-
ARATULA
CUNNINGHAM HIGHWAY
03:30 PM 16/01/2013
Cunningham Highway, Aratula - Commencing: 16 January planned roadworks are taking place Both Directions - North and south of Aratula.
Partial lane closures. Short delays expected. Observe signage. Expected completion is 30 September, at 5:00pm.
Roadworks at multiple locations between Kelly Road south and the Helipad.
Reduced speed limits will be in place 24 hrs a day. 24 hour works taking place north and south of Aratula from 12-26 May.
Heavy vehicle operators are advised that width restrictions apply at road works south of Aratula. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au
-
BEAUDESERT
WILLIAM STREET
(BEAUDESERT NERANG ROAD)
06:30 AM 10/05/2013
William Street, Beaudesert - Commencing: 10 May, at 6:30am planned roadworks are taking place Both Directions.
Lane or lanes reduced. No delays expected. Changed traffic conditions. Expected completion is 30 June, at 6:30pm.
Traffic will be temporarily diverted into the parking lanes from Tina Street to Brayford Street.
Working hours are 6:30am to 6:30pm Monday to Friday and 6:30am to 3pm on Saturdays. Some Sunday work may be required. Some night work will be required.
-
BEECHMONT
BEECHMONT ROAD
10:00 AM 13/08/2012
Beechmont Road, Beechmont - Commencing: 13 August, at 10:00am planned roadworks are taking place Both Directions - Beechmont traffic detoured to a temporary access track via Mirani Street.
Lane or lanes reduced. Short delays expected. Reduced speed limit (40km/h). Expected completion is 31 May, at 12:00am.
Beechmont Road (between Tarlington Road and Mirani Street)
This detour is required to allow widening of Beechmont Road between Tarlington Road and Mirani Street and will be in place until project completion in late May, weather permitting.
What to expect:
• Single lane traffic under traffic signals for part of the temporary access track
• Two way traffic along Mirani Street at a reduced speed of 40km/h
• Hours of work will be from 6:30am to 5pm, Monday to Saturday.
-
BEENLEIGH
PACIFIC MOTORWAY
(PACIFIC HIGHWAY, PACIFIC MOTORWAY SERVICE ROAD)
05:30 PM 23/05/2013
Pacific Motorway, Beenleigh - Commencing: 23 May, at 5:30pm planned roadworks are taking place Both Directions - The Pacific Motorway, Beenleigh North Interchange(Exit 34)off-ramp will be closed Sunday 26 May from 7pm to 5am..
All lanes affected. Short delays expected. Observe signage. Expected completion is 27 May, at 5:00am.
-
BEENLEIGH
PACIFIC MOTORWAY
(PACIFIC HIGHWAY, PACIFIC MOTORWAY SERVICE ROAD)
04:46 PM 25/02/2013
Pacific Motorway, Beenleigh - Commencing: March 2013 planned roadworks are taking place Southbound - Logan Motorway Interchange (Exit 31) to Yatala North (Exit 38)southbound.
Lane or lanes reduced. Short delays expected. Allow extra travel time. Expected completion is late August 2013.
Works will be carried out from Monday to Friday from 8pm to 5am.
Works will also be undertaken at:
- Logan Motorway Interchange (Exit 31)
- Beenleigh North Interchange (Exit 34)
- Beenleigh South Interchange (Exit 35)
-
CARBROOK
MOUNT COTTON ROAD
(MOUNT COTTON ROAD SERVICE ROAD)
06:30 AM 08/04/2013
Mount Cotton Road, Carbrook - Commencing: 08 April, at 6:30am planned roadworks are taking place All directions - Wuduru Road intersection. Continuing for 8-10 weeks.
Limited to one lane. Short delays expected. Proceed with caution. Expected completion is 21 June, at 12:00am.
-
CEDAR CREEK
BEAUDESERT BEENLEIGH ROAD
06:00 AM 27/05/2013
Beaudesert Beenleigh Road, Cedar Creek - Commencing: 20 May, at 6:00am planned roadworks are taking place Both Directions - From Tamaree Road to Shaws Pocket Road.
Limited to one lane. Unknown traffic impact. Changed traffic conditions. Expected completion is end June 2013.
-
HELENSVALE
GOLD COAST HIGHWAY
09:00 AM 02/04/2013
Gold Coast Highway, Helensvale - Commencing: 02 April, at 9:00am planned roadworks are taking place All directions - At the Discovery Drive intersection and also near Arundel Drive.
Partial lane closures. Short delays expected. Allow extra travel time. Expected completion is 02 June, at 12:00am.
Electrical works Monday to Friday 9am to 3pm and Sunday to Thursday 8pm and 5am for next 6-8 weeks
-
LOGANHOLME
PACIFIC MOTORWAY
(PACIFIC HIGHWAY, PACIFIC MOTORWAY SERVICE ROAD)
08:00 PM 26/02/2013
Pacific Motorway, Loganholme - Commencing: 26 February, at 8:00pm planned roadworks are taking place Southbound.
Lane or lanes reduced. Short delays expected. Allow extra travel time. Expected completion is 31 August, at 5:00am.
Resurfacing works will be occurring on the Pacific Motorway southbound between exits 31 to exit 38 from 8.00pm to 5.00am, from 25 February to 31 August 2013. There will be speed reductions and lane closures through work zones. For more information, contact the project team on 55969500
-
MERMAID WATERS
BERMUDA STREET
(SOUTHPORT BURLEIGH ROAD)
05:00 PM 10/05/2013
Bermuda Street, Mermaid Waters - Commencing: 10 May, at 5:00pm planned roadworks are taking place Westbound - Intersection of Bermuda Street with Christine Avenue, Cottesloe Drive and Markeri Road .
One lane closed. Short delays expected. Changed traffic conditions. Expected completion is 30 June, at 3:00pm.
The southbound slip lanes at each intersection onto Bermuda Street will be restricted. Motorists will be required to use the traffic signals to turn left turn on to Bermuda Street.
-
MIAMI
GOLD COAST HIGHWAY
(GOLD COAST HIGHWAY SERVICE ROAD)
06:00 AM 13/05/2013
Gold Coast Highway, Miami - Commencing: 13 May, at 6:00am planned roadworks are taking place Both Directions - At Bardon Avenue and Schuster Avenue.
Lane or lanes reduced. No delays expected. Changed traffic conditions. Expected completion is 30 June 2013.
On Wednesday 15 May 2013 access to the Gold Coast Highway from Bardon Avenue and Schuster Avenue will be closed.
-
MUDGEERABA
FRANKLIN DRIVE
(GOLD COAST SPRINGBROOK ROAD)
07:00 AM 13/05/2013
Franklin Drive, Mudgeeraba - Commencing: 13 May, at 7:00am planned roadworks are taking place Both Directions - At the intersections of Gold Coast-Springbrook Road and Hardys Road and Tarrant Drive.
Partial lane closures. Short delays expected. Changed traffic conditions. Expected completion is end May 2013.
Electrical work will be undertaken from Monday to Friday (some weekend work may be required):
- Day works 7am to 5pm
- Night works 7pm to 5am
-
MUTDAPILLY
CUNNINGHAM HIGHWAY
07:00 AM 22/05/2013
Cunningham Highway, Mutdapilly - Commencing: 22 May, at 7:00am planned roadworks are taking place Both Directions - Various locations between Mutdapilly and south of Warrill View.
Partial lane closures. Short delays expected. Changed traffic conditions. Expected completion is 30 August, at 12:00am.
Shoulder and embankment repairs, ahead of asphalt laying. Stop/go traffic control in place.
-
OXENFORD
MAUDSLAND ROAD
(OXENFORD COOMERA GORGE ROAD)
09:00 AM 27/05/2013
Maudsland Road, Oxenford - Commencing: 27 May, at 9:00am planned roadworks are taking place Both Directions - Near the Tamborine-Oxenford Road intersection.
Single lane in operation. Short delays expected. Allow extra travel time. Expected completion is 30 June, at 5:00pm.
Work to widen this section of Maudsland Road is part of John Muntz Causeway roadworks project.
-
OXENFORD
TAMBORINE OXENFORD ROAD
05:00 AM 11/03/2013
Tamborine Oxenford Road, Oxenford - Commencing: March 2013 planned roadworks are taking place All directions - Motorists can expect frequently changing traffic conditions and some delays at the John Muntz Causeway until early 2014.
Single lane in operation. Short delays expected. Allow extra travel time. Expected completion is early 2014.
From 27 May to late June 2013 Coomera-Gorge Road(Maudsland Road)near the intersection with Tamborine-Oxenford Road, will be single lane under stop/go traffic control from 9am to 3pm, Monday to Friday.
-
PALM BEACH
GOLD COAST HIGHWAY
(GOLD COAST HIGHWAY SERVICE ROAD, THROWER DRIVE)
08:22 PM 03/04/2013
Gold Coast Highway, Palm Beach - Commencing: 03 April, at 8:22pm planned roadworks are taking place Northbound.
Lane or lanes reduced. Short delays expected. Reduced speed limit (40km/h). Expected completion is 07 June, at 3:00am.
Pavement repairs
-
SLACKS CREEK
PACIFIC HIGHWAY
(PACIFIC HIGHWAY SERVICE ROAD, PACIFIC HIGHWAY SERVICE ROAD OFF RAMP)
10:00 PM 26/05/2013
Pacific Highway, Slacks Creek - Commencing: 26 May, at 10:00pm planned roadworks are taking place Southbound.
Both lanes affected. Short delays expected. Use alternative route. Expected completion is 27 May, at 5:00am.
Construction works will commence at the Pacific Motorway, southbound, Winnets Road (Exit 24) on and off-ramp, Slacks Creek on Sunday 26 May 2013 from 8pm until 5am Monday 27 May 2013.
Traffic will be detoured via Old Chatswood Road.
-
SLACKS CREEK
PARADISE ROAD
(SPRINGWOOD CONNECTION ROAD, MABEL PARK SCHOOL ACCESS)
01:01 PM 14/05/2013
Paradise Road, Slacks Creek - Commencing: 14 May, at 1:01pm planned roadworks are taking place All directions - Road works at the Paradise Road roundabout are continuing. Motorists should expect a reduction in speed to 40km/h and single lane closures between 9am and 3pm. .
Partial lane closures. Short delays expected. Changed traffic conditions. Expected completion is 30 September, at 5:00pm.
For more information call the construction team on 0418 495 367 (business hours only).
-
SLACKS CREEK
PARADISE ROAD
(SPRINGWOOD CONNECTION ROAD, MABEL PARK SCHOOL ACCESS)
05:30 PM 08/05/2013
Paradise Road, Slacks Creek - Commencing: 08 May, at 5:30pm planned roadworks are taking place All directions.
Partial lane closures. Short delays expected. Changed traffic conditions. Expected completion is 31 July, at 5:00am.
The three slip lanes at the Paradise Road roundabout will close from 5am Thursday 9 May 2013.
Motorists are required to use the roundabout as an alternative to the slip lanes.
-
SOUTH MACLEAN
MOUNT LINDESAY HIGHWAY
(MOUNT LINDESAY HIGHWAY SERVICE ROAD)
07:00 AM 03/05/2013
Mount Lindesay Highway, South Maclean - Commencing: 03 May, at 7:00am planned roadworks are taking place Both Directions - At the Stockleigh Road intersection .
Partial lane closures. Unknown traffic impact. Changed traffic conditions. Expected completion is 24 May, at 5:00pm.
Electrical work will be undertaken between 7am to 5pm Monday to Friday (some weekend work may be required).
-
SOUTHPORT
FERRY ROAD
(SOUTHPORT BURLEIGH ROAD)
07:00 PM 05/05/2013
Ferry Road, Southport - Commencing: 05 May, at 7:00pm planned roadworks are taking place Northbound - Between Benowa Road and Deauville Drive for the next 6-8 weeks.
Partial lane closures. Short delays expected. Allow extra travel time. Expected completion is 05 July, at 12:30am.
Changed traffic conditions will be in place 24/7
-
SPRINGWOOD
PACIFIC MOTORWAY
(PACIFIC HIGHWAY, SOUTH EAST FREEWAY)
06:24 PM 14/05/2013
Pacific Motorway, Springwood - Commencing: 14 May, at 6:24pm planned roadworks are taking place Both Directions.
No blockage. No delays expected. Changed traffic conditions. Expected completion is 01 December, at 5:00pm.
Construction works are currently underway on the Pacific Motorway at Springwood. Traffic has been reduced to 80km through the site. Night works will be undertaken intermittently throughout the duration of the project. Traffic impacts will involve reduced lanes and speed during night works. The expected completion time for the project is late 2013. For more information contact the project team on 0418495367.
-
SPRINGWOOD
PACIFIC MOTORWAY
(PACIFIC HIGHWAY, SOUTH EAST FREEWAY)
03:52 PM 13/05/2013
Pacific Motorway, Springwood - Commencing: Mid-April 2013 planned roadworks are taking place Both Directions - Between Fitzgerald Avenue to Shortland Street.
No blockage. No delays expected. Changed traffic conditions. Expected completion is late 2013.
Construction works are currently underway on the Pacific Motorway at Springwood. Traffic has been reduced to 80km through the site. Night works will be undertaken intermittently throughout the duration of the project. Traffic impacts will involved reduced lanes and speed during night works. The expected completion time for the project is late 2013.
For more information, contact the project team on 0418 495 367.
-
TAMBORINE
WATERFORD TAMBORINE ROAD
(WATERFORD TAMBORINE ROAD SERVICE ROAD)
12:00 AM 27/05/2013
Waterford Tamborine Road, Tamborine - Commencing: 27 May planned roadworks are taking place Both Directions - Between Stegemann Road and Tamborine Village roundabout.
Lane or lanes reduced. No delays expected. Changed traffic conditions. Expected completion is end June 2013.
-
TAMBORINE
BEAUDESERT BEENLEIGH ROAD
09:12 AM 20/03/2013
Beaudesert Beenleigh Road, Tamborine - Commencing: 20 March planned roadworks are taking place All directions.
Lane or lanes reduced. Medium delays expected. Allow extra travel time. Expected completion is late May 2013.
Construction of the pavement surface for the new roundabout at the intersection of Beaudesert-Beenleigh Road and Waterford Tamborine Road
-
TUGUN
PACIFIC MOTORWAY
(TUGUN BYPASS, EXIT 95)
09:00 AM 27/05/2013
Pacific Motorway, Tugun - Commencing: 27 May, at 9:00am planned roadworks are taking place Both Directions.
All lanes affected. Short delays expected. Reduced speed limit (60km/h). Expected completion is 31 May, at 4:00pm.
Motorists will have reduced speed limits to 60km/h at various locations along the Tugun Bypass from Monday 27 May until Friday 31 May. The southbound lanes will have speed reductions between 9am and 3pm and the northbound lanes between 10am and 4pm.
-
TUGUN
PACIFIC MOTORWAY
(TUGUN BYPASS, EXIT 95)
10:29 AM 23/05/2013
Pacific Motorway, Tugun - Commencing: 23 May, at 10:29am planned roadworks are taking place Southbound - 1km south of the Stewart Road on ramp.
Lane or lanes reduced. No delays expected. Observe signage. Expected completion is 31 July, at 12:00am.
Landslip repairs taking place.
-
TUGUN
GOLD COAST HIGHWAY
(GOLD COAST HIGHWAY EXIT)
06:30 AM 16/05/2013
Gold Coast Highway, Tugun - Commencing: 16 May, at 6:30am planned roadworks are taking place Both Directions - At Sand Street.
Lane or lanes reduced. Unknown traffic impact. Changed traffic conditions. Expected completion is 31 May, at 5:00pm.
This work is required to install pedestrian fencing 100 metres either side of the signalised mid-block pedestrian crossing at Sand Street, Tugun.
-
YATALA
PACIFIC MOTORWAY
(PACIFIC HIGHWAY)
07:00 PM 24/05/2013
Pacific Motorway, Yatala - Commencing: 24 May, at 7:00pm planned roadworks are taking place All directions - Yatala South Interchange (Exit 41) including the eastern and western roundabout, on and off-ramps and the M1 overpass.
Lane or lanes reduced. Short delays expected. Observe signage. Expected completion is 17 July, at 5:00am.
These works will commence tonight, Friday 24 May 2013 from 7pm until 5am and continue intermittently between 8pm and 5am until mid July 2013.
-
YATALA
PACIFIC MOTORWAY ON RAMP
(PACIFIC HIGHWAY)
05:03 PM 15/05/2013
Pacific Motorway On Ramp, Yatala - Commencing: 15 May, at 5:03pm planned roadworks are taking place All directions - Pavement repairs at Yatala South Interchange (Exit 41) and Yatala North Interchange (Exit 38) until the end of June 2013 .
Partial lane closures. Short delays expected. Changed traffic conditions. Expected completion is 30 June, at 12:00am.
-
YATALA
PACIFIC MOTORWAY
(PACIFIC HIGHWAY)
08:00 PM 07/05/2013
Pacific Motorway, Yatala - Commencing: 07 May, at 8:00pm planned roadworks are taking place Northbound - Nightly from 8pm until 5am until late September 2013.
M1 (northbound) from Yatala North (Exit 38) to the Logan Motorway Interchange, Beenleigh.
Partial lane closures. Short delays expected. Changed traffic conditions. Expected completion is 30 September, at 5:00am.