 25 July 2013, weather permitting.

On Site during working hours (6am-6pm): Reduced Speed Limit 40km/h, Traffic control on site with possible delays of up to 5 minutes.

On Site During NON working hours and Overnight (6pm-6am): Returned to normal traffic conditions.
]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=429164</link>
    </item>
    <item>
      <title street="GATEWAY MOTORWAY" suburb="EIGHT MILE PLAINS" dateFrom="Monday, June 24, 2013" timeFrom="07:00:00 PM" dateTo="Monday, July 15, 2013" timeTo="05:00:00 AM">GATEWAY MOTORWAY EIGHT MILE PLAINS From Monday, June 24, 2013 07:00:00 PM to Monday, July 15, 2013 05:00:00 AM</title>
      <description><![CDATA[Gateway Motorway, Eight Mile Plains - Commencing: 24 June, at 7:00pm planned roadworks are taking place Northbound.
Partial lane closures. Short delays expected. Changed traffic conditions. Expected completion is 15 July, at 5:00am.

Motorists are advised that nightworks will be required to complete piling works on the Gateway Motorway, northbound, at the Pacific Motorway overpass, between 7.00pm and 5.00am Monday 24 June to Monday 15 July 2013.
These works will require temporary lane closures on the Gateway Motorway northbound. To ensure the safety of motorists and roadworkers, temporary stop and go traffic control will be required during lifting movements. Minor delays may be expected. Motorists are reminded to drive carefully and be aware of the reduced speed limits. For further information contact the project team on 1800 799 686. These works are part of the Gateway Upgrade South and South East Busway extension.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=433604</link>
    </item>
    <item>
      <title street="NEV SMITH DRIVE" suburb="SPRINGFIELD" dateFrom="Monday, June 24, 2013" timeFrom="06:00:00 AM" dateTo="Monday, August 26, 2013" timeTo="05:00:00 PM">NEV SMITH DRIVE SPRINGFIELD From Monday, June 24, 2013 06:00:00 AM to Monday, August 26, 2013 05:00:00 PM</title>
      <description><![CDATA[Nev Smith Drive, Springfield - Commencing: 24 June, at 6:00am planned roadworks are taking place Both Directions.
Both lanes affected. No delays expected. Changed traffic conditions. Expected completion is 26 August, at 5:00pm.

Richlands to Springfield Project
Temporary closures: Nev Smith Drive, Springfield (June – August 2013)

Temporary closures will occur on Nev Smith Drive, Springfield near Springfield Link Bridge from June until August 2013.

A full closure (both lanes) will take place from Monday 24 June to Monday 8 July.

When these works are complete, the northbound lane will re-open to traffic, however, the southbound lane will remain closed until Monday 26 August.

These closures are necessary for works to be undertaken safely on Springfield Station, which is scheduled for completion in December 2013.

A 2.3km detour will be in place along:
1.	Nev Smith Drive, Springfield
2.	Woodcrest Way, Springfield
3.	Springfield Parkway, Springfield
4.	Nev Smith Drive, Springfield

Signage will be in place to direct motorists. 

Access to Woodcrest State College parking facilities located on Woodcrest Way will not be affected by these temporary closures.

Although Springfield Link Bridge will remain open during this time, the  access ramp on the station side will be closed. Signage will be in place to direct pedestrians and cyclists.

Please slow down and drive carefully in the changed conditions. 

For more information, please contact the project team on 1800 067 684 or email info@trackstar.com.au. 

A detour map for motorists can be downloaded from the project website www.trackstar.com.au. 
]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=429194</link>
    </item>
    <item>
      <title street="NICKLIN WAY" suburb="MINYAMA" dateFrom="Sunday, June 23, 2013" timeFrom="06:00:00 PM" dateTo="Tuesday, June 25, 2013" timeTo="05:00:00 AM">NICKLIN WAY MINYAMA From Sunday, June 23, 2013 06:00:00 PM to Tuesday, June 25, 2013 05:00:00 AM</title>
      <description><![CDATA[Nicklin Way, Minyama - Commencing: 23 June, at 6:00pm planned roadworks are taking place All directions.
All lanes affected. Short delays expected. Proceed with caution. Expected completion is 25 June, at 5:00am.

NIGHT WORKS ONLY 6PM TO 5AM]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=434000</link>
    </item>
    <item>
      <title street="JAMES STREET" suburb="TOOWOOMBA CITY" dateFrom="Sunday, June 23, 2013" timeFrom="06:00:00 AM" dateTo="" timeTo="">JAMES STREET TOOWOOMBA CITY From Sunday, June 23, 2013 06:00:00 AM </title>
      <description><![CDATA[James Street, Toowoomba City - Commencing: Sunday 23 June 2013, between the hours of 6:00am and 6:00pm planned roadworks are taking place Both Directions - Warrego Highway from the intersection with Cohoe and Herries Streets to the intersection with James and John Streets.
One lane blocked. Unknown traffic impact. Changed traffic conditions. Expected completion is Sunday 23 June 2013, weather permitting.

On Site during working hours SUNDAY (6am-6pm)only: Reduced Speed Limit 40km/h, one lane blocked, proceed with caution.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=429159</link>
    </item>
    <item>
      <title street="RUTHVEN STREET" suburb="HARLAXTON" dateFrom="Saturday, June 22, 2013" timeFrom="06:00:00 AM" dateTo="" timeTo="">RUTHVEN STREET HARLAXTON From Saturday, June 22, 2013 06:00:00 AM </title>
      <description><![CDATA[Ruthven Street, Harlaxton - Commencing: 22 June 2013, between the hours of 6:00am and 6:00pm planned roadworks are taking place Northbound - Between Jones Road and Lemnos Street Toowoomba.
No blockage. No delays expected. Changed traffic conditions. Expected completion is 23 June 2013, weather permitting.

On Site during working hours (6am-6pm): North bound shoulder reduced, speed limited 40km/h

On Site During NON working hours: Return to normal traffic conditions
]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=423634</link>
    </item>
    <item>
      <title street="HENMAN STREET" suburb="SOUTH MACKAY" dateFrom="Saturday, June 22, 2013" timeFrom="06:00:00 AM" dateTo="Sunday, July 07, 2013" timeTo="06:00:00 PM">HENMAN STREET SOUTH MACKAY From Saturday, June 22, 2013 06:00:00 AM to Sunday, July 07, 2013 06:00:00 PM</title>
      <description><![CDATA[Henman Street, South Mackay - Commencing: 22 June, at 6:00am planned roadworks are taking place Both Directions.
Road closed both directions. Medium delays expected. Use alternative route. Expected completion is 07 July, at 6:00pm.

Henman Street will be closed at the Paradise Street intersection between Saturday 22 June through to Sunday 7 July (2 weeks) to allow for rehabilitation works to occur.  Access to Mackay State High School is via Milton Street only.  Motorists are advised to seek an alternate route while these works are completed.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=429176</link>
    </item>
    <item>
      <title street="LOBB STREET" suburb="CHURCHILL" dateFrom="Wednesday, June 19, 2013" timeFrom="07:00:00 PM" dateTo="Thursday, June 20, 2013" timeTo="05:00:00 AM">LOBB STREET CHURCHILL From Wednesday, June 19, 2013 07:00:00 PM to Thursday, June 20, 2013 05:00:00 AM</title>
      <description><![CDATA[Lobb Street, Churchill - Commencing: 19 June, at 7:00pm planned roadworks are taking place Both Directions.
Short delays expected. Changed traffic conditions. Expected completion is 20 June, at 5:00am.

Safety improvement works to be carried out overnight on Wednesday 19 June 2013, weather and construction conditions permitting. 

Works will include the installation of a dedicated right turn arrow and removal of the u-turn sign and movement for southbound motorists on Warwick Road as well as installation of a right turn arrow for motorists turning left into Warwick Road from Lobb Street. 

Minor traffic delays, some lane closures and reduced speed limits can be expected. 
]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=430378</link>
    </item>
    <item>
      <title street="SHERIDAN STREET" suburb="CAIRNS NORTH" dateFrom="Wednesday, June 19, 2013" timeFrom="06:57:00 AM" dateTo="" timeTo="">SHERIDAN STREET CAIRNS NORTH From Wednesday, June 19, 2013 06:57:00 AM </title>
      <description><![CDATA[Sheridan Street, Cairns North - Commencing: 19 June, at 9:00am planned roadworks are taking place Inbound - between Grove Street and Upward Street - left lane.
One lane closed. Short delays expected. Changed traffic conditions. Expected completion is 19 June, at 3:00pm.

Relining sewerage lines]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=433630</link>
    </item>
    <item>
      <title street="WARREGO HIGHWAY" suburb="HELIDON" dateFrom="Wednesday, June 19, 2013" timeFrom="06:00:00 AM" dateTo="Friday, August 30, 2013" timeTo="06:00:00 PM">WARREGO HIGHWAY HELIDON From Wednesday, June 19, 2013 06:00:00 AM to Friday, August 30, 2013 06:00:00 PM</title>
      <description><![CDATA[Warrego Highway, Helidon - Commencing: 19 June, at 6:00am planned roadworks are taking place Both Directions.
Both lanes affected. Medium delays expected. Changed traffic conditions. Expected completion is 30 August, at 6:00pm.

Flood reconstruction works are underway on the Warrego Highway between Helidon and Withcott until August 2013

Works will generally be undertaken during the day from 6am to 6pm, Monday to Friday. Some nightwork and weekend work will occur when required.

Contra-flow and partial lane closures with traffic control will be in place.

For more information please contact the project team on 1800 063 397 or email reconstruct_metropolitan@tmr.qld.gov.au]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=433603</link>
    </item>
    <item>
      <title street="PEASE STREET" suburb="MANOORA" dateFrom="Tuesday, June 18, 2013" timeFrom="05:57:00 PM" dateTo="" timeTo="">PEASE STREET MANOORA From Tuesday, June 18, 2013 05:57:00 PM </title>
      <description><![CDATA[Pease Street, Manoora - Commencing: 09 August, at 9:00am planned roadworks are taking place All directions - at the intersection of Pease Street and Murray Street.
Lane or lanes reduced. Short delays expected. Changed traffic conditions. Expected completion is 16 August, at 3:00pm.

Channelisation improvements ]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=433613</link>
    </item>
    <item>
      <title street="BRUCE HIGHWAY" suburb="WOREE" dateFrom="Tuesday, June 18, 2013" timeFrom="05:30:00 PM" dateTo="Friday, October 25, 2013" timeTo="12:00:00 AM">BRUCE HIGHWAY WOREE From Tuesday, June 18, 2013 05:30:00 PM to Friday, October 25, 2013 12:00:00 AM</title>
      <description><![CDATA[Bruce Highway, Woree - Commencing: 18 June, at 5:30pm planned roadworks are taking place All directions - Cairns Bruce Highway Upgrade.
Partial lane closures. Short delays expected. Changed traffic conditions. Expected completion is 25 October, at 12:00am.

Closures and changes for Wednesday 19 June:
- Ray Jones Drive outbound from Chinaman Creek to Kate intersection. Fast lane closure 6:30am - 3pm for median works
- Ray Jones Drive outbound - sweeper lane will be closed from Kate St to Bruce Hwy - 7am - 3pm for landscaping, drainage and gravel works 
- Bruce Hwy - Mulgrave Rd southbound at the overpass - fast lane closure 8:30am - 2pm for concrete barrier works at the northern end of overpass
- Bruce Hwy northbound from Forestgardens to Anderson Rd will have lane closure 10am - 5pm for antiglare works at new barrier - and pavement works at Anderson Rd slip lane
- There will be global mowing sitewide Forest Gardens - Ray Jones Drive - Mulgrave Rd between 7:30am - 5pm

Permanent closure
Junction of Progress Road, White Rock and Bruce Highway – from Sunday 2 June 2013. The junction of Progress Road, White Rock and Bruce Highway is permanently closed to all traffic. Alternate route is via Coombs Street, Anderson Road and the newly constructed Links Drive (service road past Cairns Golf Club, open for inbound traffic only from 7.00am to 10.00am and 2.30pm to 4.00pm). 

Night works
Bruce Highway – Ongoing to Friday 12 July 2013 - between 8.30pm and 5.00am weather permitting.  The Bruce Highway near Forest Gardens will be reduced to single lane operation in both directions at times to allow for bridge construction. The intersection of Bruce Highway and Forest Gardens Boulevard will be under traffic control. 
   
Night works
Progress Road, White Rock – Sunday 16 June 2013 - between 11.00pm and 6.30am, weather permitting.  Progress Road, White Rock will be reduced to single lane operation.  These works are required for bridge construction and must be undertaken at this time due to Queensland Rail movements.  
 
Night works
Sheehy Road, Progress Road and Kowinka Street – Friday 5 July 2013 – between 7.00pm and 6.00am, weather permitting. Sections of Progress Road, Sheehy Road and the intersection of Sheehy Road and Kowinka Street will be closed at times. These works are required for road construction. Residents may notice additional vehicle noise and increased lighting in the area. Diversions may be required, please see variable message signs for further details.
 
Night works
Ray Jones Drive merge lane with Bruce Highway – Thursday 11 July to Saturday 13 July 2013 – between 7.00pm and 7.00am, weather permitting. The merging lane from Ray Jones Drive to Bruce Highway southbound will be reduced to single lane operation. These works are required for road construction. 

If you have any questions or would like more information about the Cairns Bruce Highway Upgrade project please call the toll-free project information line on 1800 657 724, send an email to cbhu@bmd.com.au or visit www.tmr.qld.gov.au/projects ]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=416763</link>
    </item>
    <item>
      <title street="PACIFIC MOTORWAY" suburb="BEENLEIGH" dateFrom="Tuesday, June 18, 2013" timeFrom="05:20:00 PM" dateTo="Sunday, June 23, 2013" timeTo="05:00:00 AM">PACIFIC MOTORWAY BEENLEIGH From Tuesday, June 18, 2013 05:20:00 PM to Sunday, June 23, 2013 05:00:00 AM</title>
      <description><![CDATA[Pacific Motorway, Beenleigh - Commencing: 18 June, at 5:20pm planned roadworks are taking place All directions - Yatala South Interchange (Exit 41) CLOSED each night this week from 7pm until 5am. Southbound detour via Ormeau Interchange (Exit 45). Northbound detour via Yatala North Interchange (Exit 38).  
.
Road closed both directions. Short delays expected. Use alternative route. Expected completion is 23 June, at 5:00am.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=433609</link>
    </item>
    <item>
      <title street="SHERIDAN STREET" suburb="CAIRNS CITY" dateFrom="Tuesday, June 18, 2013" timeFrom="05:18:00 PM" dateTo="" timeTo="">SHERIDAN STREET CAIRNS CITY From Tuesday, June 18, 2013 05:18:00 PM </title>
      <description><![CDATA[Sheridan Street, Cairns City - Commencing: 19 June, at 9:00am planned roadworks are taking place All directions - Council are doing channelisation improvements to intersections with Minnie, Grove, Gatton, Smith Street and Sheridan Street.
Lane or lanes reduced. Short delays expected. Changed traffic conditions. Expected completion is 17 September, at 3:00pm.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=433611</link>
    </item>
    <item>
      <title street="PACIFIC MOTORWAY" suburb="PIMPAMA" dateFrom="Tuesday, June 18, 2013" timeFrom="05:12:00 PM" dateTo="Saturday, June 29, 2013" timeTo="05:00:00 AM">PACIFIC MOTORWAY PIMPAMA From Tuesday, June 18, 2013 05:12:00 PM to Saturday, June 29, 2013 05:00:00 AM</title>
      <description><![CDATA[Pacific Motorway, Pimpama - Commencing: 18 June, at 5:12pm planned roadworks are taking place Northbound - Pacific Motorway, northbound (north of Ormeau Interchange Exit 45) tonight, Tuesday 18 June 2013 from 8pm until 5am. .
Partial lane closures. Short delays expected. Changed traffic conditions. Expected completion is 29 June, at 5:00am.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=433608</link>
    </item>
    <item>
      <title street="SAMFORD ROAD" suburb="FERNY HILLS" dateFrom="Tuesday, June 18, 2013" timeFrom="04:06:00 PM" dateTo="Tuesday, June 18, 2013" timeTo="05:00:00 PM">SAMFORD ROAD FERNY HILLS From Tuesday, June 18, 2013 04:06:00 PM to Tuesday, June 18, 2013 05:00:00 PM</title>
      <description><![CDATA[Samford Road, Ferny Hills - Commencing: 18 June, at 4:06pm unplanned roadworks are taking place Both Directions.
Single lane in operation. Medium delays expected. Expected completion is 18 June, at 5:00pm. 

Emergency works between Owara Ave West & England Rd]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=433697</link>
    </item>
    <item>
      <title street="BRUCE HIGHWAY" suburb="ISIS RIVER" dateFrom="Tuesday, June 18, 2013" timeFrom="03:35:00 PM" dateTo="" timeTo="">BRUCE HIGHWAY ISIS RIVER From Tuesday, June 18, 2013 03:35:00 PM </title>
      <description><![CDATA[Bruce Highway, Isis River - Commencing:   planned roadworks are taking place Both Directions - South of the Isis River.
Lane or lanes reduced. Short delays expected. Allow extra travel time. Expected completion is early 2014, weather permitting.

Work to construct a northbound and southbound overtaking lane is currently underway. Traffic controllers, single-lane closures and a reduced speed limit may be in place for the safety of roadworkers and motorists, and short delays may be experienced during work hours. For further information, please contact Transport and Main Roads (Wide Bay/Burnett Region) on 1300 728 390 during business hours.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=433598</link>
    </item>
    <item>
      <title street="TAKALVAN STREET" suburb="BUNDABERG WEST" dateFrom="Tuesday, June 18, 2013" timeFrom="03:08:00 PM" dateTo="" timeTo="">TAKALVAN STREET BUNDABERG WEST From Tuesday, June 18, 2013 03:08:00 PM </title>
      <description><![CDATA[Takalvan Street, Bundaberg West - Commencing: Monday 29 April planned roadworks are taking place Both Directions - At the Heidke Street, Enterprise Street and Bourbong Street intersections.
Partial lane closures. Short delays expected. Changed traffic conditions. Expected completion is end July, weather permitting.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=407354</link>
    </item>
    <item>
      <title street="DAGUILAR HIGHWAY" suburb="COOLABUNIA" dateFrom="Tuesday, June 18, 2013" timeFrom="03:08:00 PM" dateTo="" timeTo="">DAGUILAR HIGHWAY COOLABUNIA From Tuesday, June 18, 2013 03:08:00 PM </title>
      <description><![CDATA[Daguilar Highway, Coolabunia - Commencing: in January 2013 planned roadworks are taking place Both Directions - Overtaking lane is being constructed about 13km north-west of Nanango near Lucas Road.
No blockage. No delays expected. Expected completion is late 2013, weather permitting.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=352302</link>
    </item>
    <item>
      <title street="BRUCE HIGHWAY" suburb="BAUPLE" dateFrom="Tuesday, June 18, 2013" timeFrom="03:03:00 PM" dateTo="" timeTo="">BRUCE HIGHWAY BAUPLE From Tuesday, June 18, 2013 03:03:00 PM </title>
      <description><![CDATA[Bruce Highway, Bauple - Commencing:   planned roadworks are taking place Both Directions.
Lane or lanes reduced. Short delays expected. Changed traffic conditions. Expected completion is October 2013, weather permitting.

Work to construct a southbound overtaking lane is currently underway. Traffic controllers, single-lane closures and a reduced speed limit may be in place for the safety of roadworkers and motorists, and short delays may be experienced during work hours. For further information, please contact Transport and Main Roads (Wide Bay/Burnett Region) on 1300 728 390 during business hours.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=343847</link>
    </item>
    <item>
      <title street="BRUCE HIGHWAY" suburb="MARYBOROUGH WEST" dateFrom="Tuesday, June 18, 2013" timeFrom="03:02:00 PM" dateTo="" timeTo="">BRUCE HIGHWAY MARYBOROUGH WEST From Tuesday, June 18, 2013 03:02:00 PM </title>
      <description><![CDATA[Bruce Highway, Maryborough West - Commencing:   planned roadworks are taking place Both Directions - At the Walker Street intersection.
Lane or lanes reduced. Short delays expected. Changed traffic conditions. Expected completion is late-2013, weather permitting.

Works to upgrade the Bruce Highway and Walker Street intersection are underway. Motorists should expect changed conditions and are advised that short delays may be experienced during work hours. For more information please contact Transport and Main Roads (Wide Bay/Burnett Region) on 1300 728 390 during business hours.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=343012</link>
    </item>
    <item>
      <title street="BRUCE HIGHWAY" suburb="TORBANLEA" dateFrom="Tuesday, June 18, 2013" timeFrom="03:02:00 PM" dateTo="" timeTo="">BRUCE HIGHWAY TORBANLEA From Tuesday, June 18, 2013 03:02:00 PM </title>
      <description><![CDATA[Bruce Highway, Torbanlea - Commencing: now planned roadworks are taking place Both Directions - Between Torbanlea-Pialba Road and the Burrum River.
Lane or lanes reduced. Short delays expected. Allow extra travel time. Expected completion is late 2013, weather permitting.

Construction of a northbound and southbound overtaking lane is underway. For more information please call Transport and Main Roads (Wide Bay/Burnett Region) on 1300 728 390 during business hours.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=391897</link>
    </item>
    <item>
      <title street="BRUCE HIGHWAY" suburb="HOWARD" dateFrom="Tuesday, June 18, 2013" timeFrom="03:01:00 PM" dateTo="" timeTo="">BRUCE HIGHWAY HOWARD From Tuesday, June 18, 2013 03:01:00 PM </title>
      <description><![CDATA[Bruce Highway, Howard - Commencing: now planned roadworks are taking place Both Directions - Between Lower Thomas Street and William Street/Howard Heights Road.
Lane or lanes reduced. Short delays expected. Allow extra travel time. Expected completion is late 2013, weather permitting.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=391895</link>
    </item>
    <item>
      <title street="FERRY STREET" suburb="MARYBOROUGH" dateFrom="Tuesday, June 18, 2013" timeFrom="02:59:00 PM" dateTo="" timeTo="">FERRY STREET MARYBOROUGH From Tuesday, June 18, 2013 02:59:00 PM </title>
      <description><![CDATA[Ferry Street, Maryborough - Commencing: now planned roadworks are taking place Both Directions - At the Lamington Bridge.
Both lanes affected. No delays expected. Changed traffic conditions. Expected completion is June 2013, weather permitting.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=377789</link>
    </item>
    <item>
      <title street="APPLETON DRIVE" suburb="YEPPOON" dateFrom="Tuesday, June 18, 2013" timeFrom="12:48:00 PM" dateTo="Monday, September 30, 2013" timeTo="06:00:00 PM">APPLETON DRIVE YEPPOON From Tuesday, June 18, 2013 12:48:00 PM to Monday, September 30, 2013 06:00:00 PM</title>
      <description><![CDATA[Appleton Drive, Yeppoon - Commencing: 18 June, at 12:48pm planned roadworks are taking place Both Directions - 1 site between Yeppoon and Emu Park.
No blockage. Short delays expected. Changed traffic conditions. Expected completion is 30 September, at 6:00pm.

Reconstruction roadworks are underway on Western Yeppoon-Emu Park Road (one site between Yeppoon and Emu Park). Delays of up to 15 minutes at each site can be expected. Motorists should drive to the changed conditions follow all signage for their own safety and the safety of road workers.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=424739</link>
    </item>
    <item>
      <title street="PHILIP STREET" suburb="WEST GLADSTONE" dateFrom="Tuesday, June 18, 2013" timeFrom="12:48:00 PM" dateTo="Monday, September 30, 2013" timeTo="06:00:00 PM">PHILIP STREET WEST GLADSTONE From Tuesday, June 18, 2013 12:48:00 PM to Monday, September 30, 2013 06:00:00 PM</title>
      <description><![CDATA[Philip Street, West Gladstone - Commencing: 18 June, at 12:48pm planned roadworks are taking place Both Directions - 1 site near Glenlyon Road.
No blockage. Short delays expected. Changed traffic conditions. Expected completion is 30 September, at 6:00pm.

Reconstruction roadworks are underway on Philip Street (one site near Glenlyon Road). Delays of up to 15 minutes at each site can be expected. Motorists should drive to the changed conditions follow all signage for their own safety and the safety of road workers.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=426446</link>
    </item>
    <item>
      <title street="FITZROY DEVELOPMENTAL ROAD" suburb="RHYDDING" dateFrom="Tuesday, June 18, 2013" timeFrom="12:47:00 PM" dateTo="Monday, September 30, 2013" timeTo="06:00:00 PM">FITZROY DEVELOPMENTAL ROAD RHYDDING From Tuesday, June 18, 2013 12:47:00 PM to Monday, September 30, 2013 06:00:00 PM</title>
      <description><![CDATA[Fitzroy Developmental Road, Rhydding - Commencing: 18 June, at 12:47pm planned roadworks are taking place Both Directions - 1 site south of Bauhinia.
Partial lane closures. Short delays expected. Observe signage. Expected completion is 30 September, at 6:00pm.

Reconstruction roadworks are underway on the Fitzroy Developmental Road (one site south of Bauhinia). Delays of up to 15 minutes at each site can be expected. Motorists should drive to the changed conditions follow all signage for their own safety and the safety of road workers.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=355994</link>
    </item>
    <item>
      <title street="GLADSTONE MONTO ROAD" suburb="CALLIOPE" dateFrom="Tuesday, June 18, 2013" timeFrom="12:47:00 PM" dateTo="Monday, September 30, 2013" timeTo="06:00:00 PM">GLADSTONE MONTO ROAD CALLIOPE From Tuesday, June 18, 2013 12:47:00 PM to Monday, September 30, 2013 06:00:00 PM</title>
      <description><![CDATA[Gladstone Monto Road, Calliope - Commencing: 18 June, at 12:47pm planned roadworks are taking place Both Directions - One site near Littlemore.
No blockage. Short delays expected. Changed traffic conditions. Expected completion is 30 September, at 6:00pm.

Reconstruction roadworks are underway on Gladstone-Monto Road (one site near Littlemore). Delays of up to 15 minutes at each site can be expected. Motorists should drive to the changed conditions follow all signage for their own safety and the safety of road workers.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=424738</link>
    </item>
    <item>
      <title street="YEPPOON ROAD" suburb="YEPPOON" dateFrom="Tuesday, June 18, 2013" timeFrom="12:47:00 PM" dateTo="Monday, September 30, 2013" timeTo="06:00:00 PM">YEPPOON ROAD YEPPOON From Tuesday, June 18, 2013 12:47:00 PM to Monday, September 30, 2013 06:00:00 PM</title>
      <description><![CDATA[Yeppoon Road, Yeppoon - Commencing: 18 June, at 12:47pm planned roadworks are taking place Both Directions - 1 site between Rockhampton and Yeppoon.
No blockage. Short delays expected. Changed traffic conditions. Expected completion is 30 September, at 6:00pm.

Reconstruction roadworks are underway on Rockhampton - Yeppoon Road (one site between Rockhampton and Yeppoon). Delays of up to 15 minutes at each site can be expected. Motorists should drive to the changed conditions follow all signage for their own safety and the safety of road workers.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=424740</link>
    </item>
    <item>
      <title street="LEICHHARDT HIGHWAY" suburb="THEODORE" dateFrom="Tuesday, June 18, 2013" timeFrom="12:46:00 PM" dateTo="Monday, September 30, 2013" timeTo="06:00:00 PM">LEICHHARDT HIGHWAY THEODORE From Tuesday, June 18, 2013 12:46:00 PM to Monday, September 30, 2013 06:00:00 PM</title>
      <description><![CDATA[Leichhardt Highway, Theodore - Commencing: 18 June, at 12:46pm planned roadworks are taking place Both Directions - 7 sites between Banana and Taroom.
Partial lane closures. Short delays expected. Observe signage. Expected completion is 30 September, at 6:00pm.

Reconstruction roadworks are underway on the Leichhardt Highway (seven sites between Banana and Taroom). Delays of up to 15 minutes at each site can be expected. Motorists should drive to the changed conditions follow all signage for their own safety and the safety of road workers.

Night time single lane closures will be in place on the Leichhardt Highway, approximately 20 kilometres south of Theodore due to reconstruction works. Traffic control will be in place and motorists should drive to the changed conditions.
]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=355993</link>
    </item>
    <item>
      <title street="BURNETT HIGHWAY" suburb="BILOELA" dateFrom="Tuesday, June 18, 2013" timeFrom="12:46:00 PM" dateTo="Monday, September 30, 2013" timeTo="06:00:00 PM">BURNETT HIGHWAY BILOELA From Tuesday, June 18, 2013 12:46:00 PM to Monday, September 30, 2013 06:00:00 PM</title>
      <description><![CDATA[Burnett Highway, Biloela - Commencing: 18 June, at 12:46pm planned roadworks are taking place Both Directions - 1 site south of Biloela.
No blockage. Short delays expected. Changed traffic conditions. Expected completion is 30 September, at 6:00pm.

Reconstruction roadworks are underway on the Burnett Highway (one south of Biloela). Delays of up to 15 minutes can be expected. Motorists should drive to the changed conditions follow all signage for their own safety and the safety of road workers.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=424737</link>
    </item>
    <item>
      <title street="LEICHHARDT HIGHWAY" suburb="WOWAN" dateFrom="Tuesday, June 18, 2013" timeFrom="12:45:00 PM" dateTo="Monday, September 30, 2013" timeTo="06:00:00 PM">LEICHHARDT HIGHWAY WOWAN From Tuesday, June 18, 2013 12:45:00 PM to Monday, September 30, 2013 06:00:00 PM</title>
      <description><![CDATA[Leichhardt Highway, Wowan - Commencing: 18 June, at 12:45pm planned roadworks are taking place Both Directions - 1 site between Dululu and Banana.
Partial lane closures. Short delays expected. Observe signage. Expected completion is 30 September, at 6:00pm.

Reconstruction roadworks are underway on the Leichhardt Highway (one site between Dululu and Banana). Delays of up to 15 minutes at each site can be expected. Motorists should drive to the changed conditions follow all signage for their own safety and the safety of road workers.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=355992</link>
    </item>
    <item>
      <title street="CARNARVON HIGHWAY" suburb="ROLLESTON" dateFrom="Tuesday, June 18, 2013" timeFrom="12:44:00 PM" dateTo="Monday, September 30, 2013" timeTo="06:00:00 PM">CARNARVON HIGHWAY ROLLESTON From Tuesday, June 18, 2013 12:44:00 PM to Monday, September 30, 2013 06:00:00 PM</title>
      <description><![CDATA[Carnarvon Highway, Rolleston - Commencing: 18 June, at 12:44pm planned roadworks are taking place Both Directions - 3 sites at Wallaroo Range.
Partial lane closures. Short delays expected. Changed traffic conditions. Expected completion is 30 September, at 6:00pm.

Reconstruction roadworks are underway on the Carnarvon Highway (three sites at the Wallaroo Range). Delays of up to 15 minutes at each site can be expected. Motorists should drive to the changed conditions follow all signage for their own safety and the safety of road workers.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=433096</link>
    </item>
    <item>
      <title street="DAWSON HIGHWAY" suburb="ROLLESTON" dateFrom="Tuesday, June 18, 2013" timeFrom="12:42:00 PM" dateTo="Monday, September 30, 2013" timeTo="06:00:00 PM">DAWSON HIGHWAY ROLLESTON From Tuesday, June 18, 2013 12:42:00 PM to Monday, September 30, 2013 06:00:00 PM</title>
      <description><![CDATA[Dawson Highway, Rolleston - Commencing: 18 June, at 12:42pm planned roadworks are taking place Both Directions - 2 sites between Bauhinia and Springsure.
Partial lane closures. Short delays expected. Changed traffic conditions. Expected completion is 30 September, at 6:00pm.

Reconstruction roadworks are underway on the Dawson Highway (two sites between Springsure and Bauhinia). Delays of up to 15 minutes at each site can be expected. Motorists should drive to the changed conditions follow all signage for their own safety and the safety of road workers.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=433095</link>
    </item>
    <item>
      <title street="DAWSON HIGHWAY" suburb="MOURA" dateFrom="Tuesday, June 18, 2013" timeFrom="12:41:00 PM" dateTo="Monday, September 30, 2013" timeTo="06:00:00 PM">DAWSON HIGHWAY MOURA From Tuesday, June 18, 2013 12:41:00 PM to Monday, September 30, 2013 06:00:00 PM</title>
      <description><![CDATA[Dawson Highway, Moura - Commencing: 18 June, at 12:41pm planned roadworks are taking place Both Directions - 6 sites between Bauhinia and Biloela.
Partial lane closures. Short delays expected. Observe signage. Expected completion is 30 September, at 6:00pm.

Reconstruction roadworks are underway on the Dawson Highway (six sites between Bauhinia and Biloela). Delays of up to 15 minutes at each site can be expected. Motorists should drive to the changed conditions follow all signage for their own safety and the safety of road workers.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=355991</link>
    </item>
    <item>
      <title street="DAWSON HIGHWAY" suburb="BILOELA" dateFrom="Tuesday, June 18, 2013" timeFrom="12:41:00 PM" dateTo="Monday, September 30, 2013" timeTo="06:00:00 PM">DAWSON HIGHWAY BILOELA From Tuesday, June 18, 2013 12:41:00 PM to Monday, September 30, 2013 06:00:00 PM</title>
      <description><![CDATA[Dawson Highway, Biloela - Commencing: 18 June, at 12:41pm planned roadworks are taking place Both Directions - 5 sites between Gladstone and Biloela.
No blockage. Short delays expected. Changed traffic conditions. Expected completion is 30 September, at 6:00pm.

Reconstruction roadworks are underway on the Dawson Highway (five sites between Biloela and Gladstone). Delays of up to 15 minutes at each site can be expected. Motorists should drive to the changed conditions follow all signage for their own safety and the safety of road workers.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=424736</link>
    </item>
    <item>
      <title street="CAPRICORN HIGHWAY" suburb="STANWELL" dateFrom="Tuesday, June 18, 2013" timeFrom="12:40:00 PM" dateTo="Monday, September 30, 2013" timeTo="06:00:00 PM">CAPRICORN HIGHWAY STANWELL From Tuesday, June 18, 2013 12:40:00 PM to Monday, September 30, 2013 06:00:00 PM</title>
      <description><![CDATA[Capricorn Highway, Stanwell - Commencing: 18 June, at 12:40pm planned roadworks are taking place Both Directions - 3 sites between Rockhampton and Duaringa.
Partial lane closures. Short delays expected. Observe signage. Expected completion is 30 September, at 6:00pm.

Reconstruction roadworks are underway on the Capricorn Highway (three sites between Duaringa and Rockhampton). Delays of up to 15 minutes at each site can be expected. Motorists should drive to the changed conditions follow all signage for their own safety and the safety of road workers.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=355987</link>
    </item>
    <item>
      <title street="CAPRICORN HIGHWAY" suburb="DINGO" dateFrom="Tuesday, June 18, 2013" timeFrom="12:40:00 PM" dateTo="Monday, September 30, 2013" timeTo="06:00:00 PM">CAPRICORN HIGHWAY DINGO From Tuesday, June 18, 2013 12:40:00 PM to Monday, September 30, 2013 06:00:00 PM</title>
      <description><![CDATA[Capricorn Highway, Dingo - Commencing: 18 June, at 12:40pm planned roadworks are taking place Both Directions - 2 sites between Duaringa and Emerald.
Partial lane closures. Short delays expected. Observe signage. Expected completion is 30 September, at 6:00pm.

Reconstruction roadworks are underway on the Capricorn Highway (two sites between Duaringa and Emerald). Delays of up to 15 minutes at each site can be expected. Motorists should drive to the changed conditions follow all signage for their own safety and the safety of road workers.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=355988</link>
    </item>
    <item>
      <title street="DAWSON DEVELOPMENTAL ROAD" suburb="SPRINGSURE" dateFrom="Tuesday, June 18, 2013" timeFrom="12:40:00 PM" dateTo="Monday, September 30, 2013" timeTo="08:00:00 PM">DAWSON DEVELOPMENTAL ROAD SPRINGSURE From Tuesday, June 18, 2013 12:40:00 PM to Monday, September 30, 2013 08:00:00 PM</title>
      <description><![CDATA[Dawson Developmental Road, Springsure - Commencing: 18 June, at 12:40pm planned roadworks are taking place Both Directions.
No blockage. Short delays expected. Changed traffic conditions. Expected completion is 30 September, at 8:00pm.

Reconstruction roadworks are underway on the Dawson Developmental Road. Delays of up to 15 minutes at each site can be expected. Motorists should drive to the changed conditions follow all signage for their own safety and the safety of road workers.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=377543</link>
    </item>
    <item>
      <title street="BRUCE HIGHWAY" suburb="BAJOOL" dateFrom="Tuesday, June 18, 2013" timeFrom="12:38:00 PM" dateTo="Monday, September 30, 2013" timeTo="06:00:00 PM">BRUCE HIGHWAY BAJOOL From Tuesday, June 18, 2013 12:38:00 PM to Monday, September 30, 2013 06:00:00 PM</title>
      <description><![CDATA[Bruce Highway, Bajool - Commencing: 18 June, at 12:38pm planned roadworks are taking place Both Directions.
Partial lane closures. Short delays expected. Changed traffic conditions. Expected completion is 30 September, at 6:00pm.

24 hour traffic control will be in place on Wednesday 18 June on the Bruce Highway just north of Bajool due to reconstruction works. Motorists should drive to the changed conditions.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=433094</link>
    </item>
    <item>
      <title street="BRUCE HIGHWAY" suburb="PORT CURTIS" dateFrom="Tuesday, June 18, 2013" timeFrom="12:37:00 PM" dateTo="Monday, September 30, 2013" timeTo="08:00:00 PM">BRUCE HIGHWAY PORT CURTIS From Tuesday, June 18, 2013 12:37:00 PM to Monday, September 30, 2013 08:00:00 PM</title>
      <description><![CDATA[Bruce Highway, Port Curtis - Commencing: 18 June, at 12:37pm planned roadworks are taking place Both Directions.
Partial lane closures. Short delays expected. Changed traffic conditions. Expected completion is 30 September, at 8:00pm.

Night works are under way on the Bruce Highway south of Rockhampton between the Burnett Highway intersection and the Rockhampton (Yeppen) roundabout. The road will be reduced to one lane between 7pm and 5am, seven days a week, between 11 June 2013 and 30 June 2013. Traffic control will be in place and motorists should drive to the changed conditions.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=418263</link>
    </item>
    <item>
      <title street="BRUCE HIGHWAY" suburb="BOROREN" dateFrom="Tuesday, June 18, 2013" timeFrom="12:36:00 PM" dateTo="Monday, September 30, 2013" timeTo="06:00:00 PM">BRUCE HIGHWAY BOROREN From Tuesday, June 18, 2013 12:36:00 PM to Monday, September 30, 2013 06:00:00 PM</title>
      <description><![CDATA[Bruce Highway, Bororen - Commencing: 18 June, at 12:36pm planned roadworks are taking place Both Directions - 4 sites between Miriam Vale and Bernaraby.
Partial lane closures. Short delays expected. Observe signage. Expected completion is 30 September, at 6:00pm.

Reconstruction roadworks are underway on the Bruce Highway (four sites between Miriam Vale and Benaraby). Delays of up to 15 minutes at each site can be expected. Motorists should drive to the changed conditions follow all signage for their own safety and the safety of road workers. ]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=355984</link>
    </item>
    <item>
      <title street="BRUCE HIGHWAY" suburb="MIRIAM VALE" dateFrom="Tuesday, June 18, 2013" timeFrom="12:36:00 PM" dateTo="Monday, September 30, 2013" timeTo="08:00:00 PM">BRUCE HIGHWAY MIRIAM VALE From Tuesday, June 18, 2013 12:36:00 PM to Monday, September 30, 2013 08:00:00 PM</title>
      <description><![CDATA[Bruce Highway, Miriam Vale - Commencing: 18 June, at 12:36pm planned roadworks are taking place Both Directions.
Partial lane closures. Short delays expected. Expected completion is 30 September, at 8:00pm.

Night time single lane closures will be in place on the Bruce Highway just north of Miriam Vale due to reconstruction works. Traffic control will be in place and motorists should drive to the changed conditions.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=418262</link>
    </item>
    <item>
      <title street="BRUCE HIGHWAY" suburb="MOUNT LARCOM" dateFrom="Tuesday, June 18, 2013" timeFrom="12:35:00 PM" dateTo="Monday, September 30, 2013" timeTo="06:00:00 PM">BRUCE HIGHWAY MOUNT LARCOM From Tuesday, June 18, 2013 12:35:00 PM to Monday, September 30, 2013 06:00:00 PM</title>
      <description><![CDATA[Bruce Highway, Mount Larcom - Commencing: 18 June, at 12:35pm planned roadworks are taking place Both Directions - 8 sites between Bernaraby and Rockhampton.
Partial lane closures. Short delays expected. Observe signage. Expected completion is 30 September, at 6:00pm.

Reconstruction roadworks are underway on the Bruce Highway (eight sites between Rockhampton and Benaraby). Delays of up to 15 minutes at each site can be expected. Motorists should drive to the changed conditions follow all signage for their own safety and the safety of road workers.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=355985</link>
    </item>
    <item>
      <title street="CAPTAIN COOK HIGHWAY" suburb="WANGETTI" dateFrom="Tuesday, June 18, 2013" timeFrom="11:13:00 AM" dateTo="" timeTo="">CAPTAIN COOK HIGHWAY WANGETTI From Tuesday, June 18, 2013 11:13:00 AM </title>
      <description><![CDATA[Captain Cook Highway, Wangetti - Commencing: 18 June, at 9:00am planned roadworks are taking place Northbound - Tin Creek.
Short delays expected. Changed traffic conditions. Expected completion is 21 June, at 6:00pm.

Upgrade existing guardrail]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=433091</link>
    </item>
    <item>
      <title street="IPSWICH MOTORWAY" suburb="GOODNA" dateFrom="Monday, June 17, 2013" timeFrom="08:00:00 PM" dateTo="Thursday, June 27, 2013" timeTo="04:30:00 AM">IPSWICH MOTORWAY GOODNA From Monday, June 17, 2013 08:00:00 PM to Thursday, June 27, 2013 04:30:00 AM</title>
      <description><![CDATA[Ipswich Motorway, Goodna - Commencing: 17 June, at 8:00pm planned roadworks are taking place Both Directions.
Lane or lanes reduced. No delays expected. Traffic control on scene. Expected completion is 27 June, at 4:30am.

Motorway Maintenance teams onsite
Centenary Highway Sumner Park to Logan Motorway
And Ipswich Motorway Darra to Dinmore]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=428585</link>
    </item>
    <item>
      <title street="WOOLCOCK STREET" suburb="GARBUTT" dateFrom="Monday, June 17, 2013" timeFrom="07:00:00 PM" dateTo="Sunday, June 30, 2013" timeTo="05:00:00 AM">WOOLCOCK STREET GARBUTT From Monday, June 17, 2013 07:00:00 PM to Sunday, June 30, 2013 05:00:00 AM</title>
      <description><![CDATA[Woolcock Street, Garbutt - Commencing: 17 June, at 7:00pm planned roadworks are taking place All directions - Night asphalt works at Hugh Street intersection.
Lane or lanes reduced. Short delays expected. Use alternative route. Expected completion is 30 June, at 5:00am.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=430179</link>
    </item>
    <item>
      <title street="BRUCE HIGHWAY" suburb="BABINDA" dateFrom="Monday, June 17, 2013" timeFrom="06:17:00 PM" dateTo="" timeTo="">BRUCE HIGHWAY BABINDA From Monday, June 17, 2013 06:17:00 PM </title>
      <description><![CDATA[Bruce Highway, Babinda - Commencing: 18 June, at 6:00am planned roadworks are taking place Both Directions - At Codfish Creek Bridge.
One lane closed. Short delays expected. Changed traffic conditions. Expected completion is 28 June, at 6:00pm.

Bridge end treatment upgrades]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=431409</link>
    </item>
    <item>
      <title street="BRUCE HIGHWAY" suburb="MIRIWINNI" dateFrom="Monday, June 17, 2013" timeFrom="06:09:00 PM" dateTo="" timeTo="">BRUCE HIGHWAY MIRIWINNI From Monday, June 17, 2013 06:09:00 PM </title>
      <description><![CDATA[Bruce Highway, Miriwinni - Commencing: 18 June, at 6:00am planned roadworks are taking place Both Directions - at Pugh Creek Bridge.
One lane closed. Short delays expected. Changed traffic conditions. Expected completion is 28 June, at 6:00pm.

Bridge end treatment upgrades]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=431407</link>
    </item>
    <item>
      <title street="BRUCE HIGHWAY" suburb="TULLY" dateFrom="Monday, June 17, 2013" timeFrom="05:38:00 PM" dateTo="" timeTo="">BRUCE HIGHWAY TULLY From Monday, June 17, 2013 05:38:00 PM </title>
      <description><![CDATA[Bruce Highway, Tully - Commencing: 18 June, at 7:00am planned roadworks are taking place Both Directions - at the Tully Mission Beach turnoff.
One lane closed. Short delays expected. Changed traffic conditions. Expected completion is 30 June, at 5:00pm.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=431400</link>
    </item>
    <item>
      <title street="STEVE IRWIN WAY" suburb="LANDSBOROUGH" dateFrom="Monday, June 17, 2013" timeFrom="05:00:00 PM" dateTo="" timeTo="">STEVE IRWIN WAY LANDSBOROUGH From Monday, June 17, 2013 05:00:00 PM </title>
      <description><![CDATA[Steve Irwin Way, Landsborough - Commencing: by early July 2013 planned roadworks are taking place All directions - Intersection with Railway street and Hardwood Road.
Lane or lanes reduced. Short delays expected. Traffic control on scene. Expected completion is to be advised.

The Department of Transport and Main Roads (TMR) would like to advise you that work to install traffic signals at the intersection of Steve Irwin Way, Hardwood Road and Railway Street in Landsborough is scheduled to begin by early July 2013 and be completed within three months, weather permitting.

The $1.5 million intersection upgrade is part of the state government’s Safer Roads Sooner program to improve road safety for road users and will include: the installation of traffic signals with pedestrian facilities,minor road widening,kerb realignment,upgraded road lighting and drainage works.

Work will generally be carried out during the day between 6am and 6pm, Monday to Friday. Nightworks will also be required during certain weeks between 6pm and 6am, Sunday to Thursday. For the safety of roadworkers and motorists, changed traffic conditions including lane closures and speed reductions will be in place.

While every effort will be made to minimise disruptions, nearby residents may experience some noise while the work is underway. TMR will write to nearby residents to provide advanced notification of the works. 

For up-to-date information on traffic disruptions please visit www.131940.qld.gov.au or call 13 19 40.

If you have any questions about this work, please contact Ms Jasmine Neilson, Communications Officer on 5451 7055. Ms Neilson will be pleased to assist.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=431405</link>
    </item>
    <item>
      <title street="BRUCE HIGHWAY" suburb="GORDONVALE" dateFrom="Monday, June 17, 2013" timeFrom="04:46:00 PM" dateTo="" timeTo="">BRUCE HIGHWAY GORDONVALE From Monday, June 17, 2013 04:46:00 PM </title>
      <description><![CDATA[Bruce Highway, Gordonvale - Commencing: 18 June, at 7:00am planned roadworks are taking place Both Directions - adjacent to the Gordonvale Golf Course, north of the Riverstone Rd intersection.
One lane closed. Short delays expected. Changed traffic conditions. Expected completion is 30 June, at 5:00pm.

Installation of permanent classifying count site]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=431398</link>
    </item>
    <item>
      <title street="BRUCE HIGHWAY" suburb="GORDONVALE" dateFrom="Monday, June 17, 2013" timeFrom="04:24:00 PM" dateTo="" timeTo="">BRUCE HIGHWAY GORDONVALE From Monday, June 17, 2013 04:24:00 PM </title>
      <description><![CDATA[Bruce Highway, Gordonvale - Commencing: 18 June, at 7:00am planned roadworks are taking place Both Directions - south of Riverstone Road.
One lane closed. Short delays expected. Changed traffic conditions. Expected completion is 30 June, at 5:00pm.

Installation of permanent classifying count site]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=431396</link>
    </item>
    <item>
      <title street="BRUCE HIGHWAY" suburb="GOONDI BEND" dateFrom="Monday, June 17, 2013" timeFrom="03:50:00 PM" dateTo="" timeTo="">BRUCE HIGHWAY GOONDI BEND From Monday, June 17, 2013 03:50:00 PM </title>
      <description><![CDATA[Bruce Highway, Goondi Bend - Commencing: 18 June, at 7:00am planned roadworks are taking place Both Directions - north of Innisfail and the Palmerston Highway turnoff.
One lane closed. Short delays expected. Changed traffic conditions. Expected completion is 30 June, at 5:00pm.

Installation of permanent classifying count site]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=431395</link>
    </item>
    <item>
      <title street="BRUCE HIGHWAY" suburb="TULLY" dateFrom="Monday, June 17, 2013" timeFrom="03:13:00 PM" dateTo="" timeTo="">BRUCE HIGHWAY TULLY From Monday, June 17, 2013 03:13:00 PM </title>
      <description><![CDATA[Bruce Highway, Tully - Commencing: 18 June, at 7:00am planned roadworks are taking place Both Directions - at Midgenoo Creek between Tully and Elarish.
One lane closed. Short delays expected. Proceed with caution. Expected completion is 31 June, at 5:00pm.

Installation of permanent classifying count site]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=431393</link>
    </item>
    <item>
      <title street="BRUCE HIGHWAY" suburb="EURAMO" dateFrom="Monday, June 17, 2013" timeFrom="02:47:00 PM" dateTo="" timeTo="">BRUCE HIGHWAY EURAMO From Monday, June 17, 2013 02:47:00 PM </title>
      <description><![CDATA[Bruce Highway, Euramo - Commencing: 17 June, at 9:00am planned roadworks are taking place All directions - Works will be taking place at Tully River Overflow Bridge and also at Lagoon Creek Bridge.
One lane closed. Short delays expected. Changed traffic conditions. Expected completion is Mid to Late June.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=420211</link>
    </item>
    <item>
      <title street="BRUCE HIGHWAY" suburb="CARDWELL" dateFrom="Monday, June 17, 2013" timeFrom="02:43:00 PM" dateTo="" timeTo="">BRUCE HIGHWAY CARDWELL From Monday, June 17, 2013 02:43:00 PM </title>
      <description><![CDATA[Bruce Highway, Cardwell - Commencing: 18 June, at 7:00am planned roadworks are taking place All directions - north of Ingham and south of the Cardwell Range.
One lane closed. Short delays expected. Changed traffic conditions. Expected completion is 30 June, at 5:00pm.

Installation of permanent classifying count site]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=431391</link>
    </item>
    <item>
      <title street="BRUCE HIGHWAY" suburb="TULLY" dateFrom="Monday, June 17, 2013" timeFrom="11:30:00 AM" dateTo="" timeTo="">BRUCE HIGHWAY TULLY From Monday, June 17, 2013 11:30:00 AM </title>
      <description><![CDATA[Bruce Highway, Tully - Commencing: 18 June, at 7:00am planned roadworks are taking place Both Directions - opposite Tully High School.
One lane closed. Short delays expected. Changed traffic conditions. Expected completion is 31 June, at 5:00pm.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=431387</link>
    </item>
    <item>
      <title street="BUNDA STREET" suburb="PORTSMITH" dateFrom="Monday, June 17, 2013" timeFrom="09:00:00 AM" dateTo="" timeTo="">BUNDA STREET PORTSMITH From Monday, June 17, 2013 09:00:00 AM </title>
      <description><![CDATA[Bunda Street, Portsmith - Commencing: 17 June, at 9:00am planned roadworks are taking place All directions - Detours and lane closures will affect Port Connection Road, Bunda Street, Kenny Street and Draper Street .
All lanes affected. Short delays expected. Allow extra travel time. Expected completion is end of June.

From 17th June, Department of Transport and Main Roads will undertake works to rehabilitate the pavement at six sites along Port Connection Road: 
Kenny Street: 
Draper Street Intersection (roundabout) 
Draper Street to Bunda Street

Bunda Street: 
Kenny St to Hartley St
Hartley St intersection 
Hartley St to Spence St
Aplin St intersection 

Cairns Regional Council has been contracted to carry out the works which are expected to take approximately two weeks, weather permitting. When complete, this project will significantly improve the condition of the road along these sections. 

Where possible, these works will be carried out at night and on weekends to reduce the impact on business accesses. however there may be times when access must be temporarily restricted.
]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=430176</link>
    </item>
    <item>
      <title street="CAPTAIN COOK HIGHWAY" suburb="ELLIS BEACH" dateFrom="Monday, June 17, 2013" timeFrom="09:00:00 AM" dateTo="" timeTo="">CAPTAIN COOK HIGHWAY ELLIS BEACH From Monday, June 17, 2013 09:00:00 AM </title>
      <description><![CDATA[Captain Cook Highway, Ellis Beach - Commencing: 17 June, at 9:00am planned roadworks are taking place All directions - Widening of the highway through ellis beach .
Partial lane closures. Short delays expected. Allow extra travel time. Expected completion is end August 2013.

Traffic control will be undertaken to enable widening of the road through this area]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=431381</link>
    </item>
    <item>
      <title street="SHUTE HARBOUR ROAD" suburb="SHUTE HARBOUR" dateFrom="Monday, June 17, 2013" timeFrom="08:00:00 AM" dateTo="Wednesday, June 19, 2013" timeTo="05:00:00 PM">SHUTE HARBOUR ROAD SHUTE HARBOUR From Monday, June 17, 2013 08:00:00 AM to Wednesday, June 19, 2013 05:00:00 PM</title>
      <description><![CDATA[Shute Harbour Road, Shute Harbour - Commencing: 17 June, at 8:00am planned roadworks are taking place Both Directions - Between Ferntree Road and the harbour.
Single lane in operation. Medium delays expected. Allow extra travel time. Expected completion is 19 June, at 5:00pm.

Reseal works will occur on Proserpine Shute Harbour Road between Ferntree Road and the harbour between Monday 17 June through to Wednesday 19 June (8am to 5pm).  Those wishing to access Shute Harbour ferry services are advised to allow an additional 30 minutes travel time during this period.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=429191</link>
    </item>
    <item>
      <title street="QUINTIN STREET" suburb="ROMA" dateFrom="Monday, June 17, 2013" timeFrom="08:00:00 AM" dateTo="" timeTo="">QUINTIN STREET ROMA From Monday, June 17, 2013 08:00:00 AM </title>
      <description><![CDATA[Quintin Street, Roma - Commencing: 17 June 2013, between the hours of  at 8:00am and 4:00pm planned roadworks are taking place Both Directions - Between Mayne Street and Chrystal Street Roma.
Partial lane closures. Short delays expected. Changed traffic conditions. Expected completion is 21 June 2013, weather permitting.

On Site during working hours (8am-4pm): Reduced Speed 40km/h, Traffic Control on Scene with possible delays of up to 5 minutes can be expected.

On Site During NON working hours and Overnight(4pm-8am): Returned to normal traffic conditions. ]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=426436</link>
    </item>
    <item>
      <title street="VERHOEVEN DRIVE" suburb="DOUGLAS" dateFrom="Monday, June 17, 2013" timeFrom="07:00:00 AM" dateTo="Wednesday, June 26, 2013" timeTo="03:00:00 PM">VERHOEVEN DRIVE DOUGLAS From Monday, June 17, 2013 07:00:00 AM to Wednesday, June 26, 2013 03:00:00 PM</title>
      <description><![CDATA[Verhoeven Drive, Douglas - Commencing: 17 June, at 7:00am planned roadworks are taking place Northbound - Just after the Angus Smith Drive and University Road roundabout.
No blockage. No delays expected. Observe signage. Expected completion is 26 June, at 3:00pm.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=431685</link>
    </item>
    <item>
      <title street="NATHAN STREET" suburb="AITKENVALE" dateFrom="Monday, June 17, 2013" timeFrom="07:00:00 AM" dateTo="Monday, July 01, 2013" timeTo="03:00:00 PM">NATHAN STREET AITKENVALE From Monday, June 17, 2013 07:00:00 AM to Monday, July 01, 2013 03:00:00 PM</title>
      <description><![CDATA[Nathan Street, Aitkenvale - Commencing: 17 June, at 7:00am planned roadworks are taking place Eastbound - From Bergin Road to Charles Street.
Partial lane closures. No delays expected. Proceed with caution. Expected completion is 01 July, at 3:00pm.

Vegetation Maintenance]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=430290</link>
    </item>
    <item>
      <title street="NATHAN STREET" suburb="AITKENVALE" dateFrom="Monday, June 17, 2013" timeFrom="07:00:00 AM" dateTo="Monday, July 01, 2013" timeTo="03:00:00 PM">NATHAN STREET AITKENVALE From Monday, June 17, 2013 07:00:00 AM to Monday, July 01, 2013 03:00:00 PM</title>
      <description><![CDATA[Nathan Street, Aitkenvale - Commencing: 17 June, at 7:00am planned roadworks are taking place Northbound - From China Street to Bamford Lane.
No blockage. No delays expected. Observe signage. Expected completion is 01 July, at 3:00pm.

Vegetation Maintenance]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=430291</link>
    </item>
    <item>
      <title street="DALBY KOGAN ROAD" suburb="DALBY" dateFrom="Monday, June 17, 2013" timeFrom="06:00:00 AM" dateTo="" timeTo="">DALBY KOGAN ROAD DALBY From Monday, June 17, 2013 06:00:00 AM </title>
      <description><![CDATA[Dalby Kogan Road, Dalby - Commencing: 24 June, between the hours of 6:00am and 6:00pm planned roadworks are taking place Both Directions - Approx 1 kilometre west of Dalby.
Single lane in operation. Short delays expected. Changed traffic conditions. Expected completion is 31 July 2013, weather permitting.

On Site during working hours (6am-6pm): Reduced Speed Limit 40km/h, traffic control on scene with possible delays of 5 minutes.

On Site During NON working hours: Reduced Speed Limit 60km/hr, Traffic Control on scene with possible delays of 5 minutes.

Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au ]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=431382</link>
    </item>
    <item>
      <title street="WARREGO HIGHWAY" suburb="MARBURG" dateFrom="Saturday, June 15, 2013" timeFrom="12:00:00 AM" dateTo="Saturday, June 29, 2013" timeTo="06:00:00 PM">WARREGO HIGHWAY MARBURG From Saturday, June 15, 2013 12:00:00 AM to Saturday, June 29, 2013 06:00:00 PM</title>
      <description><![CDATA[Warrego Highway, Marburg - Commencing: 15 June, at 12:00am planned roadworks are taking place Westbound.
Single lane in operation. Short delays expected. Reduced speed limit (60km/h). Expected completion is 29 June, at 6:00pm.

Reconstruction works are underway to repair the road shoulder along the Warrego Highway at Marburg.

Works will generally be undertaken during the day, from 6am to 6pm, Monday to Saturday. 

A single lane closure is required for the duration of this section of work. 

For more information please contact the project team on 1800 063 397 or email reconstruct_metropolitan@tmr.qld.gov.au
]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=430379</link>
    </item>
    <item>
      <title street="GOLD COAST HIGHWAY" suburb="BILINGA" dateFrom="Friday, June 14, 2013" timeFrom="04:51:00 PM" dateTo="Saturday, June 22, 2013" timeTo="12:00:00 AM">GOLD COAST HIGHWAY BILINGA From Friday, June 14, 2013 04:51:00 PM to Saturday, June 22, 2013 12:00:00 AM</title>
      <description><![CDATA[Gold Coast Highway, Bilinga - Commencing: 14 June, at 4:51pm planned roadworks are taking place Northbound - Gold Coast Highway, northbound. 
Sunday 16 June to Friday 21 June from 5pm to 5am. .
Single lane in operation. Short delays expected. Changed traffic conditions. Expected completion is 22 June, at 12:00am.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=429820</link>
    </item>
    <item>
      <title street="NATHAN STREET" suburb="VINCENT" dateFrom="Friday, June 14, 2013" timeFrom="01:45:00 PM" dateTo="Thursday, September 12, 2013" timeTo="06:00:00 PM">NATHAN STREET VINCENT From Friday, June 14, 2013 01:45:00 PM to Thursday, September 12, 2013 06:00:00 PM</title>
      <description><![CDATA[Nathan Street, Vincent - Commencing: 12 June, at 6:00am planned roadworks are taking place Both Directions - Between Bergin Road and Dalrymple Service Road.
Partial lane closures. Unknown traffic impact. Proceed with caution. Expected completion is 12 September, at 6:00pm.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=430180</link>
    </item>
    <item>
      <title street="NEW ENGLAND HIGHWAY" suburb="NOBBY" dateFrom="Thursday, June 13, 2013" timeFrom="09:00:00 AM" dateTo="" timeTo="">NEW ENGLAND HIGHWAY NOBBY From Thursday, June 13, 2013 09:00:00 AM </title>
      <description><![CDATA[New England Highway, Nobby - Commencing: 27 June 2013, between the hours of 9:30am to 2:30pm. planned roadworks are taking place Both Directions - Between Pilton Road and Fett Road.
One lane blocked. Short delays expected. Changed traffic conditions. Expected completion is 11 July 2013, weather permitting.

On Site during working hours (9:30am-2:30pm): Reduced Speed Limit 40km/h, Traffic control on site with possible delays of up to 5 minutes.

On Site During NON working hours (2:30pm-9:30am): Returned to normal traffic conditions. ]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=432797</link>
    </item>
    <item>
      <title street="KINGSTON ROAD" suburb="LOGANLEA" dateFrom="Wednesday, June 12, 2013" timeFrom="06:00:00 PM" dateTo="Wednesday, June 26, 2013" timeTo="06:00:00 AM">KINGSTON ROAD LOGANLEA From Wednesday, June 12, 2013 06:00:00 PM to Wednesday, June 26, 2013 06:00:00 AM</title>
      <description><![CDATA[Kingston Road, Loganlea - Commencing: 12 June, at 6:00pm planned roadworks are taking place All directions - At the intersection of Station Road.
Lane or lanes reduced. No delays expected. Changed traffic conditions. Expected completion is 26 June, at 6:00am.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=429187</link>
    </item>
    <item>
      <title street="LOGAN RIVER ROAD" suburb="HOLMVIEW" dateFrom="Wednesday, June 12, 2013" timeFrom="06:00:00 PM" dateTo="Wednesday, June 26, 2013" timeTo="06:00:00 AM">LOGAN RIVER ROAD HOLMVIEW From Wednesday, June 12, 2013 06:00:00 PM to Wednesday, June 26, 2013 06:00:00 AM</title>
      <description><![CDATA[Logan River Road, Holmview - Commencing: 12 June, at 6:00pm planned roadworks are taking place All directions - At the intersection of Holmview Road.
Lane or lanes reduced. Unknown traffic impact. Changed traffic conditions. Expected completion is 26 June, at 6:00am.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=429188</link>
    </item>
    <item>
      <title street="PENINSULA DEVELOPMENTAL ROAD" suburb="LAURA" dateFrom="Wednesday, June 12, 2013" timeFrom="02:22:00 PM" dateTo="" timeTo="">PENINSULA DEVELOPMENTAL ROAD LAURA From Wednesday, June 12, 2013 02:22:00 PM </title>
      <description><![CDATA[Peninsula Developmental Road, Laura - Commencing: 24 June, at 6:30am planned roadworks are taking place Both Directions - Various sections along the road between Rocky Creek and North Kennedy Seal.
One lane closed. Short delays expected. Changed traffic conditions. Expected completion is end September 2013.

Resheeting of the road]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=429184</link>
    </item>
    <item>
      <title street="BUNDA STREET" suburb="CAIRNS CITY" dateFrom="Wednesday, June 12, 2013" timeFrom="11:04:00 AM" dateTo="" timeTo="">BUNDA STREET CAIRNS CITY From Wednesday, June 12, 2013 11:04:00 AM </title>
      <description><![CDATA[Bunda Street, Cairns City - Commencing: 17 June, at 9:00am planned roadworks are taking place Outbound - Heavy traffic will be diverted to Draper Street from Bunda Street.
One lane closed. Short delays expected. Traffic control on scene. Expected completion is 17 June, at 3:00pm.

Culvert works]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=429167</link>
    </item>
    <item>
      <title street="KARRABIN ROSEWOOD ROAD" suburb="THAGOONA" dateFrom="Wednesday, June 12, 2013" timeFrom="09:00:00 AM" dateTo="Friday, June 28, 2013" timeTo="06:00:00 PM">KARRABIN ROSEWOOD ROAD THAGOONA From Wednesday, June 12, 2013 09:00:00 AM to Friday, June 28, 2013 06:00:00 PM</title>
      <description><![CDATA[Karrabin Rosewood Road, Thagoona - Commencing: 12 June, at 9:00am planned roadworks are taking place Both Directions.
Short delays expected. Changed traffic conditions. Expected completion is 28 June, at 6:00pm.

Construction works have begun to carry out road shoulder widening and install guardrail on Karrabin-Rosewood Road at O'Shea Gully, Thagoona.

Works will be done between 7am and 5pm, Monday to Friday, weather and construction permitting. Works are expected to be completed 28 June 2013.

Some traffic delays, construction noise and reduced speed limits can be expected.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=429193</link>
    </item>
    <item>
      <title street="GOLD COAST HIGHWAY" suburb="TUGUN" dateFrom="Wednesday, June 12, 2013" timeFrom="06:00:00 AM" dateTo="" timeTo="">GOLD COAST HIGHWAY TUGUN From Wednesday, June 12, 2013 06:00:00 AM </title>
      <description><![CDATA[Gold Coast Highway, Tugun - Commencing: 12 June, at 6:00am planned roadworks are taking place Both Directions - At Sand Street.
Partial lane closures. No delays expected. Changed traffic conditions. Expected completion is 24 June 2013.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=428564</link>
    </item>
    <item>
      <title street="BRISBANE ROAD" suburb="ARUNDEL" dateFrom="Wednesday, June 12, 2013" timeFrom="06:00:00 AM" dateTo="Thursday, June 27, 2013" timeTo="06:00:00 PM">BRISBANE ROAD ARUNDEL From Wednesday, June 12, 2013 06:00:00 AM to Thursday, June 27, 2013 06:00:00 PM</title>
      <description><![CDATA[Brisbane Road, Arundel - Commencing: 12 June, at 6:00am planned roadworks are taking place All directions - At the intersection of Telford Place.
Partial lane closures. Unknown traffic impact. Changed traffic conditions. Expected completion is 27 June, at 6:00pm.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=429179</link>
    </item>
    <item>
      <title street="GORE HIGHWAY" suburb="YARRANLEA" dateFrom="Wednesday, June 12, 2013" timeFrom="06:00:00 AM" dateTo="" timeTo="">GORE HIGHWAY YARRANLEA From Wednesday, June 12, 2013 06:00:00 AM </title>
      <description><![CDATA[Gore Highway, Yarranlea - Commencing: 11 June 2013, between the hours of 6:00am and 6:00pm planned roadworks are taking place Both Directions - Between Heinemann Road and Taylor Road.
Single lane in operation. Medium delays expected. Changed traffic conditions. Expected completion is 27 June 2013, weather permitting.

On Site during working hours (6am-6pm): Reduced Speed Limit 40km/h, single lane in operation, portable traffic signals on site with possible delays of up to 15 minutes.

On Site During NON working hours and Overnight (6pm-6am): Reduced Speed Limit 60km/h. single lane in operation, portable traffic signals with possible delays of up to 15 minutes

Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au ]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=429171</link>
    </item>
    <item>
      <title street="GORE HIGHWAY" suburb="YARRANLEA" dateFrom="Wednesday, June 12, 2013" timeFrom="06:00:00 AM" dateTo="" timeTo="">GORE HIGHWAY YARRANLEA From Wednesday, June 12, 2013 06:00:00 AM </title>
      <description><![CDATA[Gore Highway, Yarranlea - Commencing: 14 June 2013, between the hours of 6:00am and 6:00pm planned roadworks are taking place Both Directions - Between intersection with Millmerran Leyburn Road and Lindenmeyer Road.
Single lane in operation. Medium delays expected. Changed traffic conditions. Expected completion is 01 July 2013, weather permitting.

On Site during working hours (6am-6pm): Reduced Speed Limit 40km/h, single lane in operation, portable traffic signals on site with possible delays of up to 15 minutes.

On Site During NON working hours and Overnight (6pm-6am): Reduced Speed Limit 60km/h. single lane in operation, portable traffic signals with possible delays of up to 15 minutes

Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au ]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=429178</link>
    </item>
    <item>
      <title street="WARREGO HIGHWAY" suburb="CROWLEY VALE" dateFrom="Wednesday, June 12, 2013" timeFrom="12:00:00 AM" dateTo="Thursday, August 29, 2013" timeTo="06:00:00 PM">WARREGO HIGHWAY CROWLEY VALE From Wednesday, June 12, 2013 12:00:00 AM to Thursday, August 29, 2013 06:00:00 PM</title>
      <description><![CDATA[Warrego Highway, Crowley Vale - Commencing: 12 June, at 12:00am planned roadworks are taking place Both Directions.
Both lanes affected. Short delays expected. Allow extra travel time. Expected completion is 29 August, at 6:00pm.

Road safety and flood reconstruction works are underway along the Warrego Highway at Crowley Vale.

Works will generally be undertaken during the day, from 6am to 6pm, Monday to Saturday however some night works will be required. 

For more information please contact the project team on 1800 063 397 or email reconstruct_metropolitan@tmr.qld.gov.au
]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=428582</link>
    </item>
    <item>
      <title street="SEVENTH AVENUE" suburb="HOME HILL" dateFrom="Tuesday, June 11, 2013" timeFrom="03:10:00 PM" dateTo="Wednesday, September 18, 2013" timeTo="06:00:00 PM">SEVENTH AVENUE HOME HILL From Tuesday, June 11, 2013 03:10:00 PM to Wednesday, September 18, 2013 06:00:00 PM</title>
      <description><![CDATA[Seventh Avenue, Home Hill - Commencing: 11 June, at 3:10pm planned roadworks are taking place Both Directions - Between fifteenth Street and the Inkerman tram line.
Partial lane closures. Short delays expected. Changed traffic conditions. Expected completion is 18 September, at 6:00pm.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=428850</link>
    </item>
    <item>
      <title street="BRUCE HIGHWAY" suburb="TULLY" dateFrom="Tuesday, June 11, 2013" timeFrom="02:58:00 PM" dateTo="" timeTo="">BRUCE HIGHWAY TULLY From Tuesday, June 11, 2013 02:58:00 PM </title>
      <description><![CDATA[Bruce Highway, Tully - Commencing: 11 June, at 7:00am planned roadworks are taking place All directions - At the intersection of Bruce Highway and Muldoon Road. There is a intersection shutdown scheduled for Wednesday 19 June between 9am - 3pm. Intersection will be under Police control.
All lanes affected. Unknown traffic impact. Observe signage. Expected completion is early July.

Intersection upgrade ]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=425957</link>
    </item>
    <item>
      <title street="BRUCE HIGHWAY" suburb="ROLLINGSTONE" dateFrom="Tuesday, June 11, 2013" timeFrom="02:11:00 PM" dateTo="Wednesday, July 31, 2013" timeTo="04:00:00 PM">BRUCE HIGHWAY ROLLINGSTONE From Tuesday, June 11, 2013 02:11:00 PM to Wednesday, July 31, 2013 04:00:00 PM</title>
      <description><![CDATA[Bruce Highway, Rollingstone - Commencing: 11 June, at 2:11pm planned roadworks are taking place Both Directions - Works near the Rollingstone Weigh Pad will require traffic controllers and speed restrictions during the day and traffic signals after hours.  Motorists can expect delays of up to 15 minutes. .
Partial lane closures. Short delays expected. Changed traffic conditions. Expected completion is 31 July, at 4:00pm.

Wide loads of more than 3.5m are directed to contact Steve Coulter on 0408 066 443 or Chris MacDonald 0429 413 912 prior to passing through the roadworks]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=428847</link>
    </item>
    <item>
      <title street="HERVEY RANGE ROAD" suburb="RANGEWOOD" dateFrom="Tuesday, June 11, 2013" timeFrom="07:00:00 AM" dateTo="Friday, June 21, 2013" timeTo="12:00:00 AM">HERVEY RANGE ROAD RANGEWOOD From Tuesday, June 11, 2013 07:00:00 AM to Friday, June 21, 2013 12:00:00 AM</title>
      <description><![CDATA[Hervey Range Road, Rangewood - Commencing: 11 June, at 7:00am planned roadworks are taking place Both Directions - Between Ridge and Rupertswood Drive.
All lanes affected. No delays expected. Changed traffic conditions. Expected completion is 21 June, at 12:00am.

Speed reductions and single lane closure on Hervey Range Road for reseal works on Ridge and Rupertswood Dve]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=427145</link>
    </item>
    <item>
      <title street="DALRYMPLE ROAD" suburb="MOUNT LOUISA" dateFrom="Tuesday, June 11, 2013" timeFrom="07:00:00 AM" dateTo="Thursday, July 11, 2013" timeTo="07:00:00 PM">DALRYMPLE ROAD MOUNT LOUISA From Tuesday, June 11, 2013 07:00:00 AM to Thursday, July 11, 2013 07:00:00 PM</title>
      <description><![CDATA[Dalrymple Road, Mount Louisa - Commencing: 11 June, at 7:00am planned roadworks are taking place Both Directions - Construction of Dalrymple Road Greg Jabs Drive intersection.
Both lanes affected. No delays expected. Observe signage. Expected completion is 11 July, at 7:00pm.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=427144</link>
    </item>
    <item>
      <title street="WILLIAMS ROAD" suburb="ALLIGATOR CREEK" dateFrom="Tuesday, June 11, 2013" timeFrom="06:00:00 AM" dateTo="Friday, June 21, 2013" timeTo="06:00:00 PM">WILLIAMS ROAD ALLIGATOR CREEK From Tuesday, June 11, 2013 06:00:00 AM to Friday, June 21, 2013 06:00:00 PM</title>
      <description><![CDATA[Williams Road, Alligator Creek - Commencing: 11 June, at 6:00am planned roadworks are taking place All directions - Reseal  program on TCC Roads.
Partial lane closures. Short delays expected. Observe signage. Expected completion is 21 June, at 6:00pm.

Roadworks on the intersections at Williams, Purono and Muntalunga and the Bruce Highway.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=427146</link>
    </item>
    <item>
      <title street="SARINA MARLBOROUGH ROAD" suburb="SARINA RANGE" dateFrom="Tuesday, June 11, 2013" timeFrom="06:00:00 AM" dateTo="Friday, June 28, 2013" timeTo="06:00:00 PM">SARINA MARLBOROUGH ROAD SARINA RANGE From Tuesday, June 11, 2013 06:00:00 AM to Friday, June 28, 2013 06:00:00 PM</title>
      <description><![CDATA[Sarina Marlborough Road, Sarina Range - Commencing: 11 June, at 6:00am planned roadworks are taking place Both Directions - South of Oxford Downs Road intersection.
All lanes affected. Short delays expected. Allow extra travel time. Expected completion is 28 June, at 6:00pm.

Motorists are advised to expect delays of around thirty minutes.

Longer delays of up to three hours can be expected while asphalt works are being completed.  The dates for the asphalt works will be posted prior to them being undertaken.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=426433</link>
    </item>
    <item>
      <title street="IPSWICH MOTORWAY ON RAMP" suburb="DINMORE" dateFrom="Monday, June 10, 2013" timeFrom="08:00:00 PM" dateTo="Thursday, June 20, 2013" timeTo="04:30:00 AM">IPSWICH MOTORWAY ON RAMP DINMORE From Monday, June 10, 2013 08:00:00 PM to Thursday, June 20, 2013 04:30:00 AM</title>
      <description><![CDATA[Ipswich Motorway On Ramp, Dinmore - Commencing: 10 June, at 8:00pm planned roadworks are taking place Both Directions - Centenary Motorway at Sumner Park to Logan Motorway and Ipswich Motorway between Darra and Dinmore including all on and off ramps.
Lane or lanes reduced. No delays expected. Traffic control on scene. Expected completion is 20 June, at 4:30am.

Motorway maintenance teams onsite]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=425328</link>
    </item>
    <item>
      <title street="BOUNDARY STREET" suburb="HERMIT PARK" dateFrom="Monday, June 10, 2013" timeFrom="07:30:00 AM" dateTo="Friday, July 26, 2013" timeTo="03:00:00 PM">BOUNDARY STREET HERMIT PARK From Monday, June 10, 2013 07:30:00 AM to Friday, July 26, 2013 03:00:00 PM</title>
      <description><![CDATA[Boundary Street, Hermit Park - Commencing: 10 June, at 7:30am planned roadworks are taking place All directions - Installation of infrastructure for special event along Boundary Street, Charters Towers Road and Railway Avenue.
Partial lane closures. Unknown traffic impact. Observe signage. Expected completion is 26 July, at 3:00pm.

Night Works will take place on 13 June and 14 June 2013 between the hours of 6:00pm and 6:00am]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=425637</link>
    </item>
    <item>
      <title street="ROSS RIVER ROAD" suburb="MUNDINGBURRA" dateFrom="Saturday, June 08, 2013" timeFrom="07:00:00 AM" dateTo="Thursday, August 08, 2013" timeTo="04:00:00 PM">ROSS RIVER ROAD MUNDINGBURRA From Saturday, June 08, 2013 07:00:00 AM to Thursday, August 08, 2013 04:00:00 PM</title>
      <description><![CDATA[Ross River Road, Mundingburra - Commencing: 08 June, at 7:00am planned roadworks are taking place - Various points between Balls Lane and Charlotte Street.
Partial lane closures. Short delays expected. Observe signage. Expected completion is 08 August, at 4:00pm.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=426450</link>
    </item>
    <item>
      <title street="BEENLEIGH REDLAND BAY ROAD" suburb="CORNUBIA" dateFrom="Friday, June 07, 2013" timeFrom="08:59:00 AM" dateTo="Friday, June 07, 2013" timeTo="03:00:00 PM">BEENLEIGH REDLAND BAY ROAD CORNUBIA From Friday, June 07, 2013 08:59:00 AM to Friday, June 07, 2013 03:00:00 PM</title>
      <description><![CDATA[Beenleigh Redland Bay Road, Cornubia - Commencing: 07 June, at 8:59am planned roadworks are taking place Eastbound - -27.670226,153.202368.
One lane closed. Medium delays expected. Proceed with caution. Expected completion is 07 June, at 3:00pm.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=426473</link>
    </item>
    <item>
      <title street="RIVERWAY DRIVE" suburb="RASMUSSEN" dateFrom="Friday, June 07, 2013" timeFrom="07:00:00 AM" dateTo="Saturday, November 30, 2013" timeTo="05:00:00 PM">RIVERWAY DRIVE RASMUSSEN From Friday, June 07, 2013 07:00:00 AM to Saturday, November 30, 2013 05:00:00 PM</title>
      <description><![CDATA[Riverway Drive, Rasmussen - Commencing: 07 June, at 7:00am planned roadworks are taking place Both Directions - Between Santal Drive and Sonia Street.
Partial lane closures. No delays expected. Use alternative route. Expected completion is 30 November, at 5:00pm.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=427143</link>
    </item>
    <item>
      <title street="GATTON CLIFTON ROAD" suburb="FORDSDALE" dateFrom="Friday, June 07, 2013" timeFrom="06:00:00 AM" dateTo="Sunday, December 01, 2013" timeTo="06:00:00 PM">GATTON CLIFTON ROAD FORDSDALE From Friday, June 07, 2013 06:00:00 AM to Sunday, December 01, 2013 06:00:00 PM</title>
      <description><![CDATA[Gatton Clifton Road, Fordsdale - Commencing: 07 June, at 6:00am planned roadworks are taking place Both Directions.
All lanes affected. Short delays expected. Observe signage. Expected completion is 01 December, at 6:00pm.

Flood reconstruction works are occurring on Gatton Clifton Road.  Works start in mid-June 2013 and will be completed by the end of 2013, weather permitting.  Works will be carried out Monday to Friday from 6.00am to 6.00pm.  Motorists can expect some delays and lane closures for the duration of the project.  For more information please contact the project team on 1800 063 397 or email reconstrust_metropolitan@tmr.qld.gov.au]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=423141</link>
    </item>
    <item>
      <title street="TAMBORINE OXENFORD ROAD" suburb="OXENFORD" dateFrom="Thursday, June 06, 2013" timeFrom="04:06:00 PM" dateTo="" timeTo="">TAMBORINE OXENFORD ROAD OXENFORD From Thursday, June 06, 2013 04:06:00 PM </title>
      <description><![CDATA[Tamborine Oxenford Road, Oxenford - Commencing: March 2013 planned roadworks are taking place All directions - Motorists can expect long delays near John Muntz Causeway from 17 June 2013 between 7am and 5pm..
Single lane in operation. Long delays expected. Allow extra travel time. Expected completion is early 2014.

From 17 June 2013 Coomera-Gorge Road(Maudsland Road)near the intersection with Tamborine-Oxenford Road, will be single lane under stop/go traffic control from 7am to 5pm.  Motorists should expect long delays and seek alternate routes.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=382767</link>
    </item>
    <item>
      <title street="BRUCE HIGHWAY" suburb="TULLY" dateFrom="Wednesday, June 05, 2013" timeFrom="09:00:00 AM" dateTo="" timeTo="">BRUCE HIGHWAY TULLY From Wednesday, June 05, 2013 09:00:00 AM </title>
      <description><![CDATA[Bruce Highway, Tully - Commencing: 05 June, at 9:00am planned roadworks are taking place All directions - Intersection of Bruce Hwy and Butler Street.
No blockage. Short delays expected. Proceed with caution. Expected completion is end of June.

Intersection upgrade]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=425325</link>
    </item>
    <item>
      <title street="CARNARVON HIGHWAY" suburb="THALLON" dateFrom="Wednesday, June 05, 2013" timeFrom="06:00:00 AM" dateTo="" timeTo="">CARNARVON HIGHWAY THALLON From Wednesday, June 05, 2013 06:00:00 AM </title>
      <description><![CDATA[Carnarvon Highway, Thallon - Commencing: 19 July 2012, between the hours of at 6:00am and 6:00pm Monday to Sunday planned roadworks are taking place Both Directions - MULTIPLE SITES between Nindigully and Mungindi.
Single lane in operation. Medium delays expected. Changed traffic conditions. Expected completion is 15 August 2013, weather permitting.

Reduced Speed Limit 40km/h, Portable Traffic Signals on site with possible delays of up to 10 minutes at EACH SITE. Please allow extra travel time.

On Site During NON working hours and Overnight (6pm-6am): Reduced Speed Limit 40km/h. Portable Traffic Signals on site with possible delays of up to 10 minutes at EACH SITE. Please allow extra travel time.

Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=425919</link>
    </item>
    <item>
      <title street="MOONIE HIGHWAY" suburb="ST GEORGE" dateFrom="Wednesday, June 05, 2013" timeFrom="06:00:00 AM" dateTo="" timeTo="">MOONIE HIGHWAY ST GEORGE From Wednesday, June 05, 2013 06:00:00 AM </title>
      <description><![CDATA[Moonie Highway, St George - Commencing: 19 July 2012, between the hours of 6:00am and 6:00pm Monday to Sunday planned roadworks are taking place Both Directions - MULTIPLE SITES between St George and Westmar .
Single lane in operation. Medium delays expected. Changed traffic conditions. Expected completion is 15 August 2013, weather permitting.

Reduced Speed Limit 40km/h, Portable Traffic Signals on site with possible delays of up to 10 minutes at EACH SITE. Please allow extra travel time.

On Site During NON working hours and Overnight (6pm-6am): Reduced Speed Limit 40km/h. Portable Traffic Signals on site with possible delays of up to 10 minutes at EACH SITE. Please allow extra travel time.

Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=425921</link>
    </item>
    <item>
      <title street="COLLINSVILLE ELPHINSTONE ROAD" suburb="GLENDEN" dateFrom="Tuesday, June 04, 2013" timeFrom="12:09:00 PM" dateTo="Monday, July 01, 2013" timeTo="06:00:00 PM">COLLINSVILLE ELPHINSTONE ROAD GLENDEN From Tuesday, June 04, 2013 12:09:00 PM to Monday, July 01, 2013 06:00:00 PM</title>
      <description><![CDATA[Collinsville Elphinstone Road, Glenden - Commencing: 04 June, at 12:09pm planned roadworks are taking place Both Directions - Between Plum Creek and Elphinstone.
Limited to one lane. Short delays expected. Changed traffic conditions. Expected completion is 01 July, at 6:00pm.

Reconstruction works are occurring on various sections of Collinsville–Elphinstone Road between Plum Creek and Elphinstone.  These works are expected to be completed in early July 2013, weather permitting. 

Traffic control, single lane closures and speed restrictions will be used as required. Motorists should drive to the conditions and obey all signage for their own safety and the safety of roadworkers. For further information, please contact the Mackay/Whitsunday region on 1300 736 754.
]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=425336</link>
    </item>
    <item>
      <title street="PACIFIC HIGHWAY" suburb="MERRIMAC" dateFrom="Monday, June 03, 2013" timeFrom="03:40:00 PM" dateTo="Monday, June 30, 2014" timeTo="04:00:00 PM">PACIFIC HIGHWAY MERRIMAC From Monday, June 03, 2013 03:40:00 PM to Monday, June 30, 2014 04:00:00 PM</title>
      <description><![CDATA[Pacific Highway, Merrimac - Commencing: 03 June, at 3:40pm planned roadworks are taking place Both Directions.
Both lanes affected. Short delays expected. Changed traffic conditions. Expected completion is 30 June, at 4:00pm.

M1 Upgrade from Worongary (Exit 77) to Mudgeeraba (Exit 79) will have reduced speed to 60km/h during the day. Night works will require lane closures and reduced speed to 40km/h. 
Bridge works are currently underway which will require noisy piling activities.  ]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=424742</link>
    </item>
    <item>
      <title street="ROSS RIVER ROAD" suburb="MYSTERTON" dateFrom="Monday, June 03, 2013" timeFrom="07:00:00 AM" dateTo="Friday, June 21, 2013" timeTo="06:00:00 PM">ROSS RIVER ROAD MYSTERTON From Monday, June 03, 2013 07:00:00 AM to Friday, June 21, 2013 06:00:00 PM</title>
      <description><![CDATA[Ross River Road, Mysterton - Commencing: 03 June, at 7:00am planned roadworks are taking place - Ross River Road, Cross street and Balls Lane intersection. Road Repairs.
Partial lane closures. No delays expected. Observe signage. Expected completion is 21 June, at 6:00pm.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=422308</link>
    </item>
    <item>
      <title street="ROSS RIVER ROAD" suburb="CRANBROOK" dateFrom="Monday, June 03, 2013" timeFrom="06:30:00 AM" dateTo="Saturday, August 03, 2013" timeTo="05:00:00 PM">ROSS RIVER ROAD CRANBROOK From Monday, June 03, 2013 06:30:00 AM to Saturday, August 03, 2013 05:00:00 PM</title>
      <description><![CDATA[Ross River Road, Cranbrook - Commencing: 03 June, at 6:30am planned roadworks are taking place Eastbound - Between Louise Street and Arinya Street.
No blockage. No delays expected. Observe signage. Expected completion is 03 August, at 5:00pm.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=418962</link>
    </item>
    <item>
      <title street="NATHAN STREET" suburb="AITKENVALE" dateFrom="Monday, June 03, 2013" timeFrom="06:00:00 AM" dateTo="Sunday, June 30, 2013" timeTo="04:00:00 PM">NATHAN STREET AITKENVALE From Monday, June 03, 2013 06:00:00 AM to Sunday, June 30, 2013 04:00:00 PM</title>
      <description><![CDATA[Nathan Street, Aitkenvale - Commencing: 03 June, at 6:00am planned roadworks are taking place Southbound - Bus Stop Update between Alfred Street and Arthur Street.
Partial lane closures. Unknown traffic impact. Observe signage. Expected completion is 30 June, at 4:00pm.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=423806</link>
    </item>
    <item>
      <title street="PALMERSTON HIGHWAY" suburb="EAST PALMERSTON" dateFrom="Friday, May 31, 2013" timeFrom="02:17:00 PM" dateTo="" timeTo="">PALMERSTON HIGHWAY EAST PALMERSTON From Friday, May 31, 2013 02:17:00 PM </title>
      <description><![CDATA[Palmerston Highway, East Palmerston - Commencing: 03 June, at 7:00am planned roadworks are taking place Both Directions.
One lane closed. Short delays expected. Changed traffic conditions. Expected completion is 14 June, at 5:00pm.

Asphalt overlay]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=423622</link>
    </item>
    <item>
      <title street="BRUCE HIGHWAY" suburb="CARDWELL" dateFrom="Friday, May 31, 2013" timeFrom="11:21:00 AM" dateTo="" timeTo="">BRUCE HIGHWAY CARDWELL From Friday, May 31, 2013 11:21:00 AM </title>
      <description><![CDATA[Bruce Highway, Cardwell - Commencing: 11 June, at 06:30am planned roadworks are taking place Both Directions.
Lane or lanes reduced. Short delays expected. Changed traffic conditions. Expected completion is 25 June, at 05:30pm.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=423609</link>
    </item>
    <item>
      <title street="WARBURTON STREET" suburb="NORTH WARD" dateFrom="Friday, May 31, 2013" timeFrom="07:00:00 AM" dateTo="Friday, June 28, 2013" timeTo="06:00:00 PM">WARBURTON STREET NORTH WARD From Friday, May 31, 2013 07:00:00 AM to Friday, June 28, 2013 06:00:00 PM</title>
      <description><![CDATA[Warburton Street, North Ward - Commencing: 30 May 2013, 7:00am planned roadworks are taking place Both Directions - Signage on Warburton Street for closure on Eyre Street.
No blockage. No delays expected. Observe signage. Expected completion is 28 June, at 6:00pm.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=423704</link>
    </item>
    <item>
      <title street="GORE HIGHWAY" suburb="YARRANLEA" dateFrom="Friday, May 31, 2013" timeFrom="06:00:00 AM" dateTo="" timeTo="">GORE HIGHWAY YARRANLEA From Friday, May 31, 2013 06:00:00 AM </title>
      <description><![CDATA[Gore Highway, Yarranlea - Commencing: 31 May 2013, between the hours of 6:00am and 6:00pm planned roadworks are taking place Both Directions - Between Heinemann Road and Horrane Road.
Single lane in operation. Medium delays expected. Changed traffic conditions. Expected completion is 19 June 2013, weather permitting.

On Site during working hours (6am-6pm): Reduced Speed Limit 40km/h, single lane in operation, portable traffic signals on site with possible delays of up to 15 minutes.

On Site During NON working hours and Overnight (6pm-6am): Reduced Speed Limit 60km/h. single lane in operation, portable traffic signals with possible delays of up to 15 minutes

Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au ]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=423620</link>
    </item>
    <item>
      <title street="CAPTAIN COOK HIGHWAY" suburb="SMITHFIELD" dateFrom="Wednesday, May 29, 2013" timeFrom="07:00:00 PM" dateTo="" timeTo="">CAPTAIN COOK HIGHWAY SMITHFIELD From Wednesday, May 29, 2013 07:00:00 PM </title>
      <description><![CDATA[Captain Cook Highway, Smithfield - Commencing: 29 May, at 7:00am planned roadworks are taking place Both Directions - Includes Machans Beach Roundabout, Holloways Beach Roundabout, Yorkey's Knob Roundabout, Smithfield Roundabout and Trinity Beach Roundabout.
Lane or lanes reduced. Medium delays expected. Allow extra travel time. Expected completion is late June.

Mill and replacement of existing Asphalt on roundabouts
Current location: Holloways Beach Roundabout
Due to poor overnight weather works are now scheduled for between 7:00am and 6:00pm. Work will happen in the northbound lanes between 7.00am and midday and in the southbound lanes between midday and 6.00pm
Nightworks will resume from 6pm Wednesday 19 June, weather permitting. ]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=421776</link>
    </item>
    <item>
      <title street="MURPHYS CREEK ROAD" suburb="MURPHYS CREEK" dateFrom="Tuesday, May 28, 2013" timeFrom="08:30:00 AM" dateTo="Tuesday, October 01, 2013" timeTo="06:00:00 PM">MURPHYS CREEK ROAD MURPHYS CREEK From Tuesday, May 28, 2013 08:30:00 AM to Tuesday, October 01, 2013 06:00:00 PM</title>
      <description><![CDATA[Murphys Creek Road, Murphys Creek - Commencing: 28 May, at 8:30am planned roadworks are taking place Both Directions.
All lanes affected. Short delays expected. Observe signage. Expected completion is 01 October, at 6:00pm.

Repair works are currently taking place on Murphys Creek Road and will be completed by end of May 2013.
  
Once the works are completed, TMR will advise the road is available as an alternative route to the Toowoomba Range for cars and light trucks.

Motorists using Murphys Creek Road are urged to exercise caution and be mindful of the amenity of residents living on this road and the safety of all road users.

Works on the Toowoomba Range have been ramped up with two lanes operating on the up lanes while adjacent work continues. This is expected to be carried out by the end of June, weather permitting.

There will still be delays, but TMR are continuing to put in place a number of measures to ensure disruptions are kept to a minimum. 

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=421909</link>
    </item>
    <item>
      <title street="WARREGO HIGHWAY" suburb="BOWENVILLE" dateFrom="Tuesday, May 28, 2013" timeFrom="12:00:00 AM" dateTo="" timeTo="">WARREGO HIGHWAY BOWENVILLE From Tuesday, May 28, 2013 12:00:00 AM </title>
      <description><![CDATA[Warrego Highway, Bowenville - Commencing: 30 May 2013, 24 hour planned roadworks are taking place Both Directions - Approximately three kilometres west of the intersection with the Boweville Norwin Road.
Single lane in operation. Medium delays expected. Changed traffic conditions. Expected completion is 30 June 2013, weather permitting.

On Site during working hours (6am-5am): Single lane side track with Reduced Speed Limit 40km/h, Portable Traffic Signals with possible delays of up to 15 minutes.

On Site During NON working hours:  Single lane side track with Reduced Speed Limit 40km/h, Portable Traffic Signals with possible delays of up to 15 minutes.

Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=421907</link>
    </item>
    <item>
      <title street="FLINDERS HIGHWAY" suburb="CAMPASPE" dateFrom="Monday, May 27, 2013" timeFrom="04:23:00 PM" dateTo="Tuesday, July 30, 2013" timeTo="12:00:00 AM">FLINDERS HIGHWAY CAMPASPE From Monday, May 27, 2013 04:23:00 PM to Tuesday, July 30, 2013 12:00:00 AM</title>
      <description><![CDATA[Flinders Highway, Campaspe - Commencing: 27 May, at 4:23pm planned roadworks are taking place Both Directions - Granite Creek Bridge has been reduced down to one lane and a 60km/hr speed limit has been put in place.  These measures have been taken as a precaution until bridge strengthening works can take place. .
One lane blocked. Short delays expected. Changed traffic conditions. Expected completion is 30 July, at 12:00am.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=421794</link>
    </item>
    <item>
      <title street="BRUCE HIGHWAY" suburb="GIRU" dateFrom="Monday, May 27, 2013" timeFrom="07:00:00 AM" dateTo="Thursday, November 28, 2013" timeTo="12:00:00 AM">BRUCE HIGHWAY GIRU From Monday, May 27, 2013 07:00:00 AM to Thursday, November 28, 2013 12:00:00 AM</title>
      <description><![CDATA[Bruce Highway, Giru - Commencing: 27 May, at 7:00am planned roadworks are taking place Both Directions - At the Hodel Road intersection.
Partial lane closures. No delays expected. Observe signage. Expected completion is 28 November, at 12:00am.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=417042</link>
    </item>
    <item>
      <title street="UNIVERSITY ROAD" suburb="DOUGLAS" dateFrom="Monday, May 27, 2013" timeFrom="06:00:00 AM" dateTo="Saturday, June 29, 2013" timeTo="04:00:00 PM">UNIVERSITY ROAD DOUGLAS From Monday, May 27, 2013 06:00:00 AM to Saturday, June 29, 2013 04:00:00 PM</title>
      <description><![CDATA[University Road, Douglas - Commencing: 27 May, at 6:00am planned roadworks are taking place Both Directions - Signage on University Road due to works on Yolanda Drive.
No blockage. No delays expected. Observe signage. Expected completion is 29 June, at 4:00pm.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=420362</link>
    </item>
    <item>
      <title street="WARREGO HIGHWAY" suburb="PLAINLAND" dateFrom="Monday, May 27, 2013" timeFrom="06:00:00 AM" dateTo="Sunday, June 30, 2013" timeTo="05:00:00 PM">WARREGO HIGHWAY PLAINLAND From Monday, May 27, 2013 06:00:00 AM to Sunday, June 30, 2013 05:00:00 PM</title>
      <description><![CDATA[Warrego Highway, Plainland - Commencing: 27 May, at 6:00am planned roadworks are taking place Both Directions - At Cemetery Road and Leschke Road intersection.
Partial lane closures. Short delays expected. Changed traffic conditions. Expected completion is 30 June, at 5:00pm.

The Department of Transport and Main Roads is carrying out works on the Warrego Highway at the intersection with Cemetery Road and Leschke Road in Plainland to improve safety for motorists.

The intersection upgrade will be carried from 27 May to the end of June from 6am to 4pm, weather permitting.

Minor traffic delays and reduced speed limits through the work site may be expected. Traffic controllers will be on-site when required to ensure safety of road workers and motorists. 
]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=419513</link>
    </item>
    <item>
      <title street="BEAUDESERT BEENLEIGH ROAD" suburb="CEDAR CREEK" dateFrom="Monday, May 27, 2013" timeFrom="06:00:00 AM" dateTo="" timeTo="">BEAUDESERT BEENLEIGH ROAD CEDAR CREEK From Monday, May 27, 2013 06:00:00 AM </title>
      <description><![CDATA[Beaudesert Beenleigh Road, Cedar Creek - Commencing: 20 May, at 6:00am planned roadworks are taking place Both Directions - From Tamaree Road to Shaws Pocket Road.
Single lane in operation. Unknown traffic impact. Changed traffic conditions. Expected completion is end June 2013.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=416253</link>
    </item>
    <item>
      <title street="WATERFORD TAMBORINE ROAD" suburb="TAMBORINE" dateFrom="Monday, May 27, 2013" timeFrom="12:00:00 AM" dateTo="" timeTo="">WATERFORD TAMBORINE ROAD TAMBORINE From Monday, May 27, 2013 12:00:00 AM </title>
      <description><![CDATA[Waterford Tamborine Road, Tamborine - Commencing: 27 May planned roadworks are taking place Both Directions - Between Stegemann Road and Tamborine Village roundabout.
Lane or lanes reduced. No delays expected. Changed traffic conditions. Expected completion is end June 2013.

Stop and go traffic conditions at various locations along this stretch of road.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=420187</link>
    </item>
    <item>
      <title street="TIN CAN BAY ROAD" suburb="CANINA" dateFrom="Sunday, May 26, 2013" timeFrom="12:00:00 AM" dateTo="" timeTo="">TIN CAN BAY ROAD CANINA From Sunday, May 26, 2013 12:00:00 AM </title>
      <description><![CDATA[Tin Can Bay Road, Canina - Commencing: Sunday 26 May planned roadworks are taking place Both Directions - Between Kin Kin Road and Goomboorian.
Lane or lanes reduced. Short delays expected. Reduced speed limit (40km/h). Expected completion is Friday 21 June 2013, weather permitting.

Night reconstruction works will be undertaken along Tin Can Bay Road between 6pm and 6am, Sunday to Thursday. Motorists are advised to expect delays of up to five minutes if travelling during these hours. For further information please contact the Department of Transport and Main Roads (Wide Bay/Burnett Region) on 1300 728 390 during business hours.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=419503</link>
    </item>
    <item>
      <title street="FOREST HILL FERNVALE ROAD" suburb="FOREST HILL" dateFrom="Saturday, May 25, 2013" timeFrom="06:00:00 AM" dateTo="Sunday, June 30, 2013" timeTo="06:00:00 PM">FOREST HILL FERNVALE ROAD FOREST HILL From Saturday, May 25, 2013 06:00:00 AM to Sunday, June 30, 2013 06:00:00 PM</title>
      <description><![CDATA[Forest Hill Fernvale Road, Forest Hill - Commencing: 25 May, at 6:00am planned roadworks are taking place Outbound.
Single lane in operation. Short delays expected. Observe signage. Expected completion is 30 June, at 6:00pm.

Reconstruction works are underway on Forest Hill-Fernvale Road.

Works will generally be undertaken during the day from 6am to 6pm, Monday to Saturday.

Overnight lane closures and reduced speed limits are in place.

For more information please contact the project team on 1800 063 397 or email reconstruct_metropolitan@tmr.qld.gov.au]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=406324</link>
    </item>
    <item>
      <title street="PACIFIC MOTORWAY" suburb="YATALA" dateFrom="Friday, May 24, 2013" timeFrom="07:00:00 PM" dateTo="Wednesday, July 17, 2013" timeTo="05:00:00 AM">PACIFIC MOTORWAY YATALA From Friday, May 24, 2013 07:00:00 PM to Wednesday, July 17, 2013 05:00:00 AM</title>
      <description><![CDATA[Pacific Motorway, Yatala - Commencing: 24 May, at 7:00pm planned roadworks are taking place All directions - Yatala South Interchange (Exit 41) including the eastern and western roundabout, on and off-ramps and the M1 overpass.
Lane or lanes reduced. Short delays expected. Observe signage. Expected completion is 17 July, at 5:00am.

These works will commence tonight, Friday 24 May 2013 from 7pm until 5am and continue intermittently between 8pm and 5am until mid July 2013.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=420180</link>
    </item>
    <item>
      <title street="NEW ENGLAND HIGHWAY" suburb="GREENMOUNT" dateFrom="Friday, May 24, 2013" timeFrom="06:30:00 PM" dateTo="" timeTo="">NEW ENGLAND HIGHWAY GREENMOUNT From Friday, May 24, 2013 06:30:00 PM </title>
      <description><![CDATA[New England Highway, Greenmount - Commencing: 20 May 2013, NIGHTWORKS Sunday to Friday between the hours of 6:30pm to 6:00am planned roadworks are taking place Both Directions - Between Cambooya Connection Road and Nobby Connection Road.
Single lane in operation. Short delays expected. Changed traffic conditions. Expected completion is 30 June 2013, weather permitting.

On Site during working hours NIGHTWORKS (6:30pm-6am): Reduced Speed Limit 40km/h, Traffic control on site with possible delays of up to 5 minutes.

On Site During NON working hours (6am-6:30pm): Returned to normal traffic conditions.

Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au ]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=420169</link>
    </item>
    <item>
      <title street="PENINSULA DEVELOPMENTAL ROAD" suburb="COEN" dateFrom="Friday, May 24, 2013" timeFrom="06:29:00 PM" dateTo="" timeTo="">PENINSULA DEVELOPMENTAL ROAD COEN From Friday, May 24, 2013 06:29:00 PM </title>
      <description><![CDATA[Peninsula Developmental Road, Coen - Commencing: 27 May, at 6:30am planned roadworks are taking place Both Directions - Works are scheduled between the Port Stewart turnoff seal and Coen.
One lane closed. Short delays expected. Changed traffic conditions. Expected completion is end August 2013.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=420214</link>
    </item>
    <item>
      <title street="WOOLCOCK STREET" suburb="COSGROVE" dateFrom="Friday, May 24, 2013" timeFrom="06:00:00 AM" dateTo="Monday, September 30, 2013" timeTo="06:00:00 PM">WOOLCOCK STREET COSGROVE From Friday, May 24, 2013 06:00:00 AM to Monday, September 30, 2013 06:00:00 PM</title>
      <description><![CDATA[Woolcock Street, Cosgrove - Commencing: 14 May 2013 at 6:00am planned roadworks are taking place Both Directions - 500m west of Weston Street intersection.
No delays expected. Observe signage. Expected completion is 30 September, at 6:00pm.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=420278</link>
    </item>
    <item>
      <title street="PACIFIC MOTORWAY" suburb="TUGUN" dateFrom="Thursday, May 23, 2013" timeFrom="10:29:00 AM" dateTo="Wednesday, July 31, 2013" timeTo="12:00:00 AM">PACIFIC MOTORWAY TUGUN From Thursday, May 23, 2013 10:29:00 AM to Wednesday, July 31, 2013 12:00:00 AM</title>
      <description><![CDATA[Pacific Motorway, Tugun - Commencing: 23 May, at 10:29am planned roadworks are taking place Southbound - 1km south of the Stewart Road on ramp.
Lane or lanes reduced. No delays expected. Observe signage. Expected completion is 31 July, at 12:00am.

Hard shoulder closed due to landslip repairs taking place.   Speed limit in place.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=419496</link>
    </item>
    <item>
      <title street="BUNDABERG GIN GIN ROAD" suburb="MCILWRAITH" dateFrom="Thursday, May 23, 2013" timeFrom="10:19:00 AM" dateTo="" timeTo="">BUNDABERG GIN GIN ROAD MCILWRAITH From Thursday, May 23, 2013 10:19:00 AM </title>
      <description><![CDATA[Bundaberg Gin Gin Road, Mcilwraith - Commencing: 23 May 2013 planned roadworks are taking place Both Directions - At the McIlwraith Road intersection.
Partial lane closures. Medium delays expected. Changed traffic conditions. Expected completion is 15 July 2013.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=419494</link>
    </item>
    <item>
      <title street="WARREGO HIGHWAY" suburb="BLACKSOIL" dateFrom="Thursday, May 23, 2013" timeFrom="05:00:00 AM" dateTo="Tuesday, December 31, 2013" timeTo="12:00:00 AM">WARREGO HIGHWAY BLACKSOIL From Thursday, May 23, 2013 05:00:00 AM to Tuesday, December 31, 2013 12:00:00 AM</title>
      <description><![CDATA[Warrego Highway, Blacksoil - Commencing: 23 May, at 5:00am planned roadworks are taking place Both Directions - Intermittent lane closures and speed limit reduced during off-peak hours.
Partial lane closures. No delays expected. Changed traffic conditions. Expected completion is 31 December, at 12:00am.

Construction works are underway at the Warrego Highway/Brisbane Valley Highway intersection at Blacksoil. Motorists will experience lane closures and a reduced speed limit during off-peak hours and intermittently at night. The project is expected to be complete in late 2014. For more information, contact the project team on 0418 495 367]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=419501</link>
    </item>
    <item>
      <title street="PALMERSTON HIGHWAY" suburb="EAST PALMERSTON" dateFrom="Wednesday, May 22, 2013" timeFrom="02:56:00 PM" dateTo="" timeTo="">PALMERSTON HIGHWAY EAST PALMERSTON From Wednesday, May 22, 2013 02:56:00 PM </title>
      <description><![CDATA[Palmerston Highway, East Palmerston - Commencing: 27 May, at 6:00am planned roadworks are taking place - From the rest area to Beatrice River Bridge / McHugh Bridge. There are Wide Load restrictions at this worksite. Available width 3.5 metres. Available height 5.0 metres.
One lane closed. Short delays expected. Changed traffic conditions. Expected completion is end October.

The Department of Transport and Main Roads (TMR) will reconstruct 17 sites across 37.8km of the Palmerston Highway between Shaws Corner and Beatrice River to repair damage incurred in the 2010/2011 wet weather events. 
 
To enable the work to continue safely for motorists and road workers, reduced speed limits will be in place.  The highway will be reduced to one lane at work sites and traffic controllers will assist with the flow of traffic.  Traffic lights will operate during non-working hours. Some delays can be expected.  Motorists are urged to obey changed traffic conditions and allow additional travel time while these important repairs are carried out.


The reconstruction work is being delivered under Natural Disaster Relief and Recovery Arrangements (NDRRA), a joint federal and state initiative.  Under NDRRA funding, the Federal Government contributes 75 per cent of the funding with 25 per cent from the Queensland Government.

For more information, please contact 1800 184 317* or email reconstruct_cairns@tmr.qld.gov.au ]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=418896</link>
    </item>
    <item>
      <title street="MULLIGAN HIGHWAY" suburb="COOKTOWN" dateFrom="Wednesday, May 22, 2013" timeFrom="02:14:00 PM" dateTo="" timeTo="">MULLIGAN HIGHWAY COOKTOWN From Wednesday, May 22, 2013 02:14:00 PM </title>
      <description><![CDATA[Mulligan Highway, Cooktown - Commencing: 17 June, at 6:30am planned roadworks are taking place - Annan River Bridge.
One lane closed. Short delays expected. Proceed with caution. Expected completion is end June.

Bridge maintenance and deck sealing]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=418891</link>
    </item>
    <item>
      <title street="CUNNINGHAM HIGHWAY" suburb="MUTDAPILLY" dateFrom="Wednesday, May 22, 2013" timeFrom="07:00:00 AM" dateTo="Friday, August 30, 2013" timeTo="12:00:00 AM">CUNNINGHAM HIGHWAY MUTDAPILLY From Wednesday, May 22, 2013 07:00:00 AM to Friday, August 30, 2013 12:00:00 AM</title>
      <description><![CDATA[Cunningham Highway, Mutdapilly - Commencing: 22 May, at 7:00am planned roadworks are taking place Both Directions - Various locations between Mutdapilly and south of Warrill View.
Partial lane closures. Short delays expected. Changed traffic conditions. Expected completion is 30 August, at 12:00am.

Shoulder and embankment repairs at various locations, ahead of asphalt laying. Stop/go traffic control in place.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=423664</link>
    </item>
    <item>
      <title street="HERBERT STREET" suburb="INGHAM" dateFrom="Tuesday, May 21, 2013" timeFrom="06:00:00 AM" dateTo="Sunday, June 30, 2013" timeTo="06:00:00 PM">HERBERT STREET INGHAM From Tuesday, May 21, 2013 06:00:00 AM to Sunday, June 30, 2013 06:00:00 PM</title>
      <description><![CDATA[Herbert Street, Ingham - Commencing: 21 May, at 6:00am planned roadworks are taking place Both Directions - Between Davidson Road to White Street.
Partial lane closures. No delays expected. Observe signage. Expected completion is 30 June, at 6:00pm.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=430362</link>
    </item>
    <item>
      <title street="DENHAM STREET" suburb="TOWNSVILLE CITY" dateFrom="Tuesday, May 21, 2013" timeFrom="06:00:00 AM" dateTo="Tuesday, November 12, 2013" timeTo="05:00:00 PM">DENHAM STREET TOWNSVILLE CITY From Tuesday, May 21, 2013 06:00:00 AM to Tuesday, November 12, 2013 05:00:00 PM</title>
      <description><![CDATA[Denham Street, Townsville City - Commencing: 21 May, at 6:00am planned roadworks are taking place Both Directions - Temporary installation of signage for when road closures occur on Walker Street.
No blockage. No delays expected. Observe signage. Expected completion is 12 November, at 5:00pm.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=409353</link>
    </item>
    <item>
      <title street="KENNEDY HIGHWAY" suburb="RAVENSHOE" dateFrom="Monday, May 20, 2013" timeFrom="02:07:00 PM" dateTo="" timeTo="">KENNEDY HIGHWAY RAVENSHOE From Monday, May 20, 2013 02:07:00 PM </title>
      <description><![CDATA[Kennedy Highway, Ravenshoe - Commencing: 20 May, at 2:07pm planned roadworks are taking place Both Directions - Between Evelyn and Ravenshoe.
Lane or lanes reduced. Short delays expected. Observe signage. Expected completion is end January 2014.

Pavement rehabilitation and reconstruction works to a number of sections of the Kennedy Hwy ]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=415716</link>
    </item>
    <item>
      <title street="CARTWRIGHT STREET" suburb="INGHAM" dateFrom="Monday, May 20, 2013" timeFrom="07:45:00 AM" dateTo="Thursday, June 20, 2013" timeTo="04:00:00 PM">CARTWRIGHT STREET INGHAM From Monday, May 20, 2013 07:45:00 AM to Thursday, June 20, 2013 04:00:00 PM</title>
      <description><![CDATA[Cartwright Street, Ingham - Commencing: 20 May, at 7:45am planned roadworks are taking place All directions - Between Herbert Street and Menzies Street.
No blockage. No delays expected. Proceed with caution. Expected completion is 20 June, at 4:00pm.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=418370</link>
    </item>
    <item>
      <title street="SOUTH MISSION BEACH ROAD" suburb="SOUTH MISSION BEACH" dateFrom="Monday, May 20, 2013" timeFrom="06:30:00 AM" dateTo="" timeTo="">SOUTH MISSION BEACH ROAD SOUTH MISSION BEACH From Monday, May 20, 2013 06:30:00 AM </title>
      <description><![CDATA[South Mission Beach Road, South Mission Beach - Commencing: 20 May, at 6:30am planned roadworks are taking place Both Directions - Culvert works will be taking place between the intersection of Tully-Mission Beach Road to the intersection of Kennedy Esplanade.
One lane closed. Short delays expected. Traffic control on scene. Expected completion is 29 June, at 5:30pm.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=415664</link>
    </item>
    <item>
      <title street="MALCOMSON STREET" suburb="NORTH MACKAY" dateFrom="Monday, May 20, 2013" timeFrom="06:00:00 AM" dateTo="" timeTo="">MALCOMSON STREET NORTH MACKAY From Monday, May 20, 2013 06:00:00 AM </title>
      <description><![CDATA[Malcomson Street, North Mackay - Commencing: 20 May, at 6:00am planned roadworks are taking place Eastbound.
Both lanes affected. Short delays expected. Observe signage. Expected completion is Mid July.

The Department of Transport and Main Roads wishes to advise that reconstruction works will be occurring on Malcomson Street, Monday 20 May 2013 – Mid July 2013, weather permitting. 

During this time, temporary traffic arrangements will be in place for the safety of motorists and road workers.

Traffic will be reduced to single lane (eastbound only) between Glenpark Street and the Evans Avenue/Hodder Street intersection.

Two-way traffic will be maintained between Palmer Street and the Evans Avenue/Hodder Street intersection.

Access to businesses in North Mackay will be maintained throughout the works. Joint Levee Road can be used as an alternative route while the works are taking place.

The department thanks road users and residents for their patience whilst these essential works are delivered. If you require further information please contact our Mackay office on 4951 8555.
]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=410187</link>
    </item>
    <item>
      <title street="JAMES STREET" suburb="TOOWOOMBA CITY" dateFrom="Sunday, May 19, 2013" timeFrom="06:00:00 AM" dateTo="" timeTo="">JAMES STREET TOOWOOMBA CITY From Sunday, May 19, 2013 06:00:00 AM </title>
      <description><![CDATA[James Street, Toowoomba City - Commencing: 26 May 2013, between the hours of 6:00pm and 6:00am planned roadworks are taking place Both Directions - Warrego Highway at various sites from the intersection of Cohoe Street and Tourist Drive through to Bridge and Boundary Streets Toowoomba.
One lane blocked. Medium delays expected. Changed traffic conditions. Expected completion is 30 June 2013, weather permitting.

On Site during working hours (6pm-6am NIGHT WORKS): Reduced Speed Limit 40km/h, Traffic control on site with possible delays of up to 15 minutes, at some sections detours may be in place please obey signage.

On Site During NON working hours and Overnight (6am-6pm): Returned to normal traffic conditions.

Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au ]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=421902</link>
    </item>
    <item>
      <title street="KENNEDY HIGHWAY" suburb="MAREEBA" dateFrom="Friday, May 17, 2013" timeFrom="06:30:00 AM" dateTo="" timeTo="">KENNEDY HIGHWAY MAREEBA From Friday, May 17, 2013 06:30:00 AM </title>
      <description><![CDATA[Kennedy Highway, Mareeba - Commencing: 22 January, at 6:30am planned roadworks are taking place Both Directions - Bridge servicing to take place in various locations along the Kennedy Highway.
Partial lane closures. Short delays expected. Changed traffic conditions. Expected completion is 31 August, at 5:30pm.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=416739</link>
    </item>
    <item>
      <title street="CARNARVON HIGHWAY" suburb="ROMA" dateFrom="Friday, May 17, 2013" timeFrom="06:00:00 AM" dateTo="" timeTo="">CARNARVON HIGHWAY ROMA From Friday, May 17, 2013 06:00:00 AM </title>
      <description><![CDATA[Carnarvon Highway, Roma - Commencing: 14 May 2013, between the hours of 6:00am and 6:00pm planned roadworks are taking place Both Directions - Approximately 2 kilometres north of Roma.
Single lane in operation. Short delays expected. Expected completion is 11 October 2013, weather permitting.

On Site during working hours (6am-6pm): Reduced Speed 60km/h, Portable Traffic Signals on Scene with short delays of up to 5 minutes can be expected.

On Site During NON working hours and Overnight(6pm-6am):  Returned to normal traffic conditions. 

Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au ]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=416743</link>
    </item>
    <item>
      <title street="CARNARVON HIGHWAY" suburb="EUMAMURRIN" dateFrom="Friday, May 17, 2013" timeFrom="06:00:00 AM" dateTo="" timeTo="">CARNARVON HIGHWAY EUMAMURRIN From Friday, May 17, 2013 06:00:00 AM </title>
      <description><![CDATA[Carnarvon Highway, Eumamurrin - Commencing: 14 May 2013, between the hours of 6:00am and 6:00pm planned roadworks are taking place Both Directions - Approximately 49 kilometres north of Roma.
Single lane in operation. Short delays expected. Changed traffic conditions. Expected completion is 11 October 2013, weather permitting.

On Site during working hours (6am-6pm): Reduced Speed 60km/h, Portable Traffic Signals on Scene with short delays of up to 5 minutes can be expected.

On Site During NON working hours and Overnight(6pm-6am): Returned to normal traffic conditions.

Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au ]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=416745</link>
    </item>
    <item>
      <title street="CARNARVON HIGHWAY" suburb="EUTHULLA" dateFrom="Friday, May 17, 2013" timeFrom="06:00:00 AM" dateTo="" timeTo="">CARNARVON HIGHWAY EUTHULLA From Friday, May 17, 2013 06:00:00 AM </title>
      <description><![CDATA[Carnarvon Highway, Euthulla - Commencing: 17 May 2013, between the hours of  6:00am and 6:00pm planned roadworks are taking place Both Directions - Approximately 4 kilometres north of Roma.
Single lane in operation. Short delays expected. Changed traffic conditions. Expected completion is 28 March 2014, weather permitting.

On Site during working hours (6am-6pm): Reduced Speed 60km/h, Portable Traffic Signals on Scene with short delays of up to 5 minutes can be expected.

On Site During NON working hours and Overnight(6pm-6am): Returned to normal traffic conditions.

Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au ]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=416746</link>
    </item>
    <item>
      <title street="PACIFIC MOTORWAY ON RAMP" suburb="YATALA" dateFrom="Wednesday, May 15, 2013" timeFrom="05:03:00 PM" dateTo="Sunday, June 30, 2013" timeTo="12:00:00 AM">PACIFIC MOTORWAY ON RAMP YATALA From Wednesday, May 15, 2013 05:03:00 PM to Sunday, June 30, 2013 12:00:00 AM</title>
      <description><![CDATA[Pacific Motorway On Ramp, Yatala - Commencing: 15 May, at 5:03pm planned roadworks are taking place All directions - Pavement repairs at Yatala South Interchange (Exit 41) and Yatala North Interchange (Exit 38) until the end of June 2013 .
Partial lane closures. Short delays expected. Changed traffic conditions. Expected completion is 30 June, at 12:00am.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=416229</link>
    </item>
    <item>
      <title street="DAVIDSON ROAD" suburb="EURAMO" dateFrom="Wednesday, May 15, 2013" timeFrom="12:08:00 PM" dateTo="" timeTo="">DAVIDSON ROAD EURAMO From Wednesday, May 15, 2013 12:08:00 PM </title>
      <description><![CDATA[Davidson Road, Euramo - Commencing: 20 May, at 06:30am planned roadworks are taking place Both Directions - Euramo to Munro Plains - Bridge and culvert servicing works are scheduled between the intersection of Bruce Hwy and the Davidson Creek Bridge.
Lane or lanes reduced. Short delays expected. Proceed with caution. Expected completion is 29 June, at 05:30pm.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=415677</link>
    </item>
    <item>
      <title street="TULLY HULL ROAD" suburb="SILKY OAK" dateFrom="Wednesday, May 15, 2013" timeFrom="11:06:00 AM" dateTo="" timeTo="">TULLY HULL ROAD SILKY OAK From Wednesday, May 15, 2013 11:06:00 AM </title>
      <description><![CDATA[Tully Hull Road, Silky Oak - Commencing: 20 May, at 06:30am planned roadworks are taking place Both Directions - Silky Oak to Hully Heads - Bridge and culvert servicing works are scheduled between the intersection of Bruce Hwy and the intersection of Tully Heads Road.
One lane closed. Short delays expected. Proceed with caution. Expected completion is 29 June, at 05:30pm.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=415672</link>
    </item>
    <item>
      <title street="TULLY MISSION BEACH ROAD" suburb="BIRKALLA" dateFrom="Wednesday, May 15, 2013" timeFrom="09:00:00 AM" dateTo="" timeTo="">TULLY MISSION BEACH ROAD BIRKALLA From Wednesday, May 15, 2013 09:00:00 AM </title>
      <description><![CDATA[Tully Mission Beach Road, Birkalla - Commencing: 20 May, at 6:30am planned roadworks are taking place All directions - Birkalla to Mission Beach - Bridge and culvert servicing works are scheduled between the intersection of Bruce Hwy and the intersection of El-Arish Mission Beach Road.
One lane closed. Short delays expected. Proceed with caution. Expected completion is 29 June, at 5:30pm.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=415665</link>
    </item>
    <item>
      <title street="HERVEY RANGE ROAD" suburb="HERVEY RANGE" dateFrom="Wednesday, May 15, 2013" timeFrom="08:00:00 AM" dateTo="Tuesday, October 15, 2013" timeTo="04:00:00 PM">HERVEY RANGE ROAD HERVEY RANGE From Wednesday, May 15, 2013 08:00:00 AM to Tuesday, October 15, 2013 04:00:00 PM</title>
      <description><![CDATA[Hervey Range Road, Hervey Range - Commencing: 15 May, at 8:00am planned roadworks are taking place Both Directions - Installation of temporary access west of Alice River Crossing.
Partial lane closures. No delays expected. Observe signage. Expected completion is 15 October, at 4:00pm.

Speed restrictions and traffic control on site for the duration of the works.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=392705</link>
    </item>
    <item>
      <title street="WARREGO HIGHWAY" suburb="BUNGIL" dateFrom="Wednesday, May 15, 2013" timeFrom="06:00:00 AM" dateTo="" timeTo="">WARREGO HIGHWAY BUNGIL From Wednesday, May 15, 2013 06:00:00 AM </title>
      <description><![CDATA[Warrego Highway, Bungil - Commencing: 25 February 2013, between the hours of 6:00am and 6:00pm planned roadworks are taking place Eastbound - Cattle Creek Crossing approximately 7 kilometers west of Roma.
Single lane in operation. Medium delays expected. Changed traffic conditions. Expected completion is 30 June 2013, weather permitting.

On Site during working hours (6am-6pm): Reduced Speed 40km/h, Portable Traffic Signals on Scene, Medium delays of up to 10 minutes can be expected.

On Site During NON working hours and Overnight(6pm-6am):Reduced Speed 60km/h, Portable Traffic Signals on Scene, Medium delays of up to 10 minutes can be expected.

Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au
]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=415675</link>
    </item>
    <item>
      <title street="WARREGO HIGHWAY" suburb="HODGSON" dateFrom="Wednesday, May 15, 2013" timeFrom="06:00:00 AM" dateTo="" timeTo="">WARREGO HIGHWAY HODGSON From Wednesday, May 15, 2013 06:00:00 AM </title>
      <description><![CDATA[Warrego Highway, Hodgson - Commencing: 15 April 2013, between the hours of 6:00am and 6:00pm planned roadworks are taking place Both Directions - Approximately 11 kilometers west of Roma.
Single lane in operation. Medium delays expected. Changed traffic conditions. Expected completion is 30 April 2014, weather permitting.

On Site during working hours (6am-6pm): Reduced Speed 40km/h, Portable Traffic Signals on Scene, Medium delays of up to 10 minutes can be expected.

On Site During NON working hours and Overnight(6pm-6am):Reduced Speed 60km/h, Portable Traffic Signals on Scene, Medium delays of up to 10 minutes can be expected.

Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au ]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=415681</link>
    </item>
    <item>
      <title street="PACIFIC MOTORWAY" suburb="SPRINGWOOD" dateFrom="Tuesday, May 14, 2013" timeFrom="06:24:00 PM" dateTo="Sunday, December 01, 2013" timeTo="05:00:00 PM">PACIFIC MOTORWAY SPRINGWOOD From Tuesday, May 14, 2013 06:24:00 PM to Sunday, December 01, 2013 05:00:00 PM</title>
      <description><![CDATA[Pacific Motorway, Springwood - Commencing: 14 May, at 6:24pm planned roadworks are taking place Both Directions.
No blockage. No delays expected. Changed traffic conditions. Expected completion is 01 December, at 5:00pm.

Construction works are currently underway on the Pacific Motorway at Springwood. Traffic has been reduced to 80km through the site. Night works will be undertaken intermittently throughout the duration of the project. Traffic impacts will involve reduced lanes and speed during night works. The expected completion time for the project is late 2013. For more information contact the project team on 0418495367.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=415639</link>
    </item>
    <item>
      <title street="WARREGO HIGHWAY" suburb="MORVEN" dateFrom="Tuesday, May 14, 2013" timeFrom="03:00:00 PM" dateTo="" timeTo="">WARREGO HIGHWAY MORVEN From Tuesday, May 14, 2013 03:00:00 PM </title>
      <description><![CDATA[Warrego Highway, Morven - Commencing: March 2013 , between the hours of 6:00am and 6:00pm planned roadworks are taking place Both Directions - Multiple sites over a 86.88km stretch between Morven and Charleville..
Single lane in operation. Short delays expected. Changed traffic conditions. Expected completion is December 2013, weather permitting.

On Site during working hours (6am-6pm): Reduced Speed Limit 40km/h, Portable Traffic Signals on site with possible delays of up to 15 minutes at EACH SITE. Please allow extra travel time.

On Site During NON working hours and Overnight (6pm-6am): Reduced Speed Limit 40km/h. Portable Traffic Signals on site with possible delays of up to 15 minutes at EACH SITE. Please allow extra travel time.

Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au ]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=415629</link>
    </item>
    <item>
      <title street="PARADISE ROAD" suburb="SLACKS CREEK" dateFrom="Tuesday, May 14, 2013" timeFrom="01:01:00 PM" dateTo="Monday, September 30, 2013" timeTo="05:00:00 PM">PARADISE ROAD SLACKS CREEK From Tuesday, May 14, 2013 01:01:00 PM to Monday, September 30, 2013 05:00:00 PM</title>
      <description><![CDATA[Paradise Road, Slacks Creek - Commencing: 14 May, at 1:01pm planned roadworks are taking place All directions - Road works at the Paradise Road roundabout are continuing. Motorists should expect a reduction in speed to 40km/h and single lane closures between 9am and 3pm. .
Partial lane closures. Short delays expected. Changed traffic conditions. Expected completion is 30 September, at 5:00pm.

For more information call the construction team on 0418 495 367 (business hours only).]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=415623</link>
    </item>
    <item>
      <title street="WOOLCOCK STREET" suburb="COSGROVE" dateFrom="Tuesday, May 14, 2013" timeFrom="06:30:00 AM" dateTo="Monday, September 30, 2013" timeTo="05:00:00 PM">WOOLCOCK STREET COSGROVE From Tuesday, May 14, 2013 06:30:00 AM to Monday, September 30, 2013 05:00:00 PM</title>
      <description><![CDATA[Woolcock Street, Cosgrove - Commencing: 14 May, at 6:30am planned roadworks are taking place Both Directions - Signage due to works on Abattoir Road.
No blockage. No delays expected. Observe signage. Expected completion is 30 September, at 5:00pm.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=413817</link>
    </item>
    <item>
      <title street="PACIFIC MOTORWAY" suburb="SPRINGWOOD" dateFrom="Monday, May 13, 2013" timeFrom="03:52:00 PM" dateTo="" timeTo="">PACIFIC MOTORWAY SPRINGWOOD From Monday, May 13, 2013 03:52:00 PM </title>
      <description><![CDATA[Pacific Motorway, Springwood - Commencing: Mid-April 2013 planned roadworks are taking place Both Directions - Between Fitzgerald Avenue to Shortland Street.
No blockage. No delays expected. Changed traffic conditions. Expected completion is late 2013.

Construction works are currently underway on the Pacific Motorway at Springwood. Traffic has been reduced to 80km through the site. Night works will be undertaken intermittently throughout the duration of the project. Traffic impacts will involved reduced lanes and speed during night works. The expected completion time for the project is late 2013.

For more information, contact the project team on 0418 495 367.
]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=415046</link>
    </item>
    <item>
      <title street="GOLD COAST HIGHWAY" suburb="MIAMI" dateFrom="Monday, May 13, 2013" timeFrom="06:00:00 AM" dateTo="" timeTo="">GOLD COAST HIGHWAY MIAMI From Monday, May 13, 2013 06:00:00 AM </title>
      <description><![CDATA[Gold Coast Highway, Miami - Commencing: 27 May planned roadworks are taking place Both Directions - Between Paradise Avenue and Schuster Avenue.
Lane or lanes reduced. No delays expected. Changed traffic conditions. Expected completion is 30 June 2013.

Day and night works are underway at the pedestrian facility between Paradise Avenue and Santa Monica Road.
Access to the Gold Coast Highway from Bardon Avenue and Schuster Avenue has been closed.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=413327</link>
    </item>
    <item>
      <title street="BERMUDA STREET" suburb="MERMAID WATERS" dateFrom="Friday, May 10, 2013" timeFrom="05:00:00 PM" dateTo="Sunday, June 30, 2013" timeTo="03:00:00 PM">BERMUDA STREET MERMAID WATERS From Friday, May 10, 2013 05:00:00 PM to Sunday, June 30, 2013 03:00:00 PM</title>
      <description><![CDATA[Bermuda Street, Mermaid Waters - Commencing: 10 May, at 5:00pm planned roadworks are taking place Westbound - Intersection of Bermuda Street with Christine Avenue, Cottesloe Drive and Markeri Road .
One lane closed. Short delays expected. Changed traffic conditions. Expected completion is 30 June, at 3:00pm.

The southbound slip lanes at each intersection onto Bermuda Street will be restricted. Motorists will be required to use the traffic signals to turn left turn on to Bermuda Street. ]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=413337</link>
    </item>
    <item>
      <title street="WILLIAM STREET" suburb="BEAUDESERT" dateFrom="Friday, May 10, 2013" timeFrom="06:30:00 AM" dateTo="Sunday, June 30, 2013" timeTo="06:30:00 PM">WILLIAM STREET BEAUDESERT From Friday, May 10, 2013 06:30:00 AM to Sunday, June 30, 2013 06:30:00 PM</title>
      <description><![CDATA[William Street, Beaudesert - Commencing: 10 May, at 6:30am planned roadworks are taking place Both Directions.
Lane or lanes reduced. No delays expected. Changed traffic conditions. Expected completion is 30 June, at 6:30pm.

Working hours are 6:30am to 6:30pm Monday to Friday and 6:30am to 3pm on Saturdays. Some Sunday work may be required. Some night work will be required.
Parking on William Street has temporarily been removed.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=411891</link>
    </item>
    <item>
      <title street="BURNETT HIGHWAY" suburb="MOONFORD" dateFrom="Thursday, May 09, 2013" timeFrom="12:00:00 AM" dateTo="" timeTo="">BURNETT HIGHWAY MOONFORD From Thursday, May 09, 2013 12:00:00 AM </title>
      <description><![CDATA[Burnett Highway, Moonford - Commencing: Thursday 9 May planned roadworks are taking place Both Directions - Between Monto and just north of Coominglah.
Lane or lanes reduced. Short delays expected. Reduced speed limit (40km/h). Expected completion is October 2013, weather permitting.

Reconstruction works will be undertaken along the Burnett Highway between Monto and just north of Coominglah. Motorists are advised to anticipate delays of between five and 10 minutes. For further information please contact Transport and Main Roads (Wide Bay/Burnett Region) on 1300 728 390 during business hours.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=412788</link>
    </item>
    <item>
      <title street="PARADISE ROAD" suburb="SLACKS CREEK" dateFrom="Wednesday, May 08, 2013" timeFrom="05:30:00 PM" dateTo="Wednesday, July 31, 2013" timeTo="05:00:00 AM">PARADISE ROAD SLACKS CREEK From Wednesday, May 08, 2013 05:30:00 PM to Wednesday, July 31, 2013 05:00:00 AM</title>
      <description><![CDATA[Paradise Road, Slacks Creek - Commencing: 08 May, at 5:30pm planned roadworks are taking place All directions.
Partial lane closures. Short delays expected. Changed traffic conditions. Expected completion is 31 July, at 5:00am.

The three slip lanes at the Paradise Road roundabout will close from 5am Thursday 9 May 2013.  
Motorists are required to use the roundabout as an alternative to the slip lanes. ]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=412810</link>
    </item>
    <item>
      <title street="PACIFIC MOTORWAY" suburb="YATALA" dateFrom="Tuesday, May 07, 2013" timeFrom="08:00:00 PM" dateTo="Monday, September 30, 2013" timeTo="05:00:00 AM">PACIFIC MOTORWAY YATALA From Tuesday, May 07, 2013 08:00:00 PM to Monday, September 30, 2013 05:00:00 AM</title>
      <description><![CDATA[Pacific Motorway, Yatala - Commencing: 07 May, at 8:00pm planned roadworks are taking place Northbound - Nightly from 8pm until 5am until late September 2013. 
M1 (northbound) from Yatala North (Exit 38) to the Logan Motorway Interchange, Beenleigh.
Partial lane closures. Short delays expected. Changed traffic conditions. Expected completion is 30 September, at 5:00am.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=412209</link>
    </item>
    <item>
      <title street="GORDONVALE ATHERTON ROAD" suburb="LAMB RANGE" dateFrom="Monday, May 06, 2013" timeFrom="08:30:00 AM" dateTo="" timeTo="">GORDONVALE ATHERTON ROAD LAMB RANGE From Monday, May 06, 2013 08:30:00 AM </title>
      <description><![CDATA[Gordonvale Atherton Road, Lamb Range - Commencing: 06 May, at 8:30am planned roadworks are taking place Both Directions - There will be drain cleaning and extra routine maintenance between the Wet Tropics Boundary and Boar Bocket Road on the Gillies Range.
One lane closed. Short delays expected. Traffic control on scene. Expected completion is 30 June, at 3:30pm.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=411889</link>
    </item>
    <item>
      <title street="NEW ENGLAND HIGHWAY" suburb="GREENMOUNT" dateFrom="Monday, May 06, 2013" timeFrom="06:00:00 AM" dateTo="" timeTo="">NEW ENGLAND HIGHWAY GREENMOUNT From Monday, May 06, 2013 06:00:00 AM </title>
      <description><![CDATA[New England Highway, Greenmount - Commencing: 06 May 2013, between the hours of 6:00am and 6:00pm planned roadworks are taking place All directions - Between Dixon Lane and Phipps Road.
Single lane in operation. Medium delays expected. Changed traffic conditions. Expected completion is 05 July 2013, weather permitting.

On Site during working hours (6am-6pm): Reduced Speed Limit 40km/h, Portable Traffic Signals on site with possible delays of up to 10 minutes

On Site During NON working hours and Overnight (6pm-6am): Reduced Speed Limit 40km/h, Portable Traffic Signals on site with possible delays of up to 10 minutes

Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au ]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=409674</link>
    </item>
    <item>
      <title street="WARREGO HIGHWAY" suburb="REDWOOD" dateFrom="Monday, May 06, 2013" timeFrom="06:00:00 AM" dateTo="" timeTo="">WARREGO HIGHWAY REDWOOD From Monday, May 06, 2013 06:00:00 AM </title>
      <description><![CDATA[Warrego Highway, Redwood - Commencing: 15 April 2013, 24 hours, 6 days per week planned roadworks are taking place Both Directions - On The Toowoomba Range.
Single lane in operation. Medium delays expected. Changed traffic conditions. Expected completion is 15 May 2014, weather permitting.

On Site during working hours, 24 hours 6 days per week:
West Bound - All Lanes in Operation with Reduced Speed Limit 40km/h, possible delays of up to 15 minutes. 
East bound - Single Lane in Operation with Reduced Speed limit 40km/h, possible delays of up to 30 minutes

On Site During NON working hours: (06.00PM to 06.00AM)
West Bound - Possible single Lane in Operation with Reduced Speed Limit 40km/h, possible delays of up to 30 minutes.
East bound - Single Lane in Operation with Reduced Speed limit 40km/h, possible delays of up to 30 minutes

Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au 

1st SAFETY RAMP IS CLOSED 

Motorists are advised to show patience and to please give trucks more space.
 ]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=411890</link>
    </item>
    <item>
      <title street="FERRY ROAD" suburb="SOUTHPORT" dateFrom="Sunday, May 05, 2013" timeFrom="07:00:00 PM" dateTo="Friday, July 05, 2013" timeTo="12:30:00 AM">FERRY ROAD SOUTHPORT From Sunday, May 05, 2013 07:00:00 PM to Friday, July 05, 2013 12:30:00 AM</title>
      <description><![CDATA[Ferry Road, Southport - Commencing: 05 May, at 7:00pm planned roadworks are taking place Northbound - Between Benowa Road and Deauville Drive for the next 6-8 weeks.
Partial lane closures. Short delays expected. Allow extra travel time. Expected completion is 05 July, at 12:30am.

Changed traffic conditions will be in place 24/7]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=410231</link>
    </item>
    <item>
      <title street="WARBURTON STREET" suburb="NORTH WARD" dateFrom="Sunday, May 05, 2013" timeFrom="09:00:00 AM" dateTo="Friday, July 05, 2013" timeTo="03:00:00 PM">WARBURTON STREET NORTH WARD From Sunday, May 05, 2013 09:00:00 AM to Friday, July 05, 2013 03:00:00 PM</title>
      <description><![CDATA[Warburton Street, North Ward - Commencing: 05 May, at 9:00am planned roadworks are taking place Westbound - Trenching, boring, cable hauling and pit construction works near Redpath Street intersection.
Partial lane closures. Unknown traffic impact. Proceed with caution. Expected completion is 05 July, at 3:00pm.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=410565</link>
    </item>
    <item>
      <title street="BUNDOCK STREET" suburb="WEST END" dateFrom="Sunday, May 05, 2013" timeFrom="06:30:00 AM" dateTo="Friday, July 05, 2013" timeTo="06:00:00 PM">BUNDOCK STREET WEST END From Sunday, May 05, 2013 06:30:00 AM to Friday, July 05, 2013 06:00:00 PM</title>
      <description><![CDATA[Bundock Street, West End - Commencing: 05 May, at 6:30am planned roadworks are taking place Eastbound - Boring, pit construction and cable hauling works at Stagpole Street intersection.
Partial lane closures. No delays expected. Proceed with caution. Expected completion is 05 July, at 6:00pm.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=410569</link>
    </item>
    <item>
      <title street="BUNDOCK STREET" suburb="BELGIAN GARDENS" dateFrom="Sunday, May 05, 2013" timeFrom="06:30:00 AM" dateTo="Friday, July 05, 2013" timeTo="06:00:00 PM">BUNDOCK STREET BELGIAN GARDENS From Sunday, May 05, 2013 06:30:00 AM to Friday, July 05, 2013 06:00:00 PM</title>
      <description><![CDATA[Bundock Street, Belgian Gardens - Commencing: 05 May, at 6:30am planned roadworks are taking place Eastbound - Boring, pit construction and cable hauling works at Taylor Street intersection.
Partial lane closures. No delays expected. Proceed with caution. Expected completion is 05 July, at 6:00pm.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=410570</link>
    </item>
    <item>
      <title street="BUNDOCK STREET" suburb="BELGIAN GARDENS" dateFrom="Sunday, May 05, 2013" timeFrom="06:30:00 AM" dateTo="Friday, July 05, 2013" timeTo="06:30:00 PM">BUNDOCK STREET BELGIAN GARDENS From Sunday, May 05, 2013 06:30:00 AM to Friday, July 05, 2013 06:30:00 PM</title>
      <description><![CDATA[Bundock Street, Belgian Gardens - Commencing: 05 May, at 6:30am planned roadworks are taking place Eastbound - Cable hauling and jointing works near Little Street intersection.
Partial lane closures. Unknown traffic impact. Proceed with caution. Expected completion is 05 July, at 6:30pm.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=410567</link>
    </item>
    <item>
      <title street="MOUNT GLORIOUS ROAD" suburb="MOUNT GLORIOUS" dateFrom="Friday, May 03, 2013" timeFrom="06:58:00 PM" dateTo="" timeTo="">MOUNT GLORIOUS ROAD MOUNT GLORIOUS From Friday, May 03, 2013 06:58:00 PM </title>
      <description><![CDATA[Mount Glorious Road, Mount Glorious - Commencing: 03 May, at 6:58pm planned roadworks are taking place Both Directions.
One lane closed. Short delays expected. Changed traffic conditions. Expected completion is to be advised.

Samford-Mount Glorious Road (PEI Road) 
Temporary traffic signals remain at one location on Samford-Mount Glorious Road while road repairs are completed. Minimal delays are expected. Motorists are reminded to give way as required. ]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=410690</link>
    </item>
    <item>
      <title street="WARREGO HIGHWAY" suburb="GOOMBI" dateFrom="Friday, May 03, 2013" timeFrom="06:00:00 AM" dateTo="" timeTo="">WARREGO HIGHWAY GOOMBI From Friday, May 03, 2013 06:00:00 AM </title>
      <description><![CDATA[Warrego Highway, Goombi - Commencing: 01 May 2013, between the hours of 6:00am and 6:00pm planned roadworks are taking place Both Directions - Between Fairymeadow Road and Davies Road.
Single lane in operation. Short delays expected. Changed traffic conditions. Expected completion is 08 July 2013, weather permitting.

On Site during working hours (6am-6pm): Reduced Speed Limit 40km/h, Portable Traffic Signals on site with possible delays of up to 5 minutes

On Site During NON working hours and Overnight (6pm-6am): Reduced Speed Limit 80km/h. Both lanes in operation.

Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au
]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=410220</link>
    </item>
    <item>
      <title street="WARREGO HIGHWAY" suburb="MUCKADILLA" dateFrom="Friday, May 03, 2013" timeFrom="06:00:00 AM" dateTo="" timeTo="">WARREGO HIGHWAY MUCKADILLA From Friday, May 03, 2013 06:00:00 AM </title>
      <description><![CDATA[Warrego Highway, Muckadilla - Commencing: 22 August 2012, between the hours of at 6:00am and 6:00pm planned roadworks are taking place Both Directions - Approximately 31.5km west of Roma.
Single lane in operation. Medium delays expected. Changed traffic conditions. Expected completion is 31 July 2013, weather permitting.

On Site during working hours (6am-6pm): Reduced Speed Limit 40km/h, Portable Traffic Signals on site with possible delays of up to 15 minutes.

On Site During NON working hours and Overnight (6pm-6am): Reduced Speed Limit 60km/h. Portable Traffic Signals on site with possible delays of up to 15 minutes.

Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au ]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=410230</link>
    </item>
    <item>
      <title street="BRUCE HIGHWAY" suburb="OWANYILLA" dateFrom="Wednesday, May 01, 2013" timeFrom="02:15:00 PM" dateTo="" timeTo="">BRUCE HIGHWAY OWANYILLA From Wednesday, May 01, 2013 02:15:00 PM </title>
      <description><![CDATA[Bruce Highway, Owanyilla - Commencing: now planned roadworks are taking place Both Directions - Various sites between Gympie and Maryborough.
Lane or lanes reduced. Short delays expected. Allow extra travel time. Expected completion is mid-2013, weather permitting.

Reconstruction works are underway at various sites along the highway between Gympie and Maryborough. Please observe all safety signage and obey all traffic controllers' instructions.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=409680</link>
    </item>
    <item>
      <title street="CARNARVON HIGHWAY" suburb="ROMA" dateFrom="Wednesday, May 01, 2013" timeFrom="06:00:00 AM" dateTo="" timeTo="">CARNARVON HIGHWAY ROMA From Wednesday, May 01, 2013 06:00:00 AM </title>
      <description><![CDATA[Carnarvon Highway, Roma - Commencing: 26 April 2013, between the hours of 6:00am and 6:00pm planned roadworks are taking place Both Directions - Between Bassett Lane and Airport Drive Roma.
Single lane in operation. Short delays expected. Changed traffic conditions. Expected completion is 08 July 2013, weather permitting.

On Site during working hours (6am-6pm): Reduced Speed 60km/h, Traffic Control on Scene, Short delays of up to 5 minutes can be expected.

On Site During NON working hours and Overnight (6pm-6am): regular 2 way traffic

Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au

Sidetrack in place 13/05/2013 weather permitting]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=409682</link>
    </item>
    <item>
      <title street="CUNNINGHAM HIGHWAY" suburb="GORE" dateFrom="Wednesday, May 01, 2013" timeFrom="06:00:00 AM" dateTo="" timeTo="">CUNNINGHAM HIGHWAY GORE From Wednesday, May 01, 2013 06:00:00 AM </title>
      <description><![CDATA[Cunningham Highway, Gore - Commencing: 16 April 2013, between the hours of  6:00am - 6:00pm planned roadworks are taking place All directions - Between Bennetts Gully and Greysholm Road.
Single lane in operation. Short delays expected. Changed traffic conditions. Expected completion is 30 August 2013, weather permitting.

On Site during working hours (6am-6pm): Portable traffic signals in use and reduced speed limit (40km/h)

On Site During NON working hours and Overnight (6pm-6am): Speed Limited (80km/h)

Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au
]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=409671</link>
    </item>
    <item>
      <title street="FREESTONE ROAD" suburb="WARWICK" dateFrom="Tuesday, April 30, 2013" timeFrom="06:00:00 AM" dateTo="" timeTo="">FREESTONE ROAD WARWICK From Tuesday, April 30, 2013 06:00:00 AM </title>
      <description><![CDATA[Freestone Road, Warwick - Commencing: 30 April 2013, between the hours of 6:00am to 6:00pm planned roadworks are taking place Both Directions - Between Depot Road and Ryans Road.
Single lane in operation. Short delays expected. Changed traffic conditions. Expected completion is 28 of August 2013, weather permitting.

On Site during working hours (6am-6pm): Reduced Speed Limit 40km/h, Traffic Control on site with possible delays of up to 5 minutes.

On Site During NON working hours and Overnight (6pm-6am): Reduced Speed Limit 40km/h, Portable Traffic Signals on site with possible delays of up to 5 minutes.

Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au ]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=409066</link>
    </item>
    <item>
      <title street="ROBERT STREET" suburb="ATHERTON" dateFrom="Monday, April 29, 2013" timeFrom="06:00:00 AM" dateTo="" timeTo="">ROBERT STREET ATHERTON From Monday, April 29, 2013 06:00:00 AM </title>
      <description><![CDATA[Robert Street, Atherton - Commencing: 29 April, at 6:00am planned roadworks are taking place Both Directions - Asphalting Wednesday 19th June. Please allow extra travel time.
Partial lane closures. Short delays expected. Observe signage. Expected completion is end June 2013.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=403038</link>
    </item>
    <item>
      <title street="GORDONVALE ATHERTON ROAD" suburb="GORDONVALE" dateFrom="Wednesday, April 24, 2013" timeFrom="05:00:00 PM" dateTo="" timeTo="">GORDONVALE ATHERTON ROAD GORDONVALE From Wednesday, April 24, 2013 05:00:00 PM </title>
      <description><![CDATA[Gordonvale Atherton Road, Gordonvale - Commencing: 24 April, at 4:00pm planned roadworks are taking place Both Directions - On Wednesday 22 May, the Gillies will be under temporary traffic signals at Ross and Locke.
One lane closed. Short delays expected. Expected completion is 21 June, at 6:00pm.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=406341</link>
    </item>
    <item>
      <title street="BRUCE HIGHWAY" suburb="FEDERAL" dateFrom="Wednesday, April 24, 2013" timeFrom="03:48:00 PM" dateTo="Tuesday, December 31, 2013" timeTo="12:00:00 AM">BRUCE HIGHWAY FEDERAL From Wednesday, April 24, 2013 03:48:00 PM to Tuesday, December 31, 2013 12:00:00 AM</title>
      <description><![CDATA[Bruce Highway, Federal - Commencing: 24 April, at 3:48pm planned roadworks are taking place Southbound - Right Turn Lane closure - Bruce Highway southbound at right turn into Gardners Road at Federal. .
Partial lane closures. Unknown traffic impact. Changed traffic conditions. Expected completion is 31 December, at 12:00am.

From Tuesday 23 April 2013, weather permitting, works will be undertaken to close the right-turn in to Gardners Road from the Bruce Highway. 
Motorists will still be able to turn left into Gardners Road from the highway, and right out of Gardners Road onto the highway. Only the right-turn movements into Gardners Road from the highway will be banned. 
This temporary restriction is for the intersection improvement works on the Bruce Highway at Gardners and Pomona Connection roads. This change to the way Gardners Road is accessed by motorists travelling southbound on the highway will remain in place until the eastern end of Gardners Road is realigned and a new intersection is constructed in late 2013.
Temporarily prohibiting right-turn movements into Gardners Road from the highway is necessary to maintain safe access to Gardners Road and minimise disruptions to motorists travelling on the highway. 
Road signage will be in place along the highway to advise motorists of the changed conditions. 
For up-to-date information on traffic disruptions please visit www.131914.qld.gov.au or call 13 19 40.
If you have any questions about the project, please contact Mrs Toni Ryan, Senior Communications Officer on 5451 7055. Mrs Ryan will be pleased to assist.



]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=406355</link>
    </item>
    <item>
      <title street="MALANDA ATHERTON ROAD" suburb="MALANDA" dateFrom="Monday, April 22, 2013" timeFrom="06:00:00 AM" dateTo="" timeTo="">MALANDA ATHERTON ROAD MALANDA From Monday, April 22, 2013 06:00:00 AM </title>
      <description><![CDATA[Malanda Atherton Road, Malanda - Commencing: 22 April, at 6:00am planned roadworks are taking place Both Directions - Adjacent to Malanda-Atherton Rd & Upper Barron Rd. Installation of water supply scheme.
No blockage. Short delays expected. Observe signage. Expected completion is mid August.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=403027</link>
    </item>
    <item>
      <title street="SOUTH MISSION BEACH ROAD" suburb="SOUTH MISSION BEACH" dateFrom="Monday, April 22, 2013" timeFrom="06:00:00 AM" dateTo="" timeTo="">SOUTH MISSION BEACH ROAD SOUTH MISSION BEACH From Monday, April 22, 2013 06:00:00 AM </title>
      <description><![CDATA[South Mission Beach Road, South Mission Beach - Commencing: 22 April, at 6:00am planned roadworks are taking place Both Directions - South Mission Beach turn off. Street lighting upgrade.
Partial lane closures. Short delays expected. Observe signage. Expected completion is end June.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=403028</link>
    </item>
    <item>
      <title street="KENNEDY HIGHWAY" suburb="WALKAMIN" dateFrom="Monday, April 22, 2013" timeFrom="06:00:00 AM" dateTo="" timeTo="">KENNEDY HIGHWAY WALKAMIN From Monday, April 22, 2013 06:00:00 AM </title>
      <description><![CDATA[Kennedy Highway, Walkamin - Commencing: 22 April, at 6:00am planned roadworks are taking place Both Directions.
Lane or lanes reduced. Short delays expected. Changed traffic conditions. Expected completion is end of June .

Pavement rehabilitation]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=403623</link>
    </item>
    <item>
      <title street="WARREGO HIGHWAY" suburb="HATTON VALE" dateFrom="Monday, April 22, 2013" timeFrom="06:00:00 AM" dateTo="Sunday, June 30, 2013" timeTo="04:00:00 PM">WARREGO HIGHWAY HATTON VALE From Monday, April 22, 2013 06:00:00 AM to Sunday, June 30, 2013 04:00:00 PM</title>
      <description><![CDATA[Warrego Highway, Hatton Vale - Commencing: 22 April, at 6:00am planned roadworks are taking place Westbound.
Short delays expected. Changed traffic conditions. Expected completion is 30 June, at 4:00pm.

Improvement works to start Tuesday 23 April 2013 to end June 2013.

Works will include pavement widening, extensions of culverts, installation of an acceleration lane (westbound), street lighting and guardrails.

Some traffic delays, construction noise and reduced speed limits can be expected though the work site between 6am and 4pm, Monday to Friday, weather and construction permitting. 
]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=403599</link>
    </item>
    <item>
      <title street="EAST STREET" suburb="IPSWICH" dateFrom="Sunday, April 21, 2013" timeFrom="08:00:00 PM" dateTo="Friday, June 21, 2013" timeTo="05:00:00 AM">EAST STREET IPSWICH From Sunday, April 21, 2013 08:00:00 PM to Friday, June 21, 2013 05:00:00 AM</title>
      <description><![CDATA[East Street, Ipswich - Commencing: 21 April, at 8:00pm planned roadworks are taking place Both Directions - Intersection of Mansfield Place and Olga Street.
Short delays expected. Changed traffic conditions. Expected completion is 21 June, at 5:00am.

Night works to start Sunday 21 April 2013 to mid June 2013 to install a new signalised pedestrian crossing facility at the intersection of East Street, Mansfield Place and Olga Street, Ipswich to improve pedestrian safety.

Works will be done between 8pm and 5am, Sunday to Thursday, weather and construction permitting.

Some traffic delays, construction noise and reduced speed limits can be expected.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=403025</link>
    </item>
    <item>
      <title street="KENNEDY HIGHWAY" suburb="MACALISTER RANGE" dateFrom="Tuesday, April 16, 2013" timeFrom="06:58:00 AM" dateTo="" timeTo="">KENNEDY HIGHWAY MACALISTER RANGE From Tuesday, April 16, 2013 06:58:00 AM </title>
      <description><![CDATA[Kennedy Highway, Macalister Range - Commencing: 14 April, at 6:00am planned roadworks are taking place Both Directions - Work will continue this weekend on one section of road. for slope stabilisation.
One lane blocked. Medium delays expected. Allow extra travel time. Expected completion is end October 2013.

Work will continue 24 hours, Sunday 6:00am to Friday 3:00pm, until the end of October 2013, weather permitting.

Reduced speed limits will be in place along with single lane closures and manually operated traffic lights.

Motorists can expect delays of up to 15 minutes during the works.

Motorists are urged to obey changed traffic conditions and allow additional travel time while these important repairs are carried out.

For more information, please contact 1800 184 317* or email reconstruct_cairns@tmr.qld.gov.au]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=390798</link>
    </item>
    <item>
      <title street="PENINSULA DEVELOPMENTAL ROAD" suburb="LAURA" dateFrom="Tuesday, April 16, 2013" timeFrom="06:00:00 AM" dateTo="" timeTo="">PENINSULA DEVELOPMENTAL ROAD LAURA From Tuesday, April 16, 2013 06:00:00 AM </title>
      <description><![CDATA[Peninsula Developmental Road, Laura - Commencing: 16 April, at 6:00am planned roadworks are taking place Both Directions - North Laura River Bridge. General earthworks to construct new alignment at approaches to the bridge.
Partial lane closures. Short delays expected. Observe signage. Expected completion is End of June.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=402404</link>
    </item>
    <item>
      <title street="PACIFIC MOTORWAY" suburb="MOUNT GRAVATT" dateFrom="Monday, April 15, 2013" timeFrom="08:00:00 PM" dateTo="Sunday, June 30, 2013" timeTo="05:00:00 AM">PACIFIC MOTORWAY MOUNT GRAVATT From Monday, April 15, 2013 08:00:00 PM to Sunday, June 30, 2013 05:00:00 AM</title>
      <description><![CDATA[Pacific Motorway, Mount Gravatt - Commencing: 15 April, at 8:00pm planned roadworks are taking place Both Directions.
Partial lane closures. Short delays expected. Observe signage. Expected completion is 30 June, at 5:00am.

Please be advised that there will be night works on the Pacific Motorway between Mt Gravatt and Eight Mile Plains to install guardrails, remove transit (T2) lanes and reconfigure all lanes from Monday 15 April to mid 2013 between 8pm and 5am. 

Reduced speed limits, minor delays, lane closures and traffic control will be on site. Please drive to the conditions and plan your trip accordingly. 
]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=400643</link>
    </item>
    <item>
      <title street="BARKLY HIGHWAY" suburb="BARKLY" dateFrom="Monday, April 15, 2013" timeFrom="06:00:00 AM" dateTo="Sunday, June 30, 2013" timeTo="06:00:00 PM">BARKLY HIGHWAY BARKLY From Monday, April 15, 2013 06:00:00 AM to Sunday, June 30, 2013 06:00:00 PM</title>
      <description><![CDATA[Barkly Highway, Barkly - Commencing: 15 April, at 6:00am planned roadworks are taking place Eastbound.
Partial lane closures. Short delays expected. Proceed with caution. Expected completion is 30 June, at 6:00pm.

Motorists are advised that culvert repair works will commence in mid-April on the Barkly Highway approximately 45km east of Mount Isa.

Only short delays are expected, however an eastbound overtaking lane will be closed to enable the works to be completed. 

Motorists are advised to observe signage and proceed with caution.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=397253</link>
    </item>
    <item>
      <title street="WARREGO HIGHWAY" suburb="BUNGIL" dateFrom="Monday, April 15, 2013" timeFrom="06:00:00 AM" dateTo="" timeTo="">WARREGO HIGHWAY BUNGIL From Monday, April 15, 2013 06:00:00 AM </title>
      <description><![CDATA[Warrego Highway, Bungil - Commencing: 15 April 2013, between the hours of 6am and 6pm planned roadworks are taking place Both Directions - Approximately 6 kilometres west of Roma.
Single lane in operation. Medium delays expected. Changed traffic conditions. Expected completion is 30 April 2014, weather permitting.

On Site during working hours (6am-6pm): Reduced Speed Limit 40km/h, Portable Traffic Signals on site with possible delays of up to 10 minutes.

On Site During NON working hours and Overnight (6pm-6am): Reduced Speed Limit 60km/h. Portable Traffic Signals on site with possible delays of up to 10 minutes.

Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au ]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=402418</link>
    </item>
    <item>
      <title street="MAREEBA DIMBULAH ROAD" suburb="MAREEBA" dateFrom="Monday, April 08, 2013" timeFrom="08:00:00 AM" dateTo="" timeTo="">MAREEBA DIMBULAH ROAD MAREEBA From Monday, April 08, 2013 08:00:00 AM </title>
      <description><![CDATA[Mareeba Dimbulah Road, Mareeba - Commencing: 08 April, at 8:00am planned roadworks are taking place Both Directions.
Partial lane closures. Short delays expected. Observe signage. Expected completion is 14 June, at 5:00pm.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=397251</link>
    </item>
    <item>
      <title street="MOUNT COTTON ROAD" suburb="CARBROOK" dateFrom="Monday, April 08, 2013" timeFrom="06:30:00 AM" dateTo="Friday, June 21, 2013" timeTo="12:00:00 AM">MOUNT COTTON ROAD CARBROOK From Monday, April 08, 2013 06:30:00 AM to Friday, June 21, 2013 12:00:00 AM</title>
      <description><![CDATA[Mount Cotton Road, Carbrook - Commencing: 08 April, at 6:30am planned roadworks are taking place All directions - Wuduru Road intersection. Continuing for 8-10 weeks.
Limited to one lane. Short delays expected. Proceed with caution. Expected completion is 21 June, at 12:00am.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=397243</link>
    </item>
    <item>
      <title street="WOOLCOCK STREET" suburb="GARBUTT" dateFrom="Thursday, April 04, 2013" timeFrom="06:00:00 AM" dateTo="" timeTo="">WOOLCOCK STREET GARBUTT From Thursday, April 04, 2013 06:00:00 AM </title>
      <description><![CDATA[Woolcock Street, Garbutt - Commencing: 04 April, at 6:00am planned roadworks are taking place All directions - Woolcock Street and Mather Street upgrade of existing roundabout to a fully controlled signalised intersection. Wide load restrictions apply.
Partial lane closures. Short delays expected. Observe signage. Expected completion is late July 2013.

Woolcock Street and Mather Street (Townsville Port Road)
Commenced to late July 2013

Work is well underway for the new intersection upgrade at the Woolcock Street / Mather Street intersection 
Access to Mather Street north and south via Woolcock Street will remain closed until the end of June 2013  
Ergon Energy have commenced the lighting works for this project 
Motorists will encounter heavy traffic volumes during his period and are advised to seek alternative routes 
Traffic controllers and speed restrictions are in place for the duration of the works and motorists will experience longer than normal delays 
Width restrictions also apply, therefore all loads wider than 3.5m are required to contact Greg Munro on 0439 898 827 a minimum of 48 hours prior to passing through this section of road
]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=394809</link>
    </item>
    <item>
      <title street="GOLD COAST HIGHWAY" suburb="PALM BEACH" dateFrom="Wednesday, April 03, 2013" timeFrom="08:22:00 PM" dateTo="Friday, June 07, 2013" timeTo="03:00:00 AM">GOLD COAST HIGHWAY PALM BEACH From Wednesday, April 03, 2013 08:22:00 PM to Friday, June 07, 2013 03:00:00 AM</title>
      <description><![CDATA[Gold Coast Highway, Palm Beach - Commencing: 03 April, at 8:22pm planned roadworks are taking place Northbound.
Lane or lanes reduced. Short delays expected. Reduced speed limit (40km/h). Expected completion is 07 June, at 3:00am.

Pavement repairs]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=395325</link>
    </item>
    <item>
      <title street="BRUCE HIGHWAY" suburb="COOLBIE" dateFrom="Tuesday, April 02, 2013" timeFrom="11:23:00 AM" dateTo="" timeTo="">BRUCE HIGHWAY COOLBIE From Tuesday, April 02, 2013 11:23:00 AM </title>
      <description><![CDATA[Bruce Highway, Coolbie - Commencing: 02 April, at 11:23am planned roadworks are taking place Both Directions - Mosquito Creek Insulator Creek and at Sullivans Swamp. Wide load restrictions apply.
Partial lane closures. Short delays expected. Observe signage. Expected completion is end of June 2013.

Bruce Highway (Townsville - Ingham)
Mosquito Creek - Insulator Creek and Sullivan Swamp

*  Natural Disaster Relief and Recovery work has commenced between Mosquito Creek and Insulator Creek and at Sullivan Swamp. 
*  For the safety of motorists and workers, single lane closures and speed restrictions are in place and delays of up to 10-15 minutes can be expected.
*  The site will be operating under traffic lights therefore motorists have been advised to observe and obey lights and all signage when travelling through this project.
*  Width restrictions are in place, and as a result all loads wider than 4 metres are required to contact Paul Doherty on 0427 613 375 a minimum of 24 hours prior to passing through this section of road.
]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=394812</link>
    </item>
    <item>
      <title street="BRUCE HIGHWAY" suburb="ALLIGATOR CREEK" dateFrom="Tuesday, April 02, 2013" timeFrom="10:32:00 AM" dateTo="Saturday, August 31, 2013" timeTo="04:00:00 PM">BRUCE HIGHWAY ALLIGATOR CREEK From Tuesday, April 02, 2013 10:32:00 AM to Saturday, August 31, 2013 04:00:00 PM</title>
      <description><![CDATA[Bruce Highway, Alligator Creek - Commencing: 02 April, at 10:32am planned roadworks are taking place Both Directions - From Killymoon Creek to Tindall Court construction of northbound overtaking lane. Wide load restrictions apply..
Limited to one lane. Short delays expected. Changed traffic conditions. Expected completion is 31 August, at 4:00pm.

Bruce Highway - Killymoon Creek to Tindall Court overtaking lanes

Duration: Late March 2013 - Mid August 2013
Working Hours: 7:00am to 5:00pm Monday to Saturday
Changed traffic conditions:  Lane closures and speed restrictions.

*  Works to construct a northbound overtaking lane on the Bruce Highway, between Killymoon Creek and Tindall Court, has commenced and will continue until August 2013.

*  The new overtaking lane will improve safety and efficiency on the Bruce Highway between Ayr and Townsville.

*  Single lane closures and speed restrictions with delays of up to 10 minutes will be in place for the duration of the works.

*  Motorists are asked to travel through this site with caution.

Earthworks, culvert replacements, drainage works, pavement stabilisation and bitumen sealing will be completed as part of the project.

Your patience and cooperation is appreciated while the works are underway.

IMPORTANT INFORMATION FOR EXCESS DIMENSION VEHICLE OPERATORS:

Operators with loads in excess of 3.5 metres in width intending to travel on this section of the Bruce Highway must contact Site Supervisor, Andrew Law on 0407 745 941.


]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=387941</link>
    </item>
    <item>
      <title street="DECEPTION BAY ROAD" suburb="DECEPTION BAY" dateFrom="Tuesday, April 02, 2013" timeFrom="06:00:00 AM" dateTo="Sunday, June 30, 2013" timeTo="06:00:00 PM">DECEPTION BAY ROAD DECEPTION BAY From Tuesday, April 02, 2013 06:00:00 AM to Sunday, June 30, 2013 06:00:00 PM</title>
      <description><![CDATA[Deception Bay Road, Deception Bay - Commencing: 02 April, at 6:00am planned roadworks are taking place All directions - Anzac Avenue from  Bruce Highway to Rothwell early April 2013 to mid 2013 6am to 6pm Monday to Friday
Lane closure reduced speed limits and Traffic Controllers  apply
Information Kamran Jami, Project Manager 5451 7055 or 13 19 40 or www.131940.com.au.
.
Partial lane closures. Short delays expected. Changed traffic conditions. Expected completion is 30 June, at 6:00pm.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=421271</link>
    </item>
    <item>
      <title street="DIRRANBANDI HEBEL ROAD" suburb="DIRRANBANDI" dateFrom="Tuesday, April 02, 2013" timeFrom="06:00:00 AM" dateTo="" timeTo="">DIRRANBANDI HEBEL ROAD DIRRANBANDI From Tuesday, April 02, 2013 06:00:00 AM </title>
      <description><![CDATA[Dirranbandi Hebel Road, Dirranbandi - Commencing: 2 April 2013, between the hours of 6:00am and 6:00pm planned roadworks are taking place Both Directions - Five floodway sites over a 90 kilometere stretch between Hebel and Dirranbandi Road .
Single lane in operation. Medium delays expected. Changed traffic conditions. Expected completion is 31 December 2013, weather permitting.

On Site during working hours (6am-6pm): Reduced Speed Limit 40km/h, Portable Traffic Signals on site with possible delays of up to 15 minutes at EACH SITE. Please allow extra travel time.

On Site During NON working hours and Overnight (6pm-6am): Reduced Speed Limit 40km/h. Portable Traffic Signals on site with possible delays of up to 15 minutes at EACH SITE. Please allow extra travel time.

Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au ]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=390821</link>
    </item>
    <item>
      <title street="WARREGO HIGHWAY" suburb="MORVEN" dateFrom="Tuesday, April 02, 2013" timeFrom="06:00:00 AM" dateTo="" timeTo="">WARREGO HIGHWAY MORVEN From Tuesday, April 02, 2013 06:00:00 AM </title>
      <description><![CDATA[Warrego Highway, Morven - Commencing: 02 April, at 6:00am planned roadworks are taking place All directions - Between Mitchell and Morven.
Single lane in operation. Medium delays expected. Reduced speed limit (60km/h). Expected completion is 31 December 2013 at 06.00PM.

Portable traffic signals will be use in.
Motorists can expect delays of up to 20 minutes. ]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=392415</link>
    </item>
    <item>
      <title street="BRUCE HIGHWAY" suburb="MOUNT SURROUND" dateFrom="Monday, April 01, 2013" timeFrom="07:00:00 AM" dateTo="Sunday, June 30, 2013" timeTo="04:00:00 PM">BRUCE HIGHWAY MOUNT SURROUND From Monday, April 01, 2013 07:00:00 AM to Sunday, June 30, 2013 04:00:00 PM</title>
      <description><![CDATA[Bruce Highway, Mount Surround - Commencing: 01 April, at 7:00am planned roadworks are taking place Northbound - 100m east of Sarri Road.
No delays expected. Proceed with caution. Expected completion is 30 June, at 4:00pm.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=423624</link>
    </item>
    <item>
      <title street="ISIS HIGHWAY" suburb="BIGGENDEN" dateFrom="Wednesday, March 27, 2013" timeFrom="09:15:00 AM" dateTo="" timeTo="">ISIS HIGHWAY BIGGENDEN From Wednesday, March 27, 2013 09:15:00 AM </title>
      <description><![CDATA[Isis Highway, Biggenden - Commencing: now planned roadworks are taking place Both Directions - Between Biggenden and Ban Ban Springs.
Lane or lanes reduced. Short delays expected. Reduced speed limit (40km/h). Expected completion is mid-2013, weather permitting.

Reconstruction works will be undertaken along the Isis Highway between Biggenden and Ban Ban Springs. Delays are anticipated to be five minutes. For further information please contact Transport and Main Roads (Wide Bay/Burnett Region) on 1300 728 390 during business hours.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=391893</link>
    </item>
    <item>
      <title street="BRUCE HIGHWAY" suburb="WALLAVILLE" dateFrom="Wednesday, March 27, 2013" timeFrom="09:12:00 AM" dateTo="" timeTo="">BRUCE HIGHWAY WALLAVILLE From Wednesday, March 27, 2013 09:12:00 AM </title>
      <description><![CDATA[Bruce Highway, Wallaville - Commencing: now, planned roadworks are taking place Both Directions - Various sites between Maryborough and Gin Gin.
Lane or lanes reduced. Short delays expected. Allow extra travel time. Expected completion is late 2013, weather permitting.

Reconstruction works are underway at various sites along the highway between Maryborough and Gin Gin. Please observe all signage and obey all traffic controllers' instructions.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=353805</link>
    </item>
    <item>
      <title street="CHILDERS ROAD" suburb="NORTH ISIS" dateFrom="Wednesday, March 27, 2013" timeFrom="09:05:00 AM" dateTo="" timeTo="">CHILDERS ROAD NORTH ISIS From Wednesday, March 27, 2013 09:05:00 AM </title>
      <description><![CDATA[Childers Road, North Isis - Commencing: Monday 11 March planned roadworks are taking place Both Directions - Between Hendricksens and Hapsburgs roads.
Both lanes affected. Short delays expected. Changed traffic conditions. Expected completion is late 2013, weather permitting.

Preliminary construction works are complete and construction works will now continue until late 2013. Works will predominantly be adjacent to the highway, however some works will directly impact the highway and will require lane closures. To ensure the safety of motorists and road workers, speed reductions will be in place as required. Motorists may encounter lane closures and stop-and-go traffic control during these works, and motorists are advised to factor additional travel time to their journey. In addition, motorists are asked to be patient, drive to the changed conditions and obey all signage while these important works are carried out. For further information please contact Transport and Main Roads (Wide Bay/Burnett Region) on 1300 728 390 during business hours.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=383306</link>
    </item>
    <item>
      <title street="GIN GIN MOUNT PERRY ROAD" suburb="MOUNT PERRY" dateFrom="Wednesday, March 27, 2013" timeFrom="09:04:00 AM" dateTo="" timeTo="">GIN GIN MOUNT PERRY ROAD MOUNT PERRY From Wednesday, March 27, 2013 09:04:00 AM </title>
      <description><![CDATA[Gin Gin Mount Perry Road, Mount Perry - Commencing: Tuesday 8 January planned roadworks are taking place Both Directions - Between the North Burnett Regional Council border and Mount Perry.
Lane or lanes reduced. Short delays expected. Reduced speed limit (40km/h). Expected completion is mid-2013, weather permitting.

Reconstruction works are underway on Gin Gin-Mount Perry Road between the North Burnett Regional Council border and Mount Perry. Some changed conditions, including speed restrictions, are in place and motorists may experience delays of up to five minutes during work hours. For further information please contact Transport and Main Roads (Wide Bay/Burnett Region) on 1300 728 390 during business hours.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=343850</link>
    </item>
    <item>
      <title street="BRUCE HIGHWAY" suburb="KOLONGA" dateFrom="Wednesday, March 27, 2013" timeFrom="09:03:00 AM" dateTo="" timeTo="">BRUCE HIGHWAY KOLONGA From Wednesday, March 27, 2013 09:03:00 AM </title>
      <description><![CDATA[Bruce Highway, Kolonga - Commencing: now planned roadworks are taking place Both Directions - Various sites between Gin Gin and the Kolan River.
Lane or lanes reduced. Short delays expected. Allow extra travel time. Expected completion is late 2013, weather permitting.

Reconstruction works are underway at various sites along the highway between Gin Gin and the Kolan River. Please observe all signage and obey all traffic controllers' instructions.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=353806</link>
    </item>
    <item>
      <title street="WIDE BAY HIGHWAY" suburb="KILKIVAN" dateFrom="Wednesday, March 27, 2013" timeFrom="09:01:00 AM" dateTo="" timeTo="">WIDE BAY HIGHWAY KILKIVAN From Wednesday, March 27, 2013 09:01:00 AM </title>
      <description><![CDATA[Wide Bay Highway, Kilkivan - Commencing: now, planned roadworks are taking place Both Directions - Between Craigallian and Goomeri.
Limited to one lane. Short delays expected. Reduced speed limit (40km/h). Expected completion is June 2013, weather permitting.

One lane will be closed with stop-and-go traffic arrangements in place and delays of about five minutes. For further information please contact Transport and Main Roads (Wide Bay/Burnett Region) on 1300 728 390 during business hours.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=353236</link>
    </item>
    <item>
      <title street="BRUCE HIGHWAY" suburb="HORTON" dateFrom="Wednesday, March 27, 2013" timeFrom="09:00:00 AM" dateTo="" timeTo="">BRUCE HIGHWAY HORTON From Wednesday, March 27, 2013 09:00:00 AM </title>
      <description><![CDATA[Bruce Highway, Horton - Commencing: Monday 6 August 2012 planned roadworks are taking place Both Directions - Between one kilometre north of the Buxton Rd turn-off and south of Goodwood Rd.
Single lane in operation. No delays expected. Reduced speed limit (40km/h). Expected completion is mid-2013, weather permitting.

Works are currently underway between one kilometre north of the Buxton Road turn-off and Aerodrome Road. Speed limit will be reduced to 40km/h with stop-and-go traffic arrangements in place and delays of around five minutes. For further information please contact Transport and Main Roads (Wide Bay/Burnett Region) on 1300 728 390 during business hours.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=279677</link>
    </item>
    <item>
      <title street="MARY VALLEY ROAD" suburb="JONES HILL" dateFrom="Wednesday, March 27, 2013" timeFrom="09:00:00 AM" dateTo="" timeTo="">MARY VALLEY ROAD JONES HILL From Wednesday, March 27, 2013 09:00:00 AM </title>
      <description><![CDATA[Mary Valley Road, Jones Hill - Commencing: October, 2012 planned roadworks are taking place Both Directions - Between Dawn Road and Lawson Road.
Partial lane closures. Medium delays expected. Allow extra travel time. Expected completion is by mid 2013, weather permitting.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=311408</link>
    </item>
    <item>
      <title street="BURNETT HIGHWAY" suburb="GOOMERI" dateFrom="Wednesday, March 27, 2013" timeFrom="08:59:00 AM" dateTo="" timeTo="">BURNETT HIGHWAY GOOMERI From Wednesday, March 27, 2013 08:59:00 AM </title>
      <description><![CDATA[Burnett Highway, Goomeri - Commencing: now, planned roadworks are taking place Both Directions - Between Goomeri and Gayndah.
Limited to one lane. Short delays expected. Reduced speed limit (40km/h). Expected completion is October 2013, weather permitting.

One lane will be closed with stop-and-go traffic arrangements in place and delays of about five minutes. For further information please contact Transport and Main Roads (Wide Bay/Burnett Region) on 1300 728 390 during business hours. ]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=353235</link>
    </item>
    <item>
      <title street="EIDSVOLD THEODORE ROAD" suburb="EIDSVOLD" dateFrom="Wednesday, March 27, 2013" timeFrom="08:58:00 AM" dateTo="" timeTo="">EIDSVOLD THEODORE ROAD EIDSVOLD From Wednesday, March 27, 2013 08:58:00 AM </title>
      <description><![CDATA[Eidsvold Theodore Road, Eidsvold - Commencing: now planned roadworks are taking place Both Directions - West of Eidsvold.
Lane or lanes reduced. No delays expected. Changed traffic conditions. Expected completion is to be advised.

A project to upgrade various sections of a 77km stretch of Eidsvold-Theodore Road, within the North Burnett Regional Council boundary are continuing. Works include bridge repairs, culvert replacements and road widening. For further information on these works, please contact Transport and Main Roads (Wide Bay/Burnett Region) on 1300 728 390 during business hours.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=232737</link>
    </item>
    <item>
      <title street="KINGAROY BURRANDOWAN ROAD" suburb="CHAHPINGAH" dateFrom="Wednesday, March 27, 2013" timeFrom="08:57:00 AM" dateTo="" timeTo="">KINGAROY BURRANDOWAN ROAD CHAHPINGAH From Wednesday, March 27, 2013 08:57:00 AM </title>
      <description><![CDATA[Kingaroy Burrandowan Road, Chahpingah - Commencing: Friday 25 January planned roadworks are taking place Both Directions - At the Boyne River Bridge.
Both lanes affected. No delays expected. Changed traffic conditions. Expected completion is mid-2013, weather permitting.

The Boyne River Bridge is load limited to 30-tonne GVM while structural rehabilitation works are completed. Alternative routes may be available via Chinchilla-Wondai Road and Memerambi-Gordonbrook Road.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=360339</link>
    </item>
    <item>
      <title street="MARY VALLEY ROAD" suburb="BROOLOO" dateFrom="Wednesday, March 27, 2013" timeFrom="08:53:00 AM" dateTo="" timeTo="">MARY VALLEY ROAD BROOLOO From Wednesday, March 27, 2013 08:53:00 AM </title>
      <description><![CDATA[Mary Valley Road, Brooloo - Commencing: now planned roadworks are taking place Both Directions - Between Gympie and Brooloo.
Limited to one lane. Short delays expected. Reduced speed limit (40km/h). Expected completion is mid-2013, weather permitting.

One lane will be closed with stop-and-go traffic arrangements in place and delays of about five minutes. For further information please contact Transport and Main Roads (Wide Bay/Burnett Region) on 1300 728 390 during business hours.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=353239</link>
    </item>
    <item>
      <title street="MARYBOROUGH COOLOOLA ROAD" suburb="BOONOOROO PLAINS" dateFrom="Wednesday, March 27, 2013" timeFrom="08:53:00 AM" dateTo="" timeTo="">MARYBOROUGH COOLOOLA ROAD BOONOOROO PLAINS From Wednesday, March 27, 2013 08:53:00 AM </title>
      <description><![CDATA[Maryborough Cooloola Road, Boonooroo Plains - Commencing: 14 February 2013 planned roadworks are taking place Both Directions - Between Maryborough and Tinnanbar Road.
Lane or lanes reduced. Short delays expected. Reduced speed limit (40km/h). Expected completion is mid-2013, weather permitting.

Reconstruction works will be undertaken at various sites along Maryborough–Cooloola Road between Maryborough and Tinnanbar Road. This is in addition to reconstruction works undertaken in 2012. Stop-and-go traffic arrangements are in place at a number of locations, with anticipated delays of approximately five minutes per site. For further information please contact Transport and Main Roads (Wide Bay/Burnett Region) on 1300 728 390 during business hours.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=371280</link>
    </item>
    <item>
      <title street="CHINCHILLA WONDAI ROAD" suburb="BALLOGIE" dateFrom="Wednesday, March 27, 2013" timeFrom="08:51:00 AM" dateTo="" timeTo="">CHINCHILLA WONDAI ROAD BALLOGIE From Wednesday, March 27, 2013 08:51:00 AM </title>
      <description><![CDATA[Chinchilla Wondai Road, Ballogie - Commencing: now planned roadworks are taking place Both Directions - Between Durong and Tingoora.
Limited to one lane. Short delays expected. Reduced speed limit (40km/h). Expected completion is June 2013, weather permitting.

One lane will be closed with stop-and-go traffic arrangements in place and delays of about five minutes. For further information please contact Transport and Main Roads (Wide Bay/Burnett Region) on 1300 728 390 during business hours.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=353237</link>
    </item>
    <item>
      <title street="UNIVERSITY ROAD" suburb="ANNANDALE" dateFrom="Tuesday, March 26, 2013" timeFrom="07:00:00 AM" dateTo="Monday, July 01, 2013" timeTo="06:00:00 PM">UNIVERSITY ROAD ANNANDALE From Tuesday, March 26, 2013 07:00:00 AM to Monday, July 01, 2013 06:00:00 PM</title>
      <description><![CDATA[University Road, Annandale - Commencing: 26 March, at 7:00am planned roadworks are taking place Both Directions - Erecting signage for site entry between Cluden Drive and Lachlan wilson Drive.
No blockage. No delays expected. Observe signage. Expected completion is 01 July, at 6:00pm.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=391291</link>
    </item>
    <item>
      <title street="KILKIVAN TANSEY ROAD" suburb="CINNABAR" dateFrom="Monday, March 25, 2013" timeFrom="04:40:00 PM" dateTo="" timeTo="">KILKIVAN TANSEY ROAD CINNABAR From Monday, March 25, 2013 04:40:00 PM </title>
      <description><![CDATA[Kilkivan Tansey Road, Cinnabar - Commencing: now planned roadworks are taking place Both Directions - Between Kilkivan and Tansey.
Limited to one lane. Short delays expected. Reduced speed limit (40km/h). Expected completion is mid-2013, weather permitting.

One lane will be closed with stop-and-go traffic arrangements in place, and delays of approximately five minutes. For further information please contact Transport and Main Roads (Wide Bay/Burnett Region) on 1300 728 390 during business hours.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=391392</link>
    </item>
    <item>
      <title street="KENILWORTH SKYRING CREEK ROAD" suburb="TUCHEKOI" dateFrom="Monday, March 25, 2013" timeFrom="04:37:00 PM" dateTo="" timeTo="">KENILWORTH SKYRING CREEK ROAD TUCHEKOI From Monday, March 25, 2013 04:37:00 PM </title>
      <description><![CDATA[Kenilworth Skyring Creek Road, Tuchekoi - Commencing: now planned roadworks are taking place Both Directions - Between the Bruce Highway and Carters Ridge.
Limited to one lane. Short delays expected. Reduced speed limit (40km/h). Expected completion is mid-2013, weather permitting.

One lane will be closed with stop-and-go traffic arrangements in place, and delays of approximately five minutes. For further information please contact Transport and Main Roads (Wide Bay/Burnett region) on 1300 728 390 during business hours.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=391388</link>
    </item>
    <item>
      <title street="MALENY KENILWORTH ROAD" suburb="CONONDALE" dateFrom="Monday, March 25, 2013" timeFrom="05:30:00 AM" dateTo="" timeTo="">MALENY KENILWORTH ROAD CONONDALE From Monday, March 25, 2013 05:30:00 AM </title>
      <description><![CDATA[Maleny Kenilworth Road, Conondale - Commencing: 25 March, at 5:30am planned roadworks are taking place Both Directions - Work underway on replacement of Grigor Bridge at Conondale.  Construction includes bridgeworks and associated civil works.  Existing bridge remains operational..
Both lanes affected. Short delays expected. Proceed with caution. Expected completion is to be advised.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=381682</link>
    </item>
    <item>
      <title street="LEICHHARDT HIGHWAY" suburb="GROSMONT" dateFrom="Thursday, March 21, 2013" timeFrom="07:49:00 AM" dateTo="" timeTo="">LEICHHARDT HIGHWAY GROSMONT From Thursday, March 21, 2013 07:49:00 AM </title>
      <description><![CDATA[Leichhardt Highway, Grosmont - Commencing: 02 April 2013, between the hours of 6:00am and 6:00pm planned roadworks are taking place Both Directions - Approximately 35 kilometers South of Taroom.
Single lane in operation. Short delays expected. Changed traffic conditions. Expected completion is 1 July 2013, weather permitting.

On Site during working hours (6am-6pm): Reduced Speed Limit 40km/h, Portable Traffic Signals on site with possible delays of up to 5 minutes

On Site During NON working hours and Overnight (6pm-6am): Reduced Speed Limit 60km/h, Portable Traffic Signals on site with possible delays of up to 5 minutes

Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au ]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=388972</link>
    </item>
    <item>
      <title street="BEAUDESERT BEENLEIGH ROAD" suburb="TAMBORINE" dateFrom="Wednesday, March 20, 2013" timeFrom="09:12:00 AM" dateTo="" timeTo="">BEAUDESERT BEENLEIGH ROAD TAMBORINE From Wednesday, March 20, 2013 09:12:00 AM </title>
      <description><![CDATA[Beaudesert Beenleigh Road, Tamborine - Commencing: 20 March planned roadworks are taking place All directions.
Lane or lanes reduced. Medium delays expected. Allow extra travel time. Expected completion is late May 2013.

Construction of the pavement surface for the new roundabout at the intersection of Beaudesert-Beenleigh Road and Waterford Tamborine Road]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=388395</link>
    </item>
    <item>
      <title street="GREGORY DEVELOPMENTAL ROAD" suburb="BASALT" dateFrom="Tuesday, March 19, 2013" timeFrom="02:13:00 PM" dateTo="" timeTo="">GREGORY DEVELOPMENTAL ROAD BASALT From Tuesday, March 19, 2013 02:13:00 PM </title>
      <description><![CDATA[Gregory Developmental Road, Basalt - Commencing: 19 March, at 2:13pm planned roadworks are taking place Both Directions - Between Hervey Range Road and just north of Stockyard Creek Floodway. Wide load restrictions apply.
Partial lane closures. Short delays expected. Observe signage. Expected completion is end of March 2014.

Gregory Developmental Road
Operation Queenslaner - Reconstruction works
Early February - March 2014

- Natural Disaster Relief and Recovery Arrangements work along the Gregory Developmental Road between Hervey's Range Road and just north of Stockyard Creek floodway are progressing.
- Traffic controllers and speed restrictions will also be in place for the duration of the works and delays of up to 10 minutes can be expected.  Traffic signals will be in operation after hours.
- All Excess dimension loads wider than 3.5m are to contact either the site office on 4788 5091 or Jesse Palk on 0427 469 946 or Stevie Hughes 0407 159 920 or Warren Preston 0439 898 334 prior to passing through the roadworks, with notice to be provided a minimum of 24 hours in advance.
]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=371887</link>
    </item>
    <item>
      <title street="FLINDERS HIGHWAY" suburb="REID RIVER" dateFrom="Tuesday, March 19, 2013" timeFrom="11:32:00 AM" dateTo="" timeTo="">FLINDERS HIGHWAY REID RIVER From Tuesday, March 19, 2013 11:32:00 AM </title>
      <description><![CDATA[Flinders Highway, Reid River - Commencing: 19 March, at 11:32am planned roadworks are taking place Both Directions - Between Woodstock turnoff and Reid River.  Wide load restrictions apply.
Partial lane closures. Short delays expected. Changed traffic conditions. Expected completion is late June 2013.

Natural Disaster Relief and Recovery Arrangements work along the Flinders Highway between the Woodstock / Giru turnoff and Reid River is continuing 
Section one of this project is nearing completion with final seal and asphalt works occurring in the next couple of weeks 
Traffic controllers and speed restrictions will be in place during the day with traffic signals in operation after hours.  Motorists can expect delays of up to 15 minutes 
Wide loads of more than 3.5m and vehicles operating under excess mass guidelines or permits are directed to contact Reg Webb on 0428 104 628 prior to passing through the roadworks, with notice to be provided a minimum of 24 hours in advance
]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=335731</link>
    </item>
    <item>
      <title street="PENINSULA DEVELOPMENTAL ROAD" suburb="LAURA" dateFrom="Sunday, March 17, 2013" timeFrom="07:00:00 AM" dateTo="" timeTo="">PENINSULA DEVELOPMENTAL ROAD LAURA From Sunday, March 17, 2013 07:00:00 AM </title>
      <description><![CDATA[Peninsula Developmental Road, Laura - Commencing: 17 March, at 7:00am planned roadworks are taking place Both Directions - Open upgrade at various sites along the Peninsula Development Road from Laura to Weipa.
Partial lane closures. Short delays expected. Observe signage. Expected completion is end June 2013.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=386274</link>
    </item>
    <item>
      <title street="BRUCE HIGHWAY" suburb="ALLIGATOR CREEK" dateFrom="Monday, March 11, 2013" timeFrom="08:30:00 AM" dateTo="Sunday, June 30, 2013" timeTo="04:30:00 PM">BRUCE HIGHWAY ALLIGATOR CREEK From Monday, March 11, 2013 08:30:00 AM to Sunday, June 30, 2013 04:30:00 PM</title>
      <description><![CDATA[Bruce Highway, Alligator Creek - Commencing: 11 February, at 8:30am planned roadworks are taking place Both Directions - Powerline upgrades are occurring between Billabong Sanctuary and Bentley Drive. There will be a full closure of the Highway whilst cables are being raised and lowered.
Both lanes affected. Short delays expected. Allow extra travel time. Expected completion is 30 June, at 4:30pm.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=423611</link>
    </item>
    <item>
      <title street="BRUCE HIGHWAY" suburb="BEMERSIDE" dateFrom="Wednesday, March 06, 2013" timeFrom="01:28:00 PM" dateTo="" timeTo="">BRUCE HIGHWAY BEMERSIDE From Wednesday, March 06, 2013 01:28:00 PM </title>
      <description><![CDATA[Bruce Highway, Bemerside - Commencing: 06 March, at 1:28pm planned roadworks are taking place Both Directions - NDRRA works are in progress between Hawkins Creek and the Arnot Creek Bridge. Wide load restrictions apply..
Single lane in operation. Short delays expected. Changed traffic conditions. Expected completion is early August 2013.

Bruce Highway (Ingham - Innisfail) Hawkins Creek to Arnot Creek
Operation Queenslander - Reconstruction works
March to early August 2013

**  Natural Disaster Relief and Recovery Arrangements (NDRRA) work between Hawkins Creek and the Arnot Creek bridge, north of Ingham is progressing well 
**  The contractor is continuing to replace damaged road surfaces with four sections now under construction. 
**  Work will start 20 May on the Gairloch Culvert section, requiring single lane closures with traffic controllers manageing traffic flow 
**  Due to the location of the current works, excess dimension loads wider than 3m are to contact Russell Nielsen on 0400 577 675 or Shane Cairncross 0409 843 157 a minimum of 24 hours prior to passing through the roadworks 
**  Speed restrictions and single lane closures with delays of up to 15 minutes will be in place for the duration of the works]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=382184</link>
    </item>
    <item>
      <title street="BRUCE HIGHWAY" suburb="BAMBAROO" dateFrom="Tuesday, March 05, 2013" timeFrom="06:00:00 AM" dateTo="Friday, June 28, 2013" timeTo="06:00:00 PM">BRUCE HIGHWAY BAMBAROO From Tuesday, March 05, 2013 06:00:00 AM to Friday, June 28, 2013 06:00:00 PM</title>
      <description><![CDATA[Bruce Highway, Bambaroo - Commencing: 05 March, at 6:00am planned roadworks are taking place Both Directions - Signage will be in place for works on Scrubview Road and Yuruga Road.
No blockage. No delays expected. Observe signage. Expected completion is 28 June, at 6:00pm.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=429818</link>
    </item>
    <item>
      <title street="KENILWORTH BROOLOO ROAD" suburb="KENILWORTH" dateFrom="Thursday, February 28, 2013" timeFrom="09:39:00 AM" dateTo="" timeTo="">KENILWORTH BROOLOO ROAD KENILWORTH From Thursday, February 28, 2013 09:39:00 AM </title>
      <description><![CDATA[Kenilworth Brooloo Road, Kenilworth - Commencing: 28 February, at 9:39am planned roadworks are taking place All directions - Repairs are being carried out to slip areas.  One lane is open at Beattie and Pullen Creek bridges.  Traffic control is in place..
Limited to one lane. Short delays expected. Observe signage. Expected completion is to be advised. .

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=378491</link>
    </item>
    <item>
      <title street="PACIFIC MOTORWAY" suburb="LOGANHOLME" dateFrom="Tuesday, February 26, 2013" timeFrom="08:00:00 PM" dateTo="Saturday, August 31, 2013" timeTo="05:00:00 AM">PACIFIC MOTORWAY LOGANHOLME From Tuesday, February 26, 2013 08:00:00 PM to Saturday, August 31, 2013 05:00:00 AM</title>
      <description><![CDATA[Pacific Motorway, Loganholme - Commencing: 26 February, at 8:00pm planned roadworks are taking place Southbound.
Lane or lanes reduced. Short delays expected. Allow extra travel time. Expected completion is 31 August, at 5:00am.

Resurfacing works will be occurring on the Pacific Motorway southbound between exits 31 to exit 38 from 8.00pm to 5.00am, from 25 February to 31 August 2013. There will be speed reductions and lane closures through work zones. For more information, contact the project team on 55969500]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=377538</link>
    </item>
    <item>
      <title street="PACIFIC MOTORWAY" suburb="BEENLEIGH" dateFrom="Monday, February 25, 2013" timeFrom="04:46:00 PM" dateTo="" timeTo="">PACIFIC MOTORWAY BEENLEIGH From Monday, February 25, 2013 04:46:00 PM </title>
      <description><![CDATA[Pacific Motorway, Beenleigh - Commencing: March 2013 planned roadworks are taking place Southbound - Logan Motorway Interchange (Exit 31) to Yatala North (Exit 38)southbound.
Lane or lanes reduced. Short delays expected. Allow extra travel time. Expected completion is late August 2013.

Works will be carried out from Monday to Friday from 8pm to 5am.
Works will also be undertaken at:
- Logan Motorway Interchange (Exit 31)
- Beenleigh North Interchange (Exit 34)
- Beenleigh South Interchange (Exit 35)]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=376626</link>
    </item>
    <item>
      <title street="SPRING CREEK ROAD" suburb="KILLARNEY" dateFrom="Thursday, February 21, 2013" timeFrom="06:00:00 AM" dateTo="" timeTo="">SPRING CREEK ROAD KILLARNEY From Thursday, February 21, 2013 06:00:00 AM </title>
      <description><![CDATA[Spring Creek Road, Killarney - Commencing: 11 February 2013, between the hours of 6:00am and 6:00pm planned roadworks are taking place Both Directions - Approximately 2.5km east of the Warwick Killarney Road intersection..
Single lane in operation. Short delays expected. Changed traffic conditions. Expected completion is 24 June 2013, weather permitting.

On Site during working hours (6am-6pm): Reduced Speed Limit 40km/h, Traffic Control on site with possible delays of up to 5 minutes.

On Site During NON working hours and Overnight (6pm-6am): Reduced Speed Limit 40km/h, Portable Traffic Signals on site with possible delays of up to 5 minutes.

Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au ]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=374717</link>
    </item>
    <item>
      <title street="GATEWAY MOTORWAY" suburb="DEAGON" dateFrom="Tuesday, February 19, 2013" timeFrom="08:00:00 PM" dateTo="Wednesday, December 31, 2014" timeTo="11:00:00 PM">GATEWAY MOTORWAY DEAGON From Tuesday, February 19, 2013 08:00:00 PM to Wednesday, December 31, 2014 11:00:00 PM</title>
      <description><![CDATA[Gateway Motorway, Deagon - Commencing: 19 February, at 8:00pm planned roadworks are taking place Both Directions.
No blockage. No delays expected. Changed traffic conditions. Expected completion is 31 December, at 11:00pm.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=373663</link>
    </item>
    <item>
      <title street="GATEWAY MOTORWAY" suburb="ROCHEDALE" dateFrom="Monday, February 18, 2013" timeFrom="09:00:00 AM" dateTo="Tuesday, December 31, 2013" timeTo="09:00:00 AM">GATEWAY MOTORWAY ROCHEDALE From Monday, February 18, 2013 09:00:00 AM to Tuesday, December 31, 2013 09:00:00 AM</title>
      <description><![CDATA[Gateway Motorway, Rochedale - Commencing: 18 February, at 9:00am planned roadworks are taking place Both Directions.
Partial lane closures. Short delays expected. Changed traffic conditions. Expected completion is 31 December, at 9:00am.

The Australian Government and Queensland Government are jointly funding the upgrade of the Gateway Motorway southbound on-ramp to the Pacific Motorway. In addition, the Queensland Government has contributed funding towards the extension of the South East Busway. Works commenced in late 2012 and are scheduled for completion in 2014, weather and construction conditions permitting. Works will be carried out Monday to Friday between 6am and 5pm and Saturdays 6am to 2pm, with some night works and Sundays as required.
Minor traffic delays, lane closures and reduced speed limits through the work site may be expected. Traffic controllers will be on-site when required to ensure safety of road workers, motorists and pedestrians.
Works will include:
Realigning a section of the Gateway Motorway on-ramp to the Pacific Motorway to improve safety.
Lengthening  the on-ramp by 500 meters to provide motorists more time to merge.
Extending the South East Busway  from Eight Mile Plains to School Road, Rochedale to provide improved connection and reduced travel time for buses servicing the Rochedale area.
For further information about the project contact 1800 799 686 or visit the TMR website.
]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=373087</link>
    </item>
    <item>
      <title street="GREGORY DEVELOPMENTAL ROAD" suburb="BROUGHTON" dateFrom="Friday, February 15, 2013" timeFrom="12:35:00 PM" dateTo="" timeTo="">GREGORY DEVELOPMENTAL ROAD BROUGHTON From Friday, February 15, 2013 12:35:00 PM </title>
      <description><![CDATA[Gregory Developmental Road, Broughton - Commencing: weather permitting planned roadworks are taking place Both Directions - Belyando to Charters Towers between Victoria Creek and Policeman Creek.  Also about 4kms of road near the Pajingo Station along the Gregory Developmental Road has had work commence on it.  Wide load restrictions apply.
Partial lane closures. Short delays expected. Traffic control on scene. Expected completion is mid 2013.

GREGORY DEVELOPMENTAL ROAD - (Belyando to Charters Towers)
Operation Queenslander - Reconstruction works

*  The Natural Disaster Relief and Recovery Arrangements work along the Gregory Developmental Road, between Victoria Creek and Policeman Creek is well underway.
*  Completion date is anticipated for mid year, weather permitting.
*  Single lane closures with delays of up to 15 minutes can be expected a work progresses.
*  All Excess dimension loads wider than 3.5m shall contact Brett Harding on 0407 646538 prior to passing through the roadworks, with notice to be provided a minimum of 24 hours in advance.
*  Please also note reconstruction work is also being conducted about 13kms south of this project (refer item below).


Gregory Developmental Road (Belyando-Charters Towers)
Operation Queenslander - Reconstruction work
Pajingo Station
Early April - late June 2013

*  About 4kms of road near the Pajingo Station along the Gregory Developmental Road has commenced.
*  Traffic controllers and speed restrictions will also be in place for the duration of the works and delays of up to 10 minutes can be expected.  Traffic signals will be in operation after hours.
*  All Excess dimension loads wider than 3.5m are to contact either Brett Hearn on 0407 646 538 prior to passing through the roadworks, with notice to be provided a minimum of 24 hours in advance.
*  Please also note reconstruction work is also being conducted about 13kms north of this project (refer above item)

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=280588</link>
    </item>
    <item>
      <title street="BRUCE HIGHWAY" suburb="BEMERSIDE" dateFrom="Friday, February 15, 2013" timeFrom="12:20:00 PM" dateTo="" timeTo="">BRUCE HIGHWAY BEMERSIDE From Friday, February 15, 2013 12:20:00 PM </title>
      <description><![CDATA[Bruce Highway, Bemerside - Commencing: 15 February, at 12:20pm planned roadworks are taking place All directions - Cardwell Range Realignment. Wide load restrictions apply.
Short delays expected. Proceed with caution. Expected completion is late 2013.

Work on realigning the Bruce Highway through the Cardwell Range to improve safety and traffic flow is continuing. Periodic lane closures for the remainder of the works can be expected.  Road restrictions are in place, therefore all loads wider than 3.5m are required to contact Adrian Van Arendonk or his delegate on 0410 463 065 a minimum of 48 hours prior to passing through this section of road. The Cardwell Range Alliance reserves the right to restrict any vehicle not complying with these conditions]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=224254</link>
    </item>
    <item>
      <title street="BRUCE HIGHWAY" suburb="INGHAM" dateFrom="Friday, February 15, 2013" timeFrom="12:16:00 PM" dateTo="" timeTo="">BRUCE HIGHWAY INGHAM From Friday, February 15, 2013 12:16:00 PM </title>
      <description><![CDATA[Bruce Highway, Ingham - Commencing: Early 2013 planned roadworks are taking place Both Directions - Arnot Creek Bridge 60 kilometre an hour speed restriction in place.
No blockage. No delays expected. Observe signage. Expected completion is TBA.

Ingham to Cardwell Range
Arnot Creek Bridge

- The Arnot Creek Bridge is open to two lanes of traffic, however a 60km/hr speed limit over the bridge applies until bridge repairs have been completed.
- Motorists have been advised to observe and obey all signage when travelling through this site.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=343027</link>
    </item>
    <item>
      <title street="SIR SAMUEL GRIFFITH DRIVE" suburb="MOUNT COOT-THA" dateFrom="Monday, February 11, 2013" timeFrom="06:30:00 AM" dateTo="Sunday, February 01, 2015" timeTo="06:30:00 AM">SIR SAMUEL GRIFFITH DRIVE MOUNT COOT-THA From Monday, February 11, 2013 06:30:00 AM to Sunday, February 01, 2015 06:30:00 AM</title>
      <description><![CDATA[Sir Samuel Griffith Drive, Mount Coot-Tha - Commencing: 11 February, at 6:30am planned roadworks are taking place.
One lane blocked. No delays expected. Use alternative route. Expected completion is 01 February, at 6:30am.

From mid-February 2013, Transcity will close a lower section of Sir Samuel Griffith Drive to create increased car parking for the Legacy Way project.

Due to the capacity of the current workforce car parking, approximately 150 additional car spaces are required in this area.

Construction of car spaces on both sides of the lower section of Sir Samuel Griffith Drive will take approximately four to six weeks.

Access to the area will not be available to the general public until 2015.

Construction of a car park in this location has been approved by the Queensland Coordinator General and Brisbane City Council.

Local residents and key stakeholders have been notified of this activity.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=367115</link>
    </item>
    <item>
      <title street="LANDSBOROUGH HIGHWAY" suburb="WINTON" dateFrom="Monday, February 04, 2013" timeFrom="11:06:00 AM" dateTo="Tuesday, December 31, 2013" timeTo="12:00:00 AM">LANDSBOROUGH HIGHWAY WINTON From Monday, February 04, 2013 11:06:00 AM to Tuesday, December 31, 2013 12:00:00 AM</title>
      <description><![CDATA[Landsborough Highway, Winton - Commencing: 04 February, at 11:06am planned roadworks are taking place Both Directions - Longreach-Winton.
No blockage. Short delays expected. Observe signage. Expected completion is 31 December, at 12:00am.

Works involve stabilising, patching and drainage repairs. A major side track at Jessamine Creek (approximately four kilometres) will be used for these works around April to November 2013. Minor traffic delays may be associated with these activities. Works to stabilise batter and under bridge erosion at Thomson River to commence mid-October.

 

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=366467</link>
    </item>
    <item>
      <title street="LANDSBOROUGH HIGHWAY" suburb="ILFRACOMBE" dateFrom="Monday, February 04, 2013" timeFrom="10:59:00 AM" dateTo="Tuesday, December 31, 2013" timeTo="12:00:00 AM">LANDSBOROUGH HIGHWAY ILFRACOMBE From Monday, February 04, 2013 10:59:00 AM to Tuesday, December 31, 2013 12:00:00 AM</title>
      <description><![CDATA[Landsborough Highway, Ilfracombe - Commencing: 04 February, at 10:59am planned roadworks are taking place Both Directions - Barcaldine - Longreach / Augathella - Tambo.
No blockage. No delays expected. Observe signage. Expected completion is 31 December, at 12:00am.

Work is underway on the Landsborough Highway Reconstruction project. The highway will remain open in both directions during reconstruction works, weather permitting.   Several temporary detour tracks are open between Barcaldine and Longreach. At times, traffic may operate under a stop and go arrangement, controlled by traffic signals or traffic controllers. The highway speed limit has been reduced in construction zones.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=366466</link>
    </item>
    <item>
      <title street="BRUCE HIGHWAY" suburb="WRIGHTS CREEK" dateFrom="Thursday, January 31, 2013" timeFrom="10:00:00 AM" dateTo="" timeTo="">BRUCE HIGHWAY WRIGHTS CREEK From Thursday, January 31, 2013 10:00:00 AM </title>
      <description><![CDATA[Bruce Highway, Wrights Creek - Commencing: 31 January, at 10:00am planned roadworks are taking place Both Directions.
Partial lane closures. Short delays expected. Changed traffic conditions. Expected completion is end July.

Construction works are continuing on the Wrights Creek Bridge. Reduced speed limits, single lane closures, traffic controllers and signage will be in place during works.

From Wednesday 12 June to Monday 17(inclusive), there will be no right hand turn into Hill Rd (i.e. northbound Bruce Hwy) and no right hand turn out of Hill Rd due to asphalt works.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=322907</link>
    </item>
    <item>
      <title street="RIVERWAY DRIVE" suburb="THURINGOWA CENTRAL" dateFrom="Thursday, January 31, 2013" timeFrom="07:00:00 AM" dateTo="Wednesday, July 31, 2013" timeTo="04:00:00 PM">RIVERWAY DRIVE THURINGOWA CENTRAL From Thursday, January 31, 2013 07:00:00 AM to Wednesday, July 31, 2013 04:00:00 PM</title>
      <description><![CDATA[Riverway Drive, Thuringowa Central - Commencing: 31 January, at 7:00am planned roadworks are taking place - Construction of median on High Range Drive.
No blockage. No delays expected. Changed traffic conditions. Expected completion is 31 July, at 4:00pm.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=364516</link>
    </item>
    <item>
      <title street="CUNNINGHAM HIGHWAY" suburb="ARATULA" dateFrom="Wednesday, January 16, 2013" timeFrom="03:30:00 PM" dateTo="Monday, September 30, 2013" timeTo="05:00:00 PM">CUNNINGHAM HIGHWAY ARATULA From Wednesday, January 16, 2013 03:30:00 PM to Monday, September 30, 2013 05:00:00 PM</title>
      <description><![CDATA[Cunningham Highway, Aratula - Commencing: 16 January planned roadworks are taking place Both Directions - North and south of Aratula.
Partial lane closures. Short delays expected. Observe signage. Expected completion is 30 September, at 5:00pm.

Roadworks at multiple locations between Kelly Road south, Silverdale and the Helipad at Clumber.

Reduced speed limits will be in place 24 hrs a day. Nightworks taking place at some locations.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=355953</link>
    </item>
    <item>
      <title street="CHARTERS TOWERS ROAD" suburb="HERMIT PARK" dateFrom="Friday, December 28, 2012" timeFrom="07:00:00 AM" dateTo="Tuesday, July 30, 2013" timeTo="04:00:00 PM">CHARTERS TOWERS ROAD HERMIT PARK From Friday, December 28, 2012 07:00:00 AM to Tuesday, July 30, 2013 04:00:00 PM</title>
      <description><![CDATA[Charters Towers Road, Hermit Park - Commencing: 28 December, at 7:00am planned roadworks are taking place Northbound - Trenching, boring cable hauling and pit construction for new NBN installation between Townsend Street and Gleeson Street.
No blockage. No delays expected. Proceed with caution. Expected completion is 30 July, at 4:00pm.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=422426</link>
    </item>
    <item>
      <title street="WARREGO HIGHWAY" suburb="BOWENVILLE" dateFrom="Monday, December 10, 2012" timeFrom="06:00:00 AM" dateTo="" timeTo="">WARREGO HIGHWAY BOWENVILLE From Monday, December 10, 2012 06:00:00 AM </title>
      <description><![CDATA[Warrego Highway, Bowenville - Commencing: 10 December 2012, between the hours of 6:00am - 5:00am planned roadworks are taking place Both Directions - Various location between Jondaryan and Dalby.
One lane closed. Short delays expected. Traffic control on scene. Expected completion is December 2013, weather permitting.

On Site during working hours (6am-5am): Reduced Speed Limit 40km/h, Portable Traffic Signals on site with possible delays of up to 15 minutes.

On Site During NON working hours: Reduced Speed Limit 90km/h. Portable Traffic Signals on site with possible delays of up to 15 minutes.

Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au ]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=339262</link>
    </item>
    <item>
      <title street="NEW ENGLAND HIGHWAY" suburb="CAMBOOYA" dateFrom="Monday, December 03, 2012" timeFrom="06:00:00 AM" dateTo="" timeTo="">NEW ENGLAND HIGHWAY CAMBOOYA From Monday, December 03, 2012 06:00:00 AM </title>
      <description><![CDATA[New England Highway, Cambooya - Commencing: 03 December 2012, between the hours of 6:00am and 6:00pm planned roadworks are taking place Both Directions - 
Location 1: Between Strand Road and Cambooya Connection Road
Location 2: Between Dixon Lane and Faulkners Road.
No blockage. Short delays expected. Changed traffic conditions. Expected completion is August 2013, weather permitting.

On Site during working hours (6am-6pm): Reduced Speed Limit 60km/h, traffic control on scene with possible delays of 5 minutes.

On Site During NON working hours: Reduced Speed Limit 60km/h. 

Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au 
]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=334342</link>
    </item>
    <item>
      <title street="BRUCE HIGHWAY" suburb="BRANDON" dateFrom="Friday, November 30, 2012" timeFrom="05:00:00 PM" dateTo="" timeTo="">BRUCE HIGHWAY BRANDON From Friday, November 30, 2012 05:00:00 PM </title>
      <description><![CDATA[Bruce Highway, Brandon - Commencing: November 2012 planned roadworks are taking place Southbound - Sandy Corner to Collinsons Lagoon.
Unknown traffic impact. Observe signage. Expected completion is Mid 2014.

Sandy Corner to Collinsons Lagoon
Road realignment

** In consultation with Sucrogen, the project mangers and traffic assessment team will look at reducing the speed limit where the sugar tramline crosses the Bruce Highway near the BSES.  The reduction in speed will allow the tram drivers to proceed safely through the site. 
The construction of a new southbound overtaking lane is taking shape, and is only a few months away for full utilisation.  
Haulage trucks enter and leave the project site each day to bring material in for the construction on the tram rail overpass.  Speed restrictions have been in place on the entire 5km project site, TMR asks all motorists to adhere to these restrictions as police enforcement regularly patrols this section of the highway 
Sugar cane season has now commenced, TMR would like to advise all motorists to drive to the conditions of the road and be aware of cane haulage vehicles using the Highway 
The Driver Reviver Stop at Sandy Corner will be closed until late July 2013.  The closure will allow the construction crew to complete pavement and electrical works 
**  Motorists are asked to please drive with caution for the safety of our workers]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=334108</link>
    </item>
    <item>
      <title street="COOPER DEVELOPMENTAL ROAD" suburb="QUILPIE" dateFrom="Tuesday, November 27, 2012" timeFrom="08:26:00 AM" dateTo="" timeTo="">COOPER DEVELOPMENTAL ROAD QUILPIE From Tuesday, November 27, 2012 08:26:00 AM </title>
      <description><![CDATA[Cooper Developmental Road, Quilpie - Commencing: 27 November 2012 planned roadworks are taking place.
No delays expected. Expected completion is 28 June 2013.

Reconstruction works are under way at various locations over 140km. Delays of up to 10 mins can be expected.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=333209</link>
    </item>
    <item>
      <title street="ADAVALE BLACKALL ROAD" suburb="ADAVALE" dateFrom="Tuesday, November 27, 2012" timeFrom="08:24:00 AM" dateTo="" timeTo="">ADAVALE BLACKALL ROAD ADAVALE From Tuesday, November 27, 2012 08:24:00 AM </title>
      <description><![CDATA[Adavale Blackall Road, Adavale - Commencing: 27 November 2012 planned roadworks are taking place.
Short delays expected. Expected completion is 28 June 2013.

Reconstruction works are under way at various locations over 100km. ]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=333208</link>
    </item>
    <item>
      <title street="QUILPIE THARGOMINDAH ROAD" suburb="QUILPIE" dateFrom="Tuesday, November 27, 2012" timeFrom="08:22:00 AM" dateTo="" timeTo="">QUILPIE THARGOMINDAH ROAD QUILPIE From Tuesday, November 27, 2012 08:22:00 AM </title>
      <description><![CDATA[Quilpie Thargomindah Road, Quilpie - Commencing: 27 November 2012 planned roadworks are taking place.
No delays expected. Expected completion is 28th June 2013.

Reconstruction works are under way at various locations over 120km.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=333207</link>
    </item>
    <item>
      <title street="QUILPIE ADAVALE ROAD" suburb="QUILPIE" dateFrom="Tuesday, November 27, 2012" timeFrom="08:03:00 AM" dateTo="" timeTo="">QUILPIE ADAVALE ROAD QUILPIE From Tuesday, November 27, 2012 08:03:00 AM </title>
      <description><![CDATA[Quilpie Adavale Road, Quilpie - Commencing: 27 November 2012 planned roadworks are taking place Both Directions.
No delays expected. Expected completion is 28th June 2013.

Reconstruction works are under way at various locations over 85km.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=333203</link>
    </item>
    <item>
      <title street="ATHERTON HERBERTON ROAD" suburb="WONGABEL" dateFrom="Monday, November 26, 2012" timeFrom="06:00:00 AM" dateTo="" timeTo="">ATHERTON HERBERTON ROAD WONGABEL From Monday, November 26, 2012 06:00:00 AM </title>
      <description><![CDATA[Atherton Herberton Road, Wongabel - Commencing: 26 November, at 6:00am planned roadworks are taking place Both Directions.
One lane closed. Short delays expected. Changed traffic conditions. Expected completion is end June.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=330205</link>
    </item>
    <item>
      <title street="THURINGOWA DRIVE" suburb="KIRWAN" dateFrom="Wednesday, November 14, 2012" timeFrom="09:00:00 AM" dateTo="Saturday, July 20, 2013" timeTo="04:00:00 PM">THURINGOWA DRIVE KIRWAN From Wednesday, November 14, 2012 09:00:00 AM to Saturday, July 20, 2013 04:00:00 PM</title>
      <description><![CDATA[Thuringowa Drive, Kirwan - Commencing: 14 November, at 9:00am planned roadworks are taking place Northbound - Between Greenwood Drive and Dalrymple Road.
Partial lane closures. No delays expected. Proceed with caution. Expected completion is 20 July, at 4:00pm.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=420203</link>
    </item>
    <item>
      <title street="KENNEDY DEVELOPMENTAL ROAD" suburb="CORFIELD" dateFrom="Monday, November 05, 2012" timeFrom="01:44:00 PM" dateTo="Tuesday, December 31, 2013" timeTo="12:00:00 AM">KENNEDY DEVELOPMENTAL ROAD CORFIELD From Monday, November 05, 2012 01:44:00 PM to Tuesday, December 31, 2013 12:00:00 AM</title>
      <description><![CDATA[Kennedy Developmental Road, Corfield - Commencing: 05 November, at 1:44pm planned roadworks are taking place Both Directions.
No blockage. Short delays expected. Observe signage. Expected completion is 31 December, at 12:00am.

Works will be underway from November 2012 to December 2013, weather permitting. Works involve stabilising, patching and drainage repairs. Minor traffic delays may be associated with these activities.


]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=366454</link>
    </item>
    <item>
      <title street="BRUCE HIGHWAY" suburb="CALLIOPE" dateFrom="Friday, October 12, 2012" timeFrom="08:58:00 AM" dateTo="Tuesday, September 30, 2014" timeTo="12:00:00 AM">BRUCE HIGHWAY CALLIOPE From Friday, October 12, 2012 08:58:00 AM to Tuesday, September 30, 2014 12:00:00 AM</title>
      <description><![CDATA[Bruce Highway, Calliope - Commencing: 12 October, at 8:58am planned roadworks are taking place.
No blockage. Short delays expected. Observe signage. Expected completion is 30 September, at 12:00am.

The Calliope Crossroads intersection upgrade is underway at the Dawson Highway and Bruce Highway intersection.  Speed restrictions and traffic control are in place.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=311404</link>
    </item>
    <item>
      <title street="RIVERWAY DRIVE" suburb="THURINGOWA CENTRAL" dateFrom="Thursday, September 27, 2012" timeFrom="12:00:00 AM" dateTo="Thursday, August 01, 2013" timeTo="12:00:00 AM">RIVERWAY DRIVE THURINGOWA CENTRAL From Thursday, September 27, 2012 12:00:00 AM to Thursday, August 01, 2013 12:00:00 AM</title>
      <description><![CDATA[Riverway Drive, Thuringowa Central - Commencing: 27 September 2012, at 12:00am planned roadworks are taking place Southbound - 210 metres south of the Village Boulevard intersection.
No blockage. No delays expected. Observe signage. Expected completion is 01 August 2013, at 12:00am.

Installation of a temporary access to construction site. Speed restrictions in place. Please drive with caution in the area.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=304526</link>
    </item>
    <item>
      <title street="MALCOMSON STREET" suburb="NORTH MACKAY" dateFrom="Monday, September 03, 2012" timeFrom="06:00:00 AM" dateTo="Monday, September 30, 2013" timeTo="05:00:00 PM">MALCOMSON STREET NORTH MACKAY From Monday, September 03, 2012 06:00:00 AM to Monday, September 30, 2013 05:00:00 PM</title>
      <description><![CDATA[Malcomson Street, North Mackay - Commencing: 03 September, at 6:00am planned roadworks are taking place Westbound.
Partial lane closures. Short delays expected. Changed traffic conditions. Expected completion is 30 September, at 5:00pm.

Malcomson Street- Reconstruction works will recommence after 6am on Monday 7 January 2013, between Evans Avenue and Palmer Street, weather permitting. During these works two way traffic will be maintained between Glenpark Street and Palmer Street, with some lane restrictions in place as required. Access to businesses and properties will be maintained throughout the works. If you require further information, please contact the Mackay office on 4951 8555. 
]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=291297</link>
    </item>
    <item>
      <title street="QUEEN STREET" suburb="AYR" dateFrom="Friday, August 24, 2012" timeFrom="06:00:00 AM" dateTo="Tuesday, August 19, 2014" timeTo="04:00:00 PM">QUEEN STREET AYR From Friday, August 24, 2012 06:00:00 AM to Tuesday, August 19, 2014 04:00:00 PM</title>
      <description><![CDATA[Queen Street, Ayr - Commencing: 20 August 2012, at 6:00am planned roadworks are taking place - Erection and dismantling of decorations and banners between Edward Street and Young Street.
No blockage. No delays expected. Traffic control on scene. Expected completion is 19 August, at 4:00pm.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=288168</link>
    </item>
    <item>
      <title street="EIGHTH STREET" suburb="HOME HILL" dateFrom="Friday, August 24, 2012" timeFrom="06:00:00 AM" dateTo="Tuesday, August 19, 2014" timeTo="04:00:00 PM">EIGHTH STREET HOME HILL From Friday, August 24, 2012 06:00:00 AM to Tuesday, August 19, 2014 04:00:00 PM</title>
      <description><![CDATA[Eighth Street, Home Hill - Commencing: 20 August 2012, at 6:00am planned roadworks are taking place - Erections and demantling of decorations and banners between Tenth Street and Sixth Street..
No blockage. No delays expected. Traffic control on scene. Expected completion is 19 August, at 4:00pm.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=288169</link>
    </item>
    <item>
      <title street="PEAK DOWNS HIGHWAY" suburb="NEBO" dateFrom="Wednesday, August 15, 2012" timeFrom="10:20:00 AM" dateTo="Sunday, June 30, 2013" timeTo="05:00:00 PM">PEAK DOWNS HIGHWAY NEBO From Wednesday, August 15, 2012 10:20:00 AM to Sunday, June 30, 2013 05:00:00 PM</title>
      <description><![CDATA[Peak Downs Highway, Nebo - Commencing: 15 August, 2012 planned roadworks are taking place Both Directions - Between Nebo and Moranbah Access Road, as well as just east of Nebo and just west of the Moranbah Access Road.
Single lane in operation. Short delays expected. Changed traffic conditions. Expected completion is 30 June, at 5:00pm.

Peak Downs Highway - Reconstruction works are occurring on the Peak Downs Highway between Nebo and Moranbah Access Road, as well as just east of Nebo and just west of the Moranbah Access Road. Works are expected to be completed by mid 2013, weather permitting. Traffic control, single lane closures and speed restrictions will be used as required. Motorists should drive to the changed conditions and obey all signage for their own safety and the safety of roadworkers. For further information on these works, please contact the Mackay/Whitsunday region on 1300 736 754.
]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=283440</link>
    </item>
    <item>
      <title street="BRUCE HIGHWAY" suburb="BABINDA" dateFrom="Monday, July 30, 2012" timeFrom="10:40:00 AM" dateTo="" timeTo="">BRUCE HIGHWAY BABINDA From Monday, July 30, 2012 10:40:00 AM </title>
      <description><![CDATA[Bruce Highway, Babinda - Commencing: 30 July 2012, at 10:40am planned roadworks are taking place Both Directions.
Partial lane closures. Short delays expected. Observe signage. Expected completion is early August 2013.

Works are continuing on four sections of the Bruce Highway, south of Cairns. The works are to repair flood-damaged sections at Mt Sophia, Bellenden Ker, Babinda and El Arish Range. 
]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=276142</link>
    </item>
    <item>
      <title street="NEW ENGLAND HIGHWAY" suburb="HAMPTON" dateFrom="Monday, July 30, 2012" timeFrom="06:00:00 AM" dateTo="" timeTo="">NEW ENGLAND HIGHWAY HAMPTON From Monday, July 30, 2012 06:00:00 AM </title>
      <description><![CDATA[New England Highway, Hampton - Commencing: 30 July 2012, between the hours of 6:00am and 6:00pm planned roadworks are taking place Both Directions - Between Esk-Hampton Road and Lubach Road. Approximately 26km north of Toowoomba.
Single lane in operation. Medium delays expected. Changed traffic conditions. Expected completion is 31 December 2013, weather permitting.

On Site during working hours (6am-6pm): Reduced Speed Limit 40km/h, Portable Traffic Signals on site with possible delays of up to 15 minutes.

On Site During NON working hours and Overnight (6pm-6am): Reduced Speed Limit 40km/h, Portable Traffic Signals on site with possible delays of up to 15 minutes.

Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au ]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=352299</link>
    </item>
    <item>
      <title street="QUEEN STREET" suburb="AYR" dateFrom="Friday, July 27, 2012" timeFrom="07:00:00 AM" dateTo="Wednesday, July 31, 2013" timeTo="04:00:00 PM">QUEEN STREET AYR From Friday, July 27, 2012 07:00:00 AM to Wednesday, July 31, 2013 04:00:00 PM</title>
      <description><![CDATA[Queen Street, Ayr - Commencing: 27 July 2012, at 7:00am planned roadworks are taking place - Maintenance of footpath pavers - works will only be undertaken in wet weather.
No blockage. No delays expected. Expected completion is 31 July 2013, at 4:00pm.

]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=280099</link>
    </item>
    <item>
      <title street="WARREGO HIGHWAY" suburb="WITHCOTT" dateFrom="Friday, July 13, 2012" timeFrom="06:00:00 AM" dateTo="Sunday, June 30, 2013" timeTo="06:00:00 PM">WARREGO HIGHWAY WITHCOTT From Friday, July 13, 2012 06:00:00 AM to Sunday, June 30, 2013 06:00:00 PM</title>
      <description><![CDATA[Warrego Highway, Withcott - Commencing: 13 July, at 6:00am planned roadworks are taking place Both Directions.
Both lanes affected. Medium delays expected. Changed traffic conditions. Expected completion is 30 June, at 6:00pm.

Construction and resurfacing works will be carried out on the Warrego Highway between Helidon and Withcott from July 2012 until early 2013. 
Works will generally be undertaken during the day, from 6am to 6pm, Monday to Friday.  Some night works and weekend work will occur when required, 
Contra-flow and partial lane closers with traffic control will be in place. 
For more information please contact the project team on 1800 063 397 or e-mail reconstruct_metropolitan@tmr.qld.gov.au
]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=268080</link>
    </item>
    <item>
      <title street="BRUCE HIGHWAY" suburb="BAKERS CREEK" dateFrom="Monday, July 02, 2012" timeFrom="02:27:00 PM" dateTo="Thursday, October 31, 2013" timeTo="05:00:00 PM">BRUCE HIGHWAY BAKERS CREEK From Monday, July 02, 2012 02:27:00 PM to Thursday, October 31, 2013 05:00:00 PM</title>
      <description><![CDATA[Bruce Highway, Bakers Creek - Commencing: 02 July, at 2:27pm planned roadworks are taking place Both Directions - Between Temples Lane and Farrellys Road.
No delays expected. Observe signage. Expected completion is 31 October, at 5:00pm.

Bruce Highway – Roadworks are occurring along the Bruce Highway, south of Mackay between Temples Lane to Farrellys Road. Works commenced in June 2012 and are expected to be completed in late 2013, weather permitting. These works involve the duplication of the Bruce Highway between Temples Lane to Farrellys Road, installation of traffic signals at Temples Lane intersection and construction of a roundabout at the Stockroute Road intersection.   
]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=264320</link>
    </item>
    <item>
      <title street="WARREGO HIGHWAY" suburb="MITCHELL" dateFrom="Wednesday, June 06, 2012" timeFrom="05:00:00 AM" dateTo="" timeTo="">WARREGO HIGHWAY MITCHELL From Wednesday, June 06, 2012 05:00:00 AM </title>
      <description><![CDATA[Warrego Highway, Mitchell - Commencing: 06 June 2012, between the hours of 5:00am and 5:00pm planned roadworks are taking place Both Directions - Approximately 90 kilometres west of Roma.
Single lane in operation. Short delays expected. Changed traffic conditions. Expected completion is 30 October 2013, weather permitting.

On Site during working hours (5am-5pm): Reduced Speed 40km/h, Portable Traffic Signals on Scene with possible delays of up to 5 minutes can be expected.

On Site During NON working hours and Overnight(5pm-5am):Reduced Speed 40km/h, Portable Traffic Signals on Scene with possible delays of up to 5 minutes can be expected. 

Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au 
]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=222513</link>
    </item>
    <item>
      <title street="WILLS DEVELOPMENTAL ROAD" suburb="BURKETOWN" dateFrom="Monday, May 21, 2012" timeFrom="12:52:00 PM" dateTo="Friday, December 13, 2013" timeTo="06:00:00 PM">WILLS DEVELOPMENTAL ROAD BURKETOWN From Monday, May 21, 2012 12:52:00 PM to Friday, December 13, 2013 06:00:00 PM</title>
      <description><![CDATA[Wills Developmental Road, Burketown - Commencing: 21 May, at 12:52pm planned roadworks are taking place All directions.
No blockage. No delays expected. Changed traffic conditions. Expected completion is 13 December, at 6:00pm.

Motorists are advised of reduced speed limits on the Wills Developmental Road between Gregory and Burketown. Motorists are advised to observe signage. 
]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=245063</link>
    </item>
    <item>
      <title street="BRUCE HIGHWAY" suburb="PORT CURTIS" dateFrom="Monday, May 21, 2012" timeFrom="10:06:00 AM" dateTo="Friday, December 20, 2013" timeTo="07:00:00 PM">BRUCE HIGHWAY PORT CURTIS From Monday, May 21, 2012 10:06:00 AM to Friday, December 20, 2013 07:00:00 PM</title>
      <description><![CDATA[Bruce Highway, Port Curtis - Commencing: 21 May, at 10:06am planned roadworks are taking place All directions - Yeppen Roundabout.
Lane or lanes reduced. Short delays expected. Changed traffic conditions. Expected completion is 20 December, at 7:00pm.

Construction has commenced on the Yeppen North project to construct a new bridge across the Yeppen Lagoon and upgrade the Yeppen Roundabout, Jellicoe Street intersection and Port Curtis Road intersection.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=245044</link>
    </item>
    <item>
      <title street="GULF DEVELOPMENTAL ROAD" suburb="GEORGETOWN" dateFrom="Tuesday, November 22, 2011" timeFrom="12:30:00 PM" dateTo="" timeTo="">GULF DEVELOPMENTAL ROAD GEORGETOWN From Tuesday, November 22, 2011 12:30:00 PM </title>
      <description><![CDATA[Gulf Developmental Road, Georgetown - Commencing: 22 November, at 12:30pm planned roadworks are taking place.
Partial lane closures. Short delays expected. Changed traffic conditions. Expected completion is late June 2013.

Works to repair various sections of the Gulf Development Road damaged by cyclone and flooding events in 2010/11 will be carried out between 6am to 6pm, Monday to Saturday.

The Department of Transport and Main Roads (TMR) is reconstructing sections of the Gulf Developmental Road, Georgetown to Mt Surprise.

There are multiple sections of this link that are currently unsealed including the Newcastle Range. 

TMR would like to remind motorists to take extra care on the unsealed sections, particularly during wet weather, and drive to the conditions and obey all road signage.

For more information, please contact 1800 184 317 or email reconstruct_cairns@tmr.qld.gov.au For up-to-date information on traffic disruptions, please phone 13 19 40 or visit www.131940.qld.gov.au.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=201702</link>
    </item>
    <item>
      <title street="BRUCE HIGHWAY" suburb="JULAGO" dateFrom="Thursday, August 18, 2011" timeFrom="09:00:00 AM" dateTo="Monday, May 09, 2016" timeTo="05:00:00 PM">BRUCE HIGHWAY JULAGO From Thursday, August 18, 2011 09:00:00 AM to Monday, May 09, 2016 05:00:00 PM</title>
      <description><![CDATA[Bruce Highway, Julago - Commencing: 18 August, at 9:00am planned roadworks are taking place.
Unknown traffic impact. Observe signage. Expected completion is 09 May, 2016 at 5:00pm.

VARIOUS STATE CONTROLLED ROADS - PLACEMENT OF VMS BOARDS
10 AUGUST 2011 - 9 MAY 2016

The following major roads will have portable VMS boards placed on the following roads to provide community information prior to bushfire season.
FLINDERS HIGHWAY ( Roseneath)
BRUCE HIGHWAY ( Julago)
HERVEY RANGE ROAD (Kalynda Chase)
BRUCE HIGHWAY (Veales Rd to Blackriver)
FLINDERS HIGHWAY (Charters Towers)
BRUCE HIGHWAY (Ayr South)]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=280098</link>
    </item>
    <item>
      <title street="CARNARVON HIGHWAY" suburb="GUNNEWIN" dateFrom="Friday, July 08, 2011" timeFrom="02:36:00 PM" dateTo="" timeTo="">CARNARVON HIGHWAY GUNNEWIN From Friday, July 08, 2011 02:36:00 PM </title>
      <description><![CDATA[Carnarvon Highway, Gunnewin - Commencing: 08 July, at 2:36pm planned roadworks are taking place Both Directions - From Injune south to Roma in various sections.
Medium delays expected. Allow extra travel time. Expected completion is 31 June 2013.

Up to 20min delays can be expected]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=176352</link>
    </item>
    <item>
      <title street="MALENY KENILWORTH ROAD" suburb="WITTA" dateFrom="Thursday, June 23, 2011" timeFrom="12:22:00 PM" dateTo="" timeTo="">MALENY KENILWORTH ROAD WITTA From Thursday, June 23, 2011 12:22:00 PM </title>
      <description><![CDATA[Maleny Kenilworth Road, Witta - Commencing: 23 June, 2011 at 12:22pm planned roadworks are taking place.
Unknown traffic impact. Changed traffic conditions. Expected completion is to be advised.

Restoration works are being carried out due to a landslide. 

Temporary traffic signals are in place. ]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=369396</link>
    </item>
    <item>
      <title street="FITZROY DEVELOPMENT ROAD" suburb="VALKYRIE" dateFrom="Tuesday, June 21, 2011" timeFrom="03:32:00 PM" dateTo="Wednesday, July 31, 2013" timeTo="10:28:00 PM">FITZROY DEVELOPMENT ROAD VALKYRIE From Tuesday, June 21, 2011 03:32:00 PM to Wednesday, July 31, 2013 10:28:00 PM</title>
      <description><![CDATA[Fitzroy Development Road, Valkyrie - Commencing: 21 June, at 3:32pm planned roadworks are taking place.
Single lane in operation. Medium delays expected. Changed traffic conditions. Expected completion is 31 July, at 10:28pm.

Fitzroy Developmental Road - Reconstruction works are occurring on Fitzroy Developmental Road between the Middlemount turn-off and the Peak Downs Highway. The works include pavement reconstruction on various sections of road and are expected to be ongoing until mid 2013. Traffic may be restricted to single lane operation during working hours and motorists can expect some delays. For further information on these works, please contact Mackay office on 4951 8555.
]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=173360</link>
    </item>
    <item>
      <title street="WESTERN FREEWAY ON RAMP" suburb="TOOWONG" dateFrom="Thursday, March 31, 2011" timeFrom="06:30:00 AM" dateTo="Wednesday, December 31, 2014" timeTo="12:00:00 PM">WESTERN FREEWAY ON RAMP TOOWONG From Thursday, March 31, 2011 06:30:00 AM to Wednesday, December 31, 2014 12:00:00 PM</title>
      <description><![CDATA[Western Freeway On Ramp, Toowong - Commencing: 6:30am to 6:30pm, Monday to Saturday planned roadworks are taking place Both Directions - For Legacy Way construction.
No blockage. No delays expected. Observe signage. Expected completion is Late 2014.

Construction of Legacy Way (formerly Northern Link) has commenced at the western work site, on the northern side of the Western Motorway in Toowong. 

Legacy Way is a 4.6km underground toll road that will connect the Western Motorway, at Toowong, with the Inner City Bypass, at Kelvin Grove.

For more information contact the project team on 1800778772 or www.transcityjv.com.au]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=156462</link>
    </item>
    <item>
      <title street="ROMA TAROOM ROAD" suburb="EUTHULLA" dateFrom="Monday, June 07, 2010" timeFrom="06:00:00 AM" dateTo="Friday, December 28, 2012" timeTo="12:00:00 AM">ROMA TAROOM ROAD EUTHULLA From Monday, June 07, 2010 06:00:00 AM to Friday, December 28, 2012 12:00:00 AM</title>
      <description><![CDATA[Roma Taroom Road, Euthulla - Commencing: now planned roadworks are taking place Both Directions - Approximately 55km to 60km north east from the Roma turnoff.
Partial lane closures. Medium delays expected. Allow extra travel time. Expected completion is to be advised.

Delays of up to 10 minutes can be expected during construction, and delays of up to 15 minutes can be expected during sealing works.  Reduced speed limits are also in place.]]></description>
      <link>http://131940.qld.gov.au/Road-Conditions.aspx?id=93785</link>
    </item>
    <title>13 19 40 Website</title>
    <link>http://131940.qld.gov.au</link>
    <description>13 19 40 Website</description>
    <link href="/DMR.Modules/TTIEvents/RSS/RSS.aspx" rel="self" type="application/rss+xml" xmlns="http://www.w3.org/2005/Atom" />
  </channel>
</rss>