Access keys | Skip to primary navigation | Skip to secondary navigation | Skip to content | Skip to footer |
Problems viewing this site

Region's News

What's new
  • 10 Apr 2013 - Far North News

    Do you use the Kuranda Range, Gillies Range or Captain Cook Highway? The Department of Transport and Main Roads Traffic Management Centre (TMC) in Cairns has an SMS service to alert motorists when there are delays on the Kuranda Range Road, Gillies Range Road and Captain Cook Highway (from Palm Cove to Craiglie).
    Read more

Flooding and Wet Weather

What's new


For information on road conditions caused by flooding and wet weather....

Find out more

Road Conditions

The 131940 Traffic & Travel Information (TTI) website has been designed to provide road users with a real-time view of road conditions on major Queensland roads. This provides road users with a tool to make informed travel decisions.

The different types of road condition information provided on this site include:

  • traffic incidents

  • roadworks

  • special events

  • closures and load limits.

 

Route Preview close

Route is indicative only, traffic incidents are searched by suburb.

Search for Events

By Location


By Route

From:

To:

By Travel Date

Sorted By:
  • WANGETTI
    CAPTAIN COOK HIGHWAY (CAPTAIN COOK HIGHWAY SERVICE ROAD)
    03:44 AM 19/05/2013

    Captain Cook Highway, Wangetti - Hazard: Debris or vegetation Northbound - Rock slide near Rex Lookout.
    Lane or lanes reduced. Short delays expected. Proceed with caution.

Sorted By:
  • ATHERTON
    ROBERT STREET
    06:00 AM 29/04/2013

    Robert Street, Atherton - Commencing: 29 April, at 6:00am planned roadworks are taking place Both Directions.
    Partial lane closures. No delays expected. Observe signage. Expected completion is 31 May, at 6:00pm.

  • BABINDA
    BRUCE HIGHWAY
    10:40 AM 30/07/2012

    Bruce Highway, Babinda - Commencing: 30 July 2012, at 10:40am planned roadworks are taking place Both Directions.
    Partial lane closures. Short delays expected. Observe signage. Expected completion is early August 2013.

    Works are continuing on four sections of the Bruce Highway, south of Cairns. The works are to repair flood-damaged sections at Mt Sophia, Bellenden Ker, Babinda and El Arish Range.

  • BIRKALLA
    TULLY MISSION BEACH ROAD (CASSOWARY DRIVE)
    09:00 AM 15/05/2013

    Tully Mission Beach Road, Birkalla - Commencing: 20 May, at 6:30am planned roadworks are taking place All directions - Birkalla to Mission Beach - Bridge and culvert servicing works are scheduled between the intersection of Bruce Hwy and the intersection of El-Arish Mission Beach Road.
    One lane closed. Short delays expected. Proceed with caution. Expected completion is 29 June, at 5:30pm.

  • BUNGALOW
    MULGRAVE ROAD
    06:00 AM 22/05/2013

    Mulgrave Road, Bungalow - Commencing: 22 May, at 6:00am planned roadworks are taking place Inbound - Upgrade to intersection of Mulgrave & McCoombe with works day and night.
    Lane or lanes reduced. Short delays expected. Traffic control on scene. Expected completion is mid June.

  • CARDWELL
    BRUCE HIGHWAY
    07:30 AM 06/05/2013

    Bruce Highway, Cardwell - Commencing: 06 May, at 7:30am planned roadworks are taking place Both Directions.
    Lane or lanes reduced. No delays expected. Observe signage. Expected completion is 06 June, at 5:00pm.

  • DIMBULAH
    MAREEBA DIMBULAH ROAD (DIMBULAH NORMANTON ROAD)
    09:00 AM 06/05/2013

    Mareeba Dimbulah Road, Dimbulah - Commencing: 06 May, at 9:00am planned roadworks are taking place Both Directions - Hydro mulching will be taking place.
    Partial lane closures. Short delays expected. Traffic control on scene. Expected completion is 15 May, at 3:00pm.

  • EURAMO
    DAVIDSON ROAD
    12:08 PM 15/05/2013

    Davidson Road, Euramo - Commencing: 20 May, at 06:30am planned roadworks are taking place Both Directions - Euramo to Munro Plains - Bridge and culvert servicing works are scheduled between the intersection of Bruce Hwy and the Davidson Creek Bridge.
    Lane or lanes reduced. Short delays expected. Proceed with caution. Expected completion is 29 June, at 05:30pm.

  • GEORGETOWN
    GULF DEVELOPMENTAL ROAD (NORTH STREET)
    12:30 PM 22/11/2011

    Gulf Developmental Road, Georgetown - Commencing: 22 November, at 12:30pm planned roadworks are taking place.
    Partial lane closures. Short delays expected. Changed traffic conditions. Expected completion is late June 2013.

    Works to repair various sections of the Gulf Development Road damaged by cyclone and flooding events in 2010/11 will be carried out between 6am to 6pm, Monday to Saturday.

    The Department of Transport and Main Roads (TMR) is reconstructing sections of the Gulf Developmental Road, Georgetown to Mt Surprise.

    There are multiple sections of this link that are currently unsealed including the Newcastle Range.

    TMR would like to remind motorists to take extra care on the unsealed sections, particularly during wet weather, and drive to the conditions and obey all road signage.

    For more information, please contact 1800 184 317 or email reconstruct_cairns@tmr.qld.gov.au For up-to-date information on traffic disruptions, please phone 13 19 40 or visit www.131940.qld.gov.au.

  • GORDONVALE
    GORDONVALE ATHERTON ROAD (GORDONVALE ATHERTON ROAD SERVICE ROAD, RIVERSTONE ROAD)
    05:00 PM 24/04/2013

    Gordonvale Atherton Road, Gordonvale - Commencing: 24 April, at 4:00pm planned roadworks are taking place Both Directions.
    One lane closed. Short delays expected. Expected completion is 21 June, at 6:00pm.

    On Thursday 16 May, the Gillies will be under temporary traffic signals at Ross and Locke

  • LAMB RANGE
    GORDONVALE ATHERTON ROAD (GILLIES HIGHWAY)
    08:30 AM 06/05/2013

    Gordonvale Atherton Road, Lamb Range - Commencing: 06 May, at 8:30am planned roadworks are taking place Both Directions - There will be drain cleaning and extra routine maintenance between the Wet Tropics Boundary and Boar Bocket Road on the Gillies Range.
    One lane closed. Short delays expected. Traffic control on scene. Expected completion is 30 June, at 3:30pm.

  • LAURA
    PENINSULA DEVELOPMENTAL ROAD
    06:00 AM 16/04/2013

    Peninsula Developmental Road, Laura - Commencing: 16 April, at 6:00am planned roadworks are taking place Both Directions - North Laura River Bridge. General earthworks to construct new alignment at approaches to the bridge.
    Partial lane closures. Short delays expected. Observe signage. Expected completion is End of June.

  • LAURA
    PENINSULA DEVELOPMENTAL ROAD
    07:00 AM 17/03/2013

    Peninsula Developmental Road, Laura - Commencing: 17 March, at 7:00am planned roadworks are taking place Both Directions - Open upgrade at various sites along the Peninsula Development Road from Laura to Weipa.
    Partial lane closures. Short delays expected. Observe signage. Expected completion is end June 2013.

  • MACALISTER RANGE
    KENNEDY HIGHWAY
    06:58 AM 16/04/2013

    Kennedy Highway, Macalister Range - Commencing: 14 April, at 6:00am planned roadworks are taking place Both Directions - Work will continue this weekend on one section of road. for slope stabilisation.
    One lane blocked. Medium delays expected. Allow extra travel time. Expected completion is end October 2013.

    Work will continue 24 hours, Sunday 6:00am to Friday 3:00pm, until the end of October 2013, weather permitting.

    Reduced speed limits will be in place along with single lane closures and manually operated traffic lights.

    Motorists can expect delays of up to 15 minutes during the works.

    Motorists are urged to obey changed traffic conditions and allow additional travel time while these important repairs are carried out.

    For more information, please contact 1800 184 317* or email reconstruct_cairns@tmr.qld.gov.au

  • MALANDA
    MALANDA ATHERTON ROAD
    06:00 AM 22/04/2013

    Malanda Atherton Road, Malanda - Commencing: 22 April, at 6:00am planned roadworks are taking place Both Directions - Adjacent to Malanda-Atherton Rd & Upper Barron Rd. Installation of water supply scheme.
    No blockage. Short delays expected. Observe signage. Expected completion is mid August.

  • MANUNDA
    ALFRED STREET
    09:00 AM 14/05/2013

    Alfred Street, Manunda - Commencing: 14 May, at 9:00am planned roadworks are taking place All directions - There will be a Police shutdown at the intersection of Alfred and Lennon Street on 14th, 15th, 16th, 20th, 21st and 28th May between 9:00am and 3:00pm.
    Lane or lanes reduced. Short delays expected. QPS on scene. Expected completion is 28 May, at 3:00pm.

  • MAREEBA
    KENNEDY HIGHWAY (MARTIN AVENUE, MAREEBA ATHERTON ROAD)
    06:30 AM 17/05/2013

    Kennedy Highway, Mareeba - Commencing: 22 January, at 6:30am planned roadworks are taking place Both Directions - Bridge servicing to take place in various locations along the Kennedy Highway.
    Partial lane closures. Short delays expected. Changed traffic conditions. Expected completion is 31 August, at 5:30pm.

  • MAREEBA
    MAREEBA DIMBULAH ROAD
    08:00 AM 08/04/2013

    Mareeba Dimbulah Road, Mareeba - Commencing: 08 April, at 8:00am planned roadworks are taking place Both Directions - Reconstruction at various locations.
    Partial lane closures. Short delays expected. Observe signage. Expected completion is End of May.

  • MOUNT CARBINE
    MULLIGAN STREET
    06:30 AM 09/05/2013

    Mulligan Street, Mount Carbine - Commencing: 09 May, at 6:30am planned roadworks are taking place Both Directions - Emercency works on the Mulligan Highway at McLeod River Bridge.
    Lane or lanes reduced. Short delays expected. Changed traffic conditions. Expected completion is 17 May, at 5:30pm.

  • MOUNT CARBINE
    PENINSULA DEVELOPMENTAL ROAD (PENINSULA DEVELOPMENTAL ROAD)
    12:00 AM 18/03/2013

    Peninsula Developmental Road, Mount Carbine - Commencing: 18 March, at 12:00am planned roadworks are taking place Both Directions - Slope stabilisation works.
    Lane or lanes reduced. Short delays expected. Expected completion is end May.

  • PORT DOUGLAS
    PORT DOUGLAS ROAD
    06:00 AM 10/05/2013

    Port Douglas Road, Port Douglas - Commencing: 10 May, at 6:00am planned roadworks are taking place Both Directions - Pavement widening and bitumen overlay works. Approximately 10-15 minute delays may be experienced on Friday 10 May.
    Lane or lanes reduced. Medium delays expected. Allow extra travel time. Expected completion is end of May.

  • RAVENSHOE
    KENNEDY HIGHWAY
    02:07 PM 20/05/2013

    Kennedy Highway, Ravenshoe - Commencing: 20 May, at 2:07pm planned roadworks are taking place Both Directions - Between Evelyn and Ravenshoe.
    Lane or lanes reduced. Short delays expected. Observe signage. Expected completion is end January 2014.

    Pavement rehabilitation and reconstruction works to a number of sections of the Kennedy Hwy

  • SILKY OAK
    TULLY HULL ROAD
    11:06 AM 15/05/2013

    Tully Hull Road, Silky Oak - Commencing: 20 May, at 06:30am planned roadworks are taking place Both Directions - Silky Oak to Hully Heads - Bridge and culvert servicing works are scheduled between the intersection of Bruce Hwy and the intersection of Tully Heads Road.
    One lane closed. Short delays expected. Proceed with caution. Expected completion is 29 June, at 05:30pm.

  • SOUTH MISSION BEACH
    SOUTH MISSION BEACH ROAD
    06:00 AM 22/04/2013

    South Mission Beach Road, South Mission Beach - Commencing: 22 April, at 6:00am planned roadworks are taking place Both Directions - South Mission Beach turn off. Street lighting upgrade.
    Partial lane closures. No delays expected. Observe signage. Expected completion is mid May.

  • TULLY
    BRUCE HIGHWAY
    09:00 AM 15/05/2013

    Bruce Highway, Tully - Commencing: 20 May, at 9:00am planned roadworks are taking place - There is an Police shutdown at the intersection of Bruce Hwy and Butler Street for Rate 3 upgrade works.
    One lane closed. Short delays expected. QPS on scene. Expected completion is 20 May, at 3:00pm.

  • WALKAMIN
    KENNEDY HIGHWAY
    06:00 AM 22/04/2013

    Kennedy Highway, Walkamin - Commencing: 22 April, at 6:00am planned roadworks are taking place Both Directions.
    Lane or lanes reduced. No delays expected. Observe signage. Expected completion is 22 May, at 5:00pm.

    Pavement rehabilitation

  • WANGAN
    INNISFAIL JAPOON ROAD
    07:00 AM 09/05/2013

    Innisfail Japoon Road, Wangan - Commencing: 09 May, at 7:00am planned roadworks are taking place Both Directions - Approximately 760 metres south of Scheu Creek.
    Partial lane closures. Short delays expected. Traffic control on scene. Expected completion is end May.

  • WONGABEL
    ATHERTON HERBERTON ROAD
    06:00 AM 26/11/2012

    Atherton Herberton Road, Wongabel - Commencing: 26 November, at 6:00am planned roadworks are taking place Both Directions.
    One lane closed. Short delays expected. Changed traffic conditions. Expected completion is end June.

  • WRIGHTS CREEK
    BRUCE HIGHWAY
    10:00 AM 31/01/2013

    Bruce Highway, Wrights Creek - Commencing: 31 January, at 10:00am planned roadworks are taking place Both Directions.
    Partial lane closures. Short delays expected. Changed traffic conditions. Expected completion is End May.

    Construction works are continuing on the Wrights Creek Bridge. Reduced speed limits, single lane closures, traffic controllers and signage will be in place during works.

Sorted By:
  • No Special Events
Sorted By:
  • HIGHBURY
    BURKE DEVELOPMENTAL ROAD (BURKE DEVELOPMENT ROAD, NORMANTON DIMBULAH ROAD)
    24/04/2013

    Burke Developmental Road, Highbury-Tablelands Regional - Tablelands Regional Council Boundary (44 kilometres East of Dunbar) to Palmerville Rd is Subject to a 5 tonne GVM limit due to saturated pavements. Trimble's Crossing has minimal surface water over floodway as at 8am Friday 17 May. Areas of deep wheel rutting, bog holes and scouring. Maintenance grading Palmerville Road to Trimbles Crossing recommencing 20 May 2013.
    Advice: Do not drive in flood waters.
    Last Reviewed: 17 May 2013 at 08:00. Next Update: 20 May 2013.

  • LYNDHURST
    KENNEDY DEVELOPMENTAL ROAD
    29/01/2013

    Kennedy Developmental Road, Lyndhurst-Etheridge Shire - Intersection of The Lynd to Etheridge Shire Council Boundary (163 kilometres North of Hughenden)
    is Open (with caution). Road surface is rutted and rough in most locations. Please review North West region for additional road conditions.
    Advice: Do not drive in flood waters.
    Last Reviewed: 17 May 2013 at 06:00. Next Update: 20 May 2013.