Access keys | Skip to primary navigation | Skip to secondary navigation | Skip to content | Skip to footer
Problems viewing this site

Event information

Sorted By:
  • Hume Highway

    Holbrook

    Single Vehicle Crash Northbound.
    - 15km south of Holbrook
    Reduce speed Exercise caution
    Last edited: 06 Jul 2015
    Information provided by Transport for NSW.

  • Great Western Highway

    Lawson

    Single Vehicle Crash .
    at Orient Street
    Exercise caution
    Last edited: 06 Jul 2015
    Information provided by Transport for NSW.

  • Great Western Highway

    Lawson

    Single Vehicle Crash Westbound.
    at Orient Street
    Exercise caution
    Last edited: 06 Jul 2015
    Information provided by Transport for NSW.

  • OXLEY ROAD

    OXLEY

    Potholes or road surface damage Hazard Northbound
    At Ellen Street.
    No delays expected. Proceed with caution.
    Last edited: 06 Jul 2015 18:22
    Information provided by Department of Transport and Main Roads.

  • HAWTHORNE ROAD

    HAWTHORNE

    Infrastructure damage Hazard Northbound
    Between Elliott Street and Barton Road.
    Partial lane closures
    No delays expected. Proceed with caution.
    Last edited: 06 Jul 2015 16:04
    Information provided by Department of Transport and Main Roads.

  • PALMERSTON HIGHWAY

    WOOROONOORAN

    Potholes or road surface damage Hazard Both Directions
    Vicinity of Henrietta Creek Rest Area.
    All lanes affected
    Unknown traffic impact. Proceed with caution.
    Last edited: 30 Jun 2015 16:07
    Information provided by Department of Transport and Main Roads.

  • WILLS DEVELOPMENTAL ROAD

    GREGORY

    Infrastructure damage Hazard Both Directions
    No blockage
    No delays expected. Reduced speed limit (40km/h).
    Motorists are advised there are two damaged cattle grids on the Wills Developmental Road between Gregory and Burketown.
    Reduced speed limit oto 40 km/hr. Please drive with caution and obey all signage.
    Last edited: 25 Jun 2015 11:46
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    PORT CURTIS

    Congestion Both Directions
    Yeppen South Project between Burnett Highway intersection at Egan's Hill and the Yeppen Roundabout (south of Rockhampton).
    All lanes affected
    Delays expected. Allow extra travel time.
    Intermittment delays will be experienced between 9am and 1pm weekdays due to between two to four road closures per day to transport girders to construction site. Stop-Go traffic control on site, maximum closure of 10 minutes each movement. Commencing Friday 24 April 2015.
    Last edited: 25 Jun 2015 11:41
    Information provided by Department of Transport and Main Roads.

  • DAWSON DEVELOPMENTAL ROAD

    SPRINGSURE

    Potholes or road surface damage Hazard Both Directions
    Unsealed road between Springsure and Tambo is suitable for high clearance vehicles only.
    No blockage
    No delays expected. Use alternative route.
    Large bull dust holes and surface damage.
    Last edited: 25 Jun 2015 11:40
    Information provided by Department of Transport and Main Roads.

  • MALANDA MILLAA MILLAA ROAD

    MILLAA MILLAA

    Potholes or road surface damage Hazard
    Restoration works are underway for road shoulder slip in vicinity of Gillies Avenue. Travel with care.
    One lane closed
    Delays expected. Changed traffic conditions.
    Last edited: 25 Jun 2015 11:38
    Information provided by Department of Transport and Main Roads.

  • WARREGO HIGHWAY

    COLLEGE VIEW

    Potholes or road surface damage Hazard Eastbound
    Road Surface Damage at Moroney Road.
    No delays expected. Reduced speed limit (80km/h).
    Last edited: 25 Jun 2015 11:33
    Information provided by Department of Transport and Main Roads.

  • Various roads

    Central Darling Shire

    Flooding Hazard .
    -
    Check signage Exercise caution The following roads in the Central Darling Shire are closed or affected by flooding:

    Menindee to Pooncarie - closed;
    Menindee to Wilcannia (east side) - closed;

    For more information please contact the 24-hour road information line on (08) 8091 5155.

    Last edited: 02 Jul 2015
    Information provided by Transport for NSW.

  • Various roads

    Unincorporated Area of Far Western Region (Broken Hill)

    Flooding Hazard Both directions.
    at
    Exercise caution Check signage The following regional roads are affected:
    The Cut Line (Tibooburra to Borrona Downs) - open with caution to 4WD only;
    The Cut Line (Borrona Downs to Wanaaring) - open with caution to 4WD only;

    A number of local roads are also closed or affected by flooding. Please call (08) 8082 6660 for a 24hr recorded road condition report.

    Last edited: 02 Jul 2015
    Information provided by Transport for NSW.

  • TAMBO ROAD

    ALPHA

    Open (with caution)
    Last edited: 26 Jun 2015 09:06
    Next update:as conditions change
    Information provided by Department of Transport and Main Roads.

  • BLACKALL JERICHO ROAD

    BLACKALL

    Open (with caution)
    proceed with caution.
    Last edited: 26 Jun 2015 09:06
    Next update:as conditions change
    Information provided by Department of Transport and Main Roads.

  • TAMBO ROAD

    ALPHA

    Restricted to four wheel drive vehicles only
    Last edited: 26 Jun 2015 09:06
    Next update:as conditions change
    Information provided by Department of Transport and Main Roads.

  • DAWSON DEVELOPMENTAL ROAD

    TAMBO

    Restricted to four wheel drive vehicles only
    Last edited: 26 Jun 2015 09:06
    Next update:as conditions change
    Information provided by Department of Transport and Main Roads.

  • BLACKALL ADAVALE ROAD

    BLACKALL

    Restricted to four wheel drive vehicles only
    Last edited: 26 Jun 2015 09:06
    Next update:as conditions change
    Information provided by Department of Transport and Main Roads.

  • CRAMSIE MUTTABURRA ROAD

    LONGREACH

    Restricted to four wheel drive vehicles only
    Caution on detour.Last edited: 26 Jun 2015 09:06
    Next update:as conditions change
    Information provided by Department of Transport and Main Roads.

  • ILFRACOMBE ARAMAC ROAD

    ARAMAC

    Closed to all vehicles
    Last edited: 26 Jun 2015 09:06
    Next update:as conditions change
    Information provided by Department of Transport and Main Roads.

  • CLERMONT ROAD

    ALPHA

    Closed to all vehicles
    Closed at Native Companion Creek sidetrack.Last edited: 26 Jun 2015 09:06
    Next update:as conditions change
    Information provided by Department of Transport and Main Roads.

  • HUGHENDEN MUTTABURRA ROAD

    HUGHENDEN

    Hughenden - Muttaburra
    Open (with caution)
    Observe signage.
    Drive with caution, rough surface in some sections due to Flood Damage
    Last edited: 30 Jun 2015 14:14
    Next Update: 03 Jul 2015

    Information provided by Department of Transport and Main Roads.

  • TORRENS CREEK ARAMAC ROAD

    TORRENS CREEK

    Aramac - Torrens Creek

    Open (with caution)
    Observe signage.
    “OPEN WITH CARE”
    Drive with caution, rough surface in some sections due to flood damage
    Last edited: 30 Jun 2015 14:13
    Next Update: 03 Jul 2015

    Information provided by Department of Transport and Main Roads.

  • PALMWOODS MONTVILLE ROAD

    PALMWOODS

    Reduced to one lane due to slippage between McDonalds Rd and Montville Road. Traffic signals in place top and bottom of range
    Open (with caution)
    Reduced speed limit (40Km/h).
    Last edited: 03 Jul 2015 09:55
    Next Update: 06 Jul 2015

    Information provided by Department of Transport and Main Roads.

  • KENNEDY DEVELOPMENTAL ROAD

    HUGHENDEN

    Hughenden - Flinders Shire Boundary
    Open (with caution)
    Observe signage.
    “OPEN WITH CARE”
    Drive with caution, rough surface in some sections due to flood damage
    Last edited: 30 Jun 2015 14:13
    Next Update: 03 Jul 2015

    Information provided by Department of Transport and Main Roads.

  • ENDEAVOUR VALLEY ROAD

    COOKTOWN

    Isabella Creek and other creeks and crossings.
    Open (with caution)
    proceed with caution.
    Last edited: 06 Jul 2015 07:37
    Next update:as conditions change
    Information provided by Department of Transport and Main Roads.

  • GREGORY DEVELOPMENTAL ROAD

    EINASLEIGH

    The Lynd to Einasleigh
    Open (with caution)
    proceed with caution.
    Last edited: 06 Jul 2015 07:37
    Next update:as conditions change
    Information provided by Department of Transport and Main Roads.

  • PENINSULA DEVELOPMENTAL ROAD

    LAURA

    Laura to Coen
    Open (with caution)
    proceed with caution.
    Last edited: 06 Jul 2015 07:37
    Next update:as conditions change
    Information provided by Department of Transport and Main Roads.

  • PENINSULA DEVELOPMENTAL ROAD

    COEN

    Coen Airport to Weipa
    Open (with caution)
    do not drive in flood waters.
    Last edited: 06 Jul 2015 07:37
    Next update:as conditions change
    Information provided by Department of Transport and Main Roads.

  • BURKE DEVELOPMENTAL ROAD

    HOWITT

    Walkers creek to Mareeba shire/Tablelands regional boundary
    Restricted to four wheel drive vehicles only
    Proceed with caution.
    Please take extreme care when travelling, due to sections of road damaged from washouts
    Last edited: 02 Jul 2015 16:13
    Next Update: 05 Jul 2015

    Information provided by Department of Transport and Main Roads.

  • BURKE DEVELOPMENTAL ROAD

    HIGHBURY

    40 km east of Dunbar to Mungana turnoff
    Open (with caution)
    do not drive in flood waters.
    Last edited: 06 Jul 2015 07:37
    Next update:as conditions change
    Information provided by Department of Transport and Main Roads.

  • RICHMOND WINTON ROAD

    KYNUNA

    Open (with caution)
    proceed with caution.
    .Last edited: 26 Jun 2015 09:06
    Next update:as conditions change
    Information provided by Department of Transport and Main Roads.

  • MONTO MOUNT PERRY ROAD

    YARROL

    at the Burnett River Bridge
    Closed to all vehicles
    Use alternative route.
    Last edited: 03 Jul 2015 09:21
    Next Update: When condition change.

    Information provided by Department of Transport and Main Roads.

  • KENNEDY HIGHWAY

    UPPER BARRON

    21km from Atherton
    Open (with caution)
    Reduced lanes due to land slip.Last edited: 06 Jul 2015 07:37
    Next update:as conditions change
    Information provided by Department of Transport and Main Roads.

  • KENNEDY DEVELOPMENTAL ROAD

    HUGHENDEN

    Hughenden - Winton


    Open (with caution)
    Observe signage.
    Drive with caution, rough surface in some sections due to Flood Damage
    Last edited: 30 Jun 2015 14:13
    Next Update: 03 Jul 2015

    Information provided by Department of Transport and Main Roads.

  • MAHON ROAD

    COOMINYA


    Closed to all vehicles
    use alternative route.

    Last edited: 16 Jun 2015
    Next update:14 Jun 2016 Information provided by Somerset Regional Council via QIT+

  • MULGRAVE ROAD

    PARRAMATTA PARK

    Between Buchan St and Severin St. Buses Excepted.
    Subject to a 25 tonne GVM limit
    Due to road works for drain replacement under the road, a 25 tonne load limit has been placed on Mulgrave Rd between Buchan St and Aumuller St Buses are excepted Rough surface, speed reduction and changed traffic conditions.Last edited: 06 Jul 2015 07:37
    Next update:as conditions change
    Information provided by Department of Transport and Main Roads.

  • OBI OBI ROAD

    OBI OBI

    Subject to a 10 tonne GVM limit
    Observe signage.
    Obi Obi Road, Obi Obi – The downhill section of Obi Obi Road westbound between Mapleton and Kenilworth is open to traffic.
    Last edited: 03 Jul 2015 10:00
    Next Update: 31 Jul 2015

    Information provided by Department of Transport and Main Roads.

Sorted By:
  • BRUCE HIGHWAY

    ALLIGATOR CREEK

    Planned Roadworks Both Directions
    Light installation works at the intersection of Tindal Court.
    Commencing: 16 June 2015, at 6:00am
    Concluding:31 July 2015, at 6:00pm
    Partial lane closures
    No delays expected. Proceed with caution.
    Last edited: 03 Jul 2015 12:17
    Information provided by Department of Transport and Main Roads.

  • BRISBANE ROAD

    ARUNDEL

    Planned Roadworks Eastbound
    Night time lane closures near the intersection of Arundel Drive.
    Commencing: 05 June 2015, at 7:30pm
    Concluding:early July
    Lane or lanes reduced
    No delays expected. Changed traffic conditions.
    Last edited: 11 Jun 2015 14:51
    Information provided by Department of Transport and Main Roads.

  • GYMPIE ROAD

    ASPLEY

    Planned Roadworks Southbound
    Gympie Road, Aspley.
    Commencing: 15 June 2015, at 7:00pm
    Concluding:31 July 2015, at 5:30am
    Road closed single direction
    No delays expected. Observe signage.
    Monday 25th June - Asphalt Gympie Rd & Robinson Rd
    Thursday 18th June - Asphalt Gympie Rd & Robinson Rd
    Monday 16th - 21th July - Calcine Bauxite Treatment Gympie Rd & Robinson Rd
    Thursday 22nd July - Line Marking Gympie Rd & Robinson Rd
    #124
    Last edited: 15 Jun 2015 13:01
    Information provided by Department of Transport and Main Roads.

  • GYMPIE ROAD

    ASPLEY

    Planned Roadworks Southbound
    Including Albany Creek road.
    Commencing: 15 June 2015, at 7:00pm
    Concluding:31 July 2015, at 5:30am
    Both lanes affected
    No delays expected. Observe signage.
    Monday 19th June - Asphalt Gympie Rd & Albany Creek Rd
    Thursday 18th June - Asphalt Gympie Rd & Albany Creek Rd
    Monday 22nd - 28th July - Calcine Bauxite Treatment Gympie Rd and Albany Creek Rd
    Thursday 29th July - Line marking Gympie Rd and Albany Creek Rd
    Last edited: 15 Jun 2015 13:21
    Information provided by Department of Transport and Main Roads.

  • CHRISTENSENS ROAD

    BALBERRA

    Planned Roadworks Both Directions
    Commencing: 20 May 2015, at 12:35pm
    Concluding:30 June 2015, at 12:00am
    Partial lane closures
    Delays expected. Changed traffic conditions.
    Last edited: 20 May 2015 12:35
    Information provided by Department of Transport and Main Roads.

  • BINNA BURRA ROAD

    BEECHMONT

    Planned Roadworks Both Directions
    Commencing: late June 2015
    Concluding:early July 2015
    Partial lane closures
    Delays expected. Changed traffic conditions.
    Last edited: 19 Jun 2015 16:39
    Information provided by Department of Transport and Main Roads.

  • BUNDOCK STREET

    BELGIAN GARDENS

    Planned Roadworks Both Directions
    Commencing: 19 June 2015, at 5:03pm
    Concluding:15 October 2015, at 5:00pm
    No blockage
    Delays expected. Observe signage.
    Last edited: 03 Jul 2015 12:18
    Information provided by Department of Transport and Main Roads.

  • DAGUILAR HIGHWAY

    BLACKBUTT

    Planned Roadworks Both Directions
    Between Reservoir Service Road and Sutton Street.
    .
    Commencing: End June 2015, weather permitting
    Concluding:in August 2015, weather permitting
    Partial lane closures
    Delays expected. Allow extra travel time.
    Works will generally be undertaken between 6am and 6pm. Motorists should expect changed conditions and observe all safety signage.
    Last edited: 22 Jun 2015 15:52
    Information provided by Department of Transport and Main Roads.

  • THE RING ROAD

    BOHLE PLAINS

    Planned Roadworks Both Directions
    Townsville Ring Road Section 4
    From Kalynda Chase intersection to Mt Low intersection of the Bruce Highway
    .
    Commencing: 07 May 2015, at 10:30am
    Concluding:31 May 2017, at 12:00am
    No blockage
    No delays expected. Changed traffic conditions.
    Motorists are advised there will be increased heavy vehicles in the vicinity of Kalynda Parade and Dalrymple Road for the duration of this project which is expected to be completed by mid 2017.
    Survey works will commence from 6 June 2015 between Veales Road to the overtaking lanes just south of the Black River Bridge.
    Last edited: 03 Jul 2015 14:14
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    BOOYAL

    Planned Roadworks Both Directions
    Duingal Bridge on the Bruce Highway just south of the Booyal-Dallarnil Road intersection will be closed to ALL excess dimension vehicles over 3.5m in width .
    Commencing: Tuesday 7 July
    Concluding:17 July 2015
    Delays expected. Use alternative route.
    Duingal Bridge on the Bruce Highway just south of the Booyal-Dallarnil Road intersection will be closed to ALL excess dimension vehicles over 3.5m in width between 6am and 6pm daily.
    Alternatate Route Southbound - Bruce Highway, Booyal-Dallarnil Road, Isis Highway, Burnett Highway, Wide Bay Highway, Bruce Highway.
    Alternatate Route Northbound - Bruce Highway, Wide Bay Highway, Burnett Highway, Isia Highway, Booyal-Dallarnil Road, Bruce Highway
    Last edited: 29 Jun 2015 16:17
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    CARDWELL

    Planned Roadworks Both Directions
    Approx 1km south of Five Mile Creek Bridge.
    Commencing: in progress
    Concluding:August 2015
    Lane or lanes reduced
    Unknown traffic impact. Changed traffic conditions.
    Available width 3.5 metres
    Last edited: 06 Jul 2015 10:03
    Information provided by Department of Transport and Main Roads.

  • MITCHELL HIGHWAY

    CHARLEVILLE

    Planned Roadworks Both Directions
    Construction of Angellala Creek Bridge, approximately 30km south of Charleville.
    Commencing: 18 May 2015, between the hours of 6:00am and 6:00pm, 7 days a week.
    Concluding: 20 October 2015, weather permitting.
    No blockage
    No delays expected. Proceed with caution.

    On site During work hours: Reduced speed 40km/hr, No blockage, constuction is isolated from traffic via a Sidetrack, no delays.

    On site After work hours: Reduced speed 60km/hr, No blockage, constuction is isolated from traffic via a Sidetrack, no delays.

    Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au

    Last edited: 28 May 2015 11:13
    Information provided by Department of Transport and Main Roads.

  • GYMPIE ROAD

    CHERMSIDE

    Planned Roadworks Southbound
    Gympie Road Chermside.
    Commencing: 15 June 2015, at 7:00pm
    Concluding:31 July 2015, at 5:30am
    Road closed single direction
    No delays expected. Observe signage.
    Tuesday 16th - Thursday 24th June - Calcine Bauxite Treatment
    Gympie Rd & Webster Rd
    Thursday 18th June - Asphalt Gympie Rd & Webster Rd
    Monday 13th - 15th July Calcine Bauxite Treatment Gympie Rd &
    Webster Rd
    #125
    Thursday 16th July - Line Marking Gympie Rd & Webster Rd
    Last edited: 15 Jun 2015 12:59
    Information provided by Department of Transport and Main Roads.

  • GYMPIE ROAD

    CHERMSIDE

    Planned Roadworks Both Directions
    Gympie Road and Webster Road intersection, Chermside
    Gympie Road and Albany Creek Road intersection, Aspley.
    Commencing: 09 June 2015, at 7:30am
    Concluding:31 July 2015, at 5:00am
    Partial lane closures
    Delays expected. Changed traffic conditions.
    The Department of Transport and Main Roads will be applying new layers of asphalt and a non-skid coating in selected sections of inbound and outbound lanes of Gympie Road between the intersection of Gympie Road with Webster Road, Chermside and the intersection of Gympie Road with Albany Creek Road, Aspley.
    What to expect:
    temporary traffic control
    single lane closures
    reduced speed limits.
    Be prepared for slight delays on occasions.
    The work will benefit safety at these locations by providing an improved road surface which is more resistant to skidding, as well as enhanced line marking. Advance warning signals will also be installed to alert inbound motorists to the status of the signals at Webster Road.
    For more information during the works, contact Mr Pinak Dholakia on phone 0423 844 157 or for general enquiries, phone 1800 045 348, email: metropolitanregion@tmr.qld.gov.au.
    #119
    Last edited: 09 Jun 2015 13:28
    Information provided by Department of Transport and Main Roads.

  • ALLAWAH ROAD

    CHUWAR

    Planned Roadworks Both Directions
    Mount Crosby Weir Bridge - changed traffic conditions.
    Commencing: 25 May 2015, at 9:39am
    Concluding:25 May 2017, at 6:00am
    No blockage
    No delays expected. Changed traffic conditions.
    •Traffic conditions along the Mount Crosby Weir Bridge will change from May 2015 as a precaution for the community in the interest of safety.
    •A 9 tonne weight limit has been imposed on Mount Crosby Weir Bridge from 2 May 2015.
    •The weight limit and 20kph speed limit for the bridge are required to protect public safety.
    •Exceptions to the weight limit and speed cannot be made.
    •Any vehicle that exceeds the 9 tonne weight limit should consider an alternative route.
    •Changes to signage will be installed to inform the local community of these changes.
    #106
    Last edited: 25 May 2015 09:42
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    COOROY

    Planned Roadworks Both Directions
    Cooroy to Federal (including Black Mountain).
    Commencing: 20 March 2015, at 7:25pm
    Concluding:31 July 2015, at 12:00pm
    Delays expected. Proceed with caution.

    Cudgerie Drive to Sankeys Road
    From 1 March 2015, Bruce Highway traffic diverted onto the new highway lanes between Cudgerie Drive and Black Mountain Range Road, with an 80km/h speed limit in place. The northbound passing lane near Black Mountain Range Road has been partially closed as part of this switch. From April 2015 until late 2015, southbound traffic exiting to Cooroy and Noosa (Exit 230A) is being diverted from the new highway lanes via a side track to Elm Street.

    Cooroy southern interchange to Cudgerie Drive
    Night works will occur on the Bruce Highway between the Bagnalls Road overpass and Elm Street from Sunday 5 July for five nights, weather permitting. Stop/go traffic control will be required between 8pm and 5am. Motorists may experience minor delays.
    The speed limit has been reduced through the Cooroy southern interchange to 70km/h, and just north of the interchange to 80km/h. Motorists may experience minor delays. Traffic changes are in place around the Cooroy southern interchange connection road including single lane closures, signage, traffic controllers and stop-go operations until late 2015. Bridge deck installation for the new Cooroy southern interchange off-ramp has temporarily reduced the clearance height to 5.0m until late 2015.

    From January 2015, northbound highway traffic will share the southbound highway lanes for approximately 1km just south of the Cooroy southern interchange, with single northbound and southbound traffic lanes in operation.

    Vehicles wider than 4m should observe the requirements of their over dimensional permits along this section of the highway. An alternative route is available via the Eumundi exit of the Bruce Highway in the south and Pomona Connection Road in the north. Cooroy can then be reached via the old highway (Eumundi Range Road/Nandroya Road/Myall Street) and Pomona can be reached via Elm Street and Yurol Forest Drive. Please note a maximum 5.0m ground contact width northbound and southbound.

    More details are available on TMR’s Conditions of Operation database at www.tmr.qld.gov.au. Proceed with caution.

    Last edited: 02 Jul 2015 13:29
    Information provided by Department of Transport and Main Roads.

  • WARREGO HIGHWAY

    COTSWOLD HILLS

    Planned Roadworks Both Directions
    From Nugent Pinch Road through to Charlton
    .
    Commencing: 23 February 2015 at 6.00am
    Concluding: 30 June 2016 at 6.00pm weather permitting.
    All lanes affected
    Delays expected. Changed traffic conditions.

    Work Hours: 6 days a week, minor detours and sidetracks in place, reduced speed to 60km/h, portable signals, delays up to 15 minutes and traffic control

    After Hours: Minor detours and sidetracks, reduced speed to 80km/h, portable signals.


    Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au
    Last edited: 06 May 2015 06:44
    Information provided by Department of Transport and Main Roads.

  • PROSTON BOONDOOMA ROAD

    COVERTY

    Planned Roadworks Both Directions
    Between Glencoe Road and Fletchers Road.
    Commencing: early July 2015
    Concluding:Early 2016
    Partial lane closures
    Delays expected. Allow extra travel time.
    Last edited: 24 Jun 2015 11:00
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    COWLEY

    Planned Roadworks Both Directions
    1km north of Liverpool Creek.
    Commencing: in progress
    Concluding:August 2015
    Lane or lanes reduced
    Unknown traffic impact. Changed traffic conditions.
    Available width 3.5 metres
    Last edited: 06 Jul 2015 10:04
    Information provided by Department of Transport and Main Roads.

  • CURRUMBIN CREEK ROAD

    CURRUMBIN WATERS

    Planned Roadworks Both Directions
    Between Bienvenue Drive and Piggabeen Road.
    Commencing: mid-June 2015
    Concluding:end-June 2015
    Partial lane closures
    No delays expected. Allow extra travel time.
    Last edited: 09 Jun 2015 12:17
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    DEERAGUN

    Planned Roadworks
    Slashing of road reserve on various State-controlled roads.
    Commencing: 27 October 2014, at 6:00am
    Concluding:27 October 2015, at 6:00pm
    No blockage
    No delays expected. Observe signage.
    Last edited: 03 Jul 2015 12:13
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    DUCKINWILLA

    Planned Roadworks Both Directions
    Near Wongi State Forest, south of Torbanlea.
    Commencing: late April
    Concluding:Late 2015, weather permitting
    Lane or lanes reduced
    Delays expected. Allow extra travel time.
    Works will generally be undertaken from 6am to 6pm, Monday to Saturday. Motorists should expect changed conditions, including reduced speed limits and partial lane closures, while works are underway. For further information, contact Transport and Main Roads on 1300 728 390 during business hours or email bundaberg.office@tmr.qld.gov.au.
    Last edited: 17 Apr 2015 11:57
    Information provided by Department of Transport and Main Roads.

  • HERRIES STREET

    EAST TOOWOOMBA

    Planned Roadworks Both Directions
    HERRIES STREET CLOSED BETWEEN COHOE STREET AND CURSON STREET.
    Commencing: 06 July 2015
    Concluding: 19 July 2015
    Road closed both directions
    No delays expected. Use alternative route.
    Last edited: 22 Jun 2015 10:02
    Information provided by Department of Transport and Main Roads.

  • LOGAN ROAD

    EIGHT MILE PLAINS

    Planned Roadworks
    Commencing: 26 February 2015, at 1:17pm
    Concluding:30 July 2015, at 5:00pm
    Single lane in operation
    Delays expected. Changed traffic conditions.
    Logan Road Service Road will have changed traffic conditions for approximately 3 months while a new service road is being constructed as part of the Warrigal Road bus solution.
    #42
    Last edited: 26 Feb 2015 13:22
    Information provided by Department of Transport and Main Roads.

  • SAMFORD ROAD

    ENOGGERA

    Planned Roadworks Outbound
    Commencing: 01 July 2015, at 7:00am
    Concluding:31 July 2015, at 3:00pm
    One lane closed
    No delays expected. Changed traffic conditions.
    The Department of Transport and Main Roads (TMR) will be carrying out minor works beside Samford Road, Enoggera between 20 July 2015 and 28 August 2015.
    The outbound left lane between Malcolm Street and Norman Terrace will be closed between 7am and 3pm on weekdays to ensure the safety of work crews and motorists.
    Please watch for temporary traffic control and reduced speed limits. Only the outbound kerbside lane is affected.
    Last edited: 03 Jul 2015 08:01
    Information provided by Department of Transport and Main Roads.

  • ADVENTURE WAY

    EULO

    Planned Roadworks Both Directions
    Approximately 3.2 kilometres east of intersection with Hungerford Road.
    Commencing: 15 June 2015, between the hours of 6:00am and 6:00pm, 7 days a week.
    Concluding: 30 July 2015, weather permitting.
    Single lane in operation
    Delays expected. Changed traffic conditions.

    On Site during working hours: Single lane in operation, Reduced speed 40km/hr, Traffic control with possible delays of up to 5mins. Please proceed with caution.

    On Site after hours: Single lane in operation, Reduced speed 60km/hr, Portable traffic signals with possible delays of up to 5mins. Please proceed with caution.

    Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au

    Last edited: 12 Jun 2015 14:47
    Information provided by Department of Transport and Main Roads.

  • WOOLCOCK STREET

    GARBUTT

    Planned Roadworks All directions
    Various sections along Woolcock Street, Charters Towers Road and Dalrymple Road will have works associated with NBN installations.
    Commencing: 01 July 7:00am
    Concluding:01 November 2015, at 5:00pm
    Partial lane closures
    Unknown traffic impact. Proceed with caution.
    Works along Woolcock Street between Ingham Road and Mather Street, Charters Towers road between Woolcock Street and Kenilworth Avenue and Dalrymple Road between Banfield Drive and O'Keefe Court. There will be closure of shoulder during these works.
    Last edited: 03 Jul 2015 12:14
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    GLENORCHY

    Planned Roadworks Both Directions
    Between south of Eight Mile Road/Old Gympie Road and north of Seven Mile Road.
    Commencing: late April
    Concluding:late 2015, weather permitting
    Both lanes affected
    Delays expected. Allow extra travel time.
    Works will generally be undertaken between 6am and 6pm, Monday to Saturday. Motorists are advised to expect changed conditions, including reduced speed limits and partial lane closures, while works are underway. For further information, contact Transport and Main Roads on 1300 728 390 during business hours or email bundaberg.office@tmr.qld.gov.au.
    Last edited: 17 Apr 2015 11:57
    Information provided by Department of Transport and Main Roads.

  • BURNETT HIGHWAY

    GRACEMERE

    Planned Roadworks Both Directions
    Intersection of Burnett Highway and Bruce Highway.
    Commencing: 18 May 12:00am
    Concluding:30 July 2015, at 12:00pm
    Road closed both directions
    No delays expected. Use alternative route.
    Access between the Bruce Highway and Burnett Highway is closed to all traffic, with a detour in place via Gavial-Gracemere Road.
    Last edited: 18 May 2015 15:59
    Information provided by Department of Transport and Main Roads.

  • CHARTERS TOWERS ROAD

    HYDE PARK

    Planned Roadworks All directions
    Between Woolcock Street and Kenilworth Drive, along Dalrymple Road between Banfield Drive and O'Keefe Court and along Bruce Highway between Ingham Road and Mather Street.
    Commencing: 18 June 7:00am
    Concluding:15 October 2015, at 5:00pm
    Lane or lanes reduced
    Unknown traffic impact. Observe signage.
    Last edited: 03 Jul 2015 12:20
    Information provided by Department of Transport and Main Roads.

  • WOOLCOCK STREET

    HYDE PARK

    Planned Roadworks Both Directions
    Installation of new water mains on various state controlled roads - Woolcock Street, Ross River Road, Bowen Road and Charters Towers Road.
    Commencing: 15 May 2015, at 7:00am
    Concluding:30 September 2015, at 2:00pm
    Partial lane closures
    Unknown traffic impact. Changed traffic conditions.
    Last edited: 03 Jul 2015 12:13
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    ILBILBIE

    Planned Roadworks Both Directions
    Shoulder widening and line marking either side of Ilbilbie. Motorists can expect short term lane closures and reduced speed limits of 60kph..
    Commencing: 13 April 2015, at 6:00am
    Concluding:30 June 2015, at 12:00am
    Partial lane closures
    No delays expected. Reduced speed limit (60km/h).
    Please drive carefully through roadworks.
    Last edited: 02 Apr 2015 14:12
    Information provided by Department of Transport and Main Roads.

  • MOGGILL ROAD

    INDOOROOPILLY

    Planned Roadworks All directions
    Commencing: 01 July 2015, at 7:00pm
    Concluding:10 November 2015, at 5:00am
    All lanes affected
    Delays expected. Changed traffic conditions.
    Works will be carried out from early July 2015 until late October 2015, weather and construction conditions permitting.

    Construction will predominantly be undertaken at night from Sunday to Friday between 7.00pm and 5.00am due to traffic volumes on Moggill Road. Some works will also be undertaken from time to time, during the day or on weekends for the safety of road workers and motorists.

    Motorists may experience short traffic delays and lane closures during the works. There will also be temporary reductions in the speed limit. Traffic control will be in place to ensure the safety of road workers and motorists. There will be some construction noise, lighting and dust associated with these works. However, TMR will make every effort to minimise disruptions throughout the duration of this project.

    TMR apologises for any inconvenience these works may cause to residents and motorists and appreciates your patience while these important safety works are carried out.

    Last edited: 29 Jun 2015 18:25
    Information provided by Department of Transport and Main Roads.

  • MOGGILL ROAD

    INDOOROOPILLY

    Planned Roadworks Southbound
    Moggill Road, Indooroopilly,
    Western Freeway on and off-ramps at Moggill Road, Indooroopilly
    Russell Terrace, Indooroopilly
    Centenary Bikeway
    .
    Commencing: 10 May 2015, at 8:00pm
    Concluding:25 May 2016, at 5:00am
    Road closed single direction
    Delays expected. Changed traffic conditions.
    Motorists are advised that the southbound on-ramp to the Western Freeway from Moggill Road will be temporarily closed from 8pm to 5am, Sunday to Thursday nights from Sunday 10 May to Thursday 24 May, 2015, weather permitting, as part of works for the Moggill Road cycle bridge.During this closure, a detour will be in place for motorsists wishing to travel south on the Centenary Motorway from Moggill Road. Motorists will continue on Moggill Road, detouring onto Fig Tree Pocket Road before entering the Motorway southbound at Fig Tree Pocket. Signage will be in place to guide motorists during this detour.
    Traffic management including reduced speed limits and signage will be in place during the closure. Minor delays may be expected. For further information please call 13 QGOV (13 7468)

    Last edited: 06 May 2015 11:53
    Information provided by Department of Transport and Main Roads.

  • MOGGILL ROAD

    INDOOROOPILLY

    Planned Roadworks Both Directions
    Commencing: 10 April 2015, at 10:00am
    Concluding:01 February 2016, at 5:00pm
    No blockage
    No delays expected. Changed traffic conditions.
    Motorists are advised that construction of the Moggill Road cycle bridge will commence in April 2015 and will continue through to early 2016.

    Traffic management including reduced speed limits, traffic controllers and devices will be in place where required. To ensure the safety of motorists and workers, some traffic control including shoulder and lane closures will be required at times.

    For further information about the project, please call 13QGOV.

    Last edited: 10 Apr 2015 12:51
    Information provided by Department of Transport and Main Roads.

  • VICTORIA MILL ROAD

    INGHAM

    Planned Roadworks Both Directions
    Construction works along Forest Beach Road.
    Commencing: 07 April 6:00am
    Concluding:30 November 2015, at 6:00pm
    No blockage
    No delays expected. Changed traffic conditions.
    Last edited: 03 Jul 2015 12:18
    Information provided by Department of Transport and Main Roads.

  • HUTTON STREET

    INJUNE

    Planned Roadworks Both Directions
    Intersection Carnarvon Highway, Hutton Street Injune and Injune to Taroom Road, Third avenue Injune.
    Commencing: 14 July 2015, between the hours of 6:00am and 6:00pm, 7 days a week.
    Concluding: 01 September 2015, weather permitting
    Single lane in operation
    Delays expected. Changed traffic conditions.

    On site during working hours 6:00am to 6:00pm:- Single lane in operation, reduced speed 40km/h, traffic control with possible delays of up to 15mins, please allow for extra travel time

    On site after hours: Single lane in operation, reduces speed 60km/h, portable traffic signals with possible delays of up to 5mins.

    Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au

    Last edited: 03 Jul 2015 10:12
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    KALLANGUR

    Planned Roadworks Both Directions
    The Department of Transport and Main Roads (TMR) would like to advise you that work will begin on Monday 23 February 2015 on Stage 2 of the Kallangur Noise Barrier project.
    Commencing: 24 February 2015, at 2:40pm
    Concluding:Mid 2015
    Unknown traffic impact. Traffic control on scene.

    The Department of Transport and Main Roads (TMR) would like to advise you that work will begin on Monday 23 February 2015 on Stage 2 of the Kallangur Noise Barrier project.

    TMR completed on-site noise testing along the Bruce Highway between Pine Rivers Bridge and Boundary Road. The results identified that the noise barriers located between Orchid Avenue and Duffield Road to the west of the highway and along the boundary fence of Kerr Road to the east of the highway in Kallangur require upgrading.

    These noise barriers are being upgraded in two stages. Stage 1 of the project was constructed by Downer Mouchel and involved replacing wooden barriers on the western side of the Bruce Highway between Duffield Road and Jillian Street in Kallangur with 3.6 metre high concrete panels. This stage was completed in late 2014.

    The construction contract for Stage 2 has been awarded to Epoca Constructions, and works involve upgrading the existing timber barrier on the western side of the Bruce Highway between Orchid Avenue and Duffield Road to concrete panels, as well as installing a new barrier on the eastern side of the highway behind the existing barrier near Kerr Road.

    Work over the coming weeks will involve the removal of vegetation on either side of the existing barrier to allow for access and a clear and safe project site, followed the removal of the existing barriers and post hole digging and construction for the new barriers. Full construction of the new barriers is expected to be completed by mid-2015, weather permitting.

    Nearby residents may experience some minor construction noise and while works are occurring near their property. The department will endeavour to progress the works as quickly as possible and minimise any inconvenience to these residents.

    For further information about the project, please contact Project Manager Geoff Bates on 5451 7055. Further information about the project can be found at www.tmr.qld.gov.au under projects ‘Kallangur noise barrier project’. For up-to-date information on traffic disruptions please visit www.131940.qld.gov.au or call 13 19 40.

    Last edited: 24 Feb 2015 14:33
    Information provided by Department of Transport and Main Roads.

  • BRINSMEAD KAMERUNGA ROAD

    KAMERUNGA

    Planned Roadworks All directions
    Intersection of Harley Street.
    Commencing: in progress
    Concluding:end July 2015
    Lane or lanes reduced
    Unknown traffic impact. Changed traffic conditions.
    Last edited: 06 Jul 2015 10:02
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    KENNEDY

    Planned Roadworks Both Directions
    Yellow Waterholes Creek to Dallachy Creek.
    Commencing: in progress
    Concluding:end July 2015
    Lane or lanes reduced
    Unknown traffic impact. Changed traffic conditions.
    Last edited: 06 Jul 2015 09:32
    Information provided by Department of Transport and Main Roads.

  • DAWSON HIGHWAY

    KIN KORA

    Planned Roadworks All directions
    Kin Kora roundabout.
    Commencing: 12 May 2015, at 11:58am
    Concluding:29 January 2016, at 6:00pm
    Partial lane closures
    Delays expected. Changed traffic conditions.
    Works to upgrade the Dawson Highway / Philip Street intersection are underway. There will be not traffic impacts during daytime hours however lane closures will occur at night. Traffic control will be in place.
    Last edited: 12 May 2015 11:59
    Information provided by Department of Transport and Main Roads.

  • KOGAN CONDAMINE ROAD

    KOGAN

    Planned Roadworks Both Directions
    Three separate work sites over a 35 kilometer stretch of road beginning at Kogan township and heading West. Only one work site will be operational at a time.
    Commencing: 30 March 2015 at 06.00AM
    Concluding: 13 July 2015 at 06.00AM
    Single lane in operation
    Delays expected. Changed traffic conditions.

    Work Hours: Monday - Friday, single lane in operation, portable signals, reduced speed to 40km/hour, with delays of up to 5 minutes.

    After Hours: Single lane in operation, speed reduced to 60km/hour with delays of up to 5 minutes.

    Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au

    Last edited: 26 Mar 2015 07:41
    Information provided by Department of Transport and Main Roads.

  • GORDON STREET EXIT

    MACKAY

    Planned Roadworks All directions
    Showgrounds and Shakespeare Street Intersection upgrades
    Changed traffic conditions.
    Commencing: 21 April 2015, at 3:55pm
    Concluding:31 October 2015, at 12:00am
    Partial lane closures
    Delays expected. Proceed with caution.
    Last edited: 21 Apr 2015 15:56
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    MACKAY

    Planned Roadworks All directions
    Showgrounds and Shakespeare Street Intersection upgrades
    Changed traffic conditions.
    Commencing: 21 April 2015, at 3:53pm
    Concluding:31 October 2015, at 12:00am
    Partial lane closures
    Delays expected. Changed traffic conditions.
    Last edited: 21 Apr 2015 15:54
    Information provided by Department of Transport and Main Roads.

  • SHAKESPEARE STREET

    MACKAY

    Planned Roadworks All directions
    Showgrounds and Shakespeare Street Intersection upgrades
    Changed traffic conditions.
    Commencing: 21 April 2015, at 3:50pm
    Concluding:31 October 2015, at 12:00am
    Partial lane closures
    Delays expected. Observe signage.
    Last edited: 21 Apr 2015 15:50
    Information provided by Department of Transport and Main Roads.

  • KENNEDY HIGHWAY

    MAREEBA

    Planned Roadworks All directions
    Malone Road and Godfrey Road intersection upgrade works.
    Commencing: in progress
    Concluding:September 2015
    Lane or lanes reduced
    Delays expected. Changed traffic conditions.
    Last edited: 06 Jul 2015 10:03
    Information provided by Department of Transport and Main Roads.

  • MACKAY EUNGELLA ROAD

    MARIAN

    Planned Roadworks Both Directions
    Commencing: 21 May 2015, at 4:34pm
    Concluding:15 July 2015, at 12:00am
    Partial lane closures
    Delays expected. Allow extra travel time.
    Night works from 19 June 2015 to 24 June between 6pm and 6am. Newbury Mt Vince Road intersection is open during this time.
    Last edited: 19 Jun 2015 14:31
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    MCDESME

    Planned Roadworks Both Directions
    Burdekin Bridge - Home Hill
    Maintenance works.
    Commencing: 01 July 2015, at 9:00am
    Concluding:31 July 2015, at 2:45pm
    Partial lane closures
    Delays expected. Changed traffic conditions.

    Motorists are advised that maintenance works will be completed on the Burdekin Bridge, Home Hill between the hours of 9.00am to 2.45pm on the following dates:

    30 June - 3 June 2015
    6 July - 10 July 2015
    14 July - 17 July 2015
    20 July - 24 July 2015

    Speed restrictions and changed traffic conditions including single lane closures and stop/go controls will be in place. Motorists can expect minor delays. The Department thanks motorists for their patience and cooperation while these works are being completed
    Last edited: 03 Jul 2015 14:13
    Information provided by Department of Transport and Main Roads.

  • AYR DALBEG ROAD

    MCDESME

    Planned Roadworks Both Directions
    Commencing: 01 June 2015, at 7:00am
    Concluding:14 August 2015, at 6:00pm
    Partial lane closures
    No delays expected. Observe signage.
    Last edited: 03 Jul 2015 12:14
    Information provided by Department of Transport and Main Roads.

  • MIVA ROAD

    MIVA

    Planned Roadworks All directions
    Dickabram Bridge on Miva Road.
    Commencing: 25 May 8:00am
    Concluding:27 July 2015, at 4:00pm
    Road closed both directions
    Delays expected. Use alternative route.
    To ensure crews can access all parts of the bridge safely and efficiently, temporary closures will be put in
    place.
    Load testing work will be carried out from Monday, 25 May, to Friday, 29 May, between 7am and 5pm,
    weather permitting. The bridge will be open to motorists at night.
    Structural works will be carried out from 1 June between 9.30am Monday and 1pm Friday, weather
    permitting.
    The bridge will remain closed at night and open to motorists at the weekend.
    During the closure, motorists should use the local road network or use Bauple-Woolooga Road.
    Variable message signs will be put in place at each end of Miva Road alerting motorists to the changed
    conditions ahead.
    Transport and Main Roads thanks everyone in advance for their patience and cooperation while these
    important bridge works are underway.
    If you require further information about the works, please contact the Bundaberg office on 1300 728 390
    during business hours, or email bundaberg.office@tmr.qld.gov.au.
    Last edited: 22 May 2015 15:15
    Information provided by Department of Transport and Main Roads.

  • WOOLCOCK STREET

    MOUNT LOUISA

    Planned Roadworks Both Directions
    Detour signage on Woolcock Street for works on Mather Street.
    Commencing: 22 June 2015, at 6:30am
    Concluding:11 July 2015, at 6:30pm
    No blockage
    No delays expected. Observe signage.
    Last edited: 03 Jul 2015 12:22
    Information provided by Department of Transport and Main Roads.

  • DALRYMPLE ROAD

    MOUNT LOUISA

    Planned Roadworks Eastbound
    Near Banfield Drive roundabout.
    Commencing: 21 April 2015, at 6:00am
    Concluding:04 August 2015, at 6:00pm
    Partial lane closures
    Unknown traffic impact. Observe signage.
    Last edited: 03 Jul 2015 12:14
    Information provided by Department of Transport and Main Roads.

  • DALRYMPLE ROAD

    MOUNT LOUISA

    Planned Roadworks
    Various locations along Woolcock Street and Dalrymple Road.
    Commencing: 09 February 2015, at 7:00am
    Concluding:09 August 2015, at 6:00pm
    No blockage
    Unknown traffic impact. Observe signage.
    Last edited: 03 Jul 2015 12:11
    Information provided by Department of Transport and Main Roads.

  • CENTENARY HIGHWAY

    MOUNT OMMANEY

    Planned Roadworks Inbound
    On Ramp Upgrade .
    Commencing: 06 July 2015, at 7:00pm
    Concluding:27 November 2015, at 5:00am
    Partial lane closures
    Delays expected. Changed traffic conditions.
    The Department of Transport and Mains Roads (TMR) will be carrying out road works to improve safety for traffic using the inbound on-ramp of the Centenary Highway in the vicinity of the Mt Ommaney Shopping center.
    The Works are expected to be carried out from early July 2015 to late 2015 from Sunday to Friday nights between 7pm and 5am.
    During construction, the following changed conditions will apply
    Temporary lane closures, Reduced speed limit's, Traffic controllers and Signage indication changed conditions.
    Please follow the directions of the signage and traffic controllers and drive carefully through the work zone.
    For more general information
    Phone:1800 045 348 or
    Email: metropolitanregion@tmr.qld.gov.au
    Last edited: 02 Jul 2015 16:16
    Information provided by Department of Transport and Main Roads.

  • CUNNINGHAM HIGHWAY

    MUTDAPILLY

    Planned Roadworks Both Directions
    Cunningham Highway between Mount Goebels Rd and Champions Way, Mutdapilly.
    Commencing: 17 June 2015, at 7:30pm
    Concluding:31 July 2015, at 5:00am
    Partial lane closures
    Delays expected. Changed traffic conditions.
    The Department of Transport and Main Roads will be carrying out line marking in the centre of the Cunningham Highway between 17 June 2015 and 31 July 2015.
    Please watch for temporary traffic control, single lane closures, reduced speed limits. Be prepared for slight delays on occasions.
    The work is being funded by the Safer Rods Sooner program to improve safety by widening the centre lines on this stretch of road which has a significant crash history.
    For more information duding the works, contact Garry Dale Ph 0417 789 885 or for general enquirers email
    metropolitanregion@tmr.qld.gov.au
    Last edited: 16 Jun 2015 07:17
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    NORTH LAKES

    Planned Roadworks Southbound
    Works will commence on the Anzac Avenue southbound on-ramp to the Bruce Highway as part of the Bruce Highway Managed Motorway Project.
    Commencing: 18 September 2014, at 5:45pm
    Concluding:Mid 2015
    Lane or lanes reduced
    Delays expected. Traffic control on scene.
    Last edited: 19 Sep 2014 12:01
    Information provided by Department of Transport and Main Roads.

  • EYRE STREET

    NORTH WARD

    Planned Roadworks Both Directions
    Commencing: 30 April 2015, at 7:00am
    Concluding:10 July 2015, at 5:00pm
    Partial lane closures
    No delays expected. Observe signage.
    Last edited: 03 Jul 2015 12:16
    Information provided by Department of Transport and Main Roads.

  • GATEWAY MOTORWAY

    NUDGEE

    Planned Roadworks Both Directions
    Commencing: 02 June 2015, at 8:00pm
    Concluding:31 August 2015, at 5:00am
    Partial lane closures
    Delays expected. Allow extra travel time.
    Night Works are required on the Gateway Motorway between Southern Cross Way and the Bicentennial Road exit between 02/06/2015 and 31/08/2015.
    #112
    Last edited: 02 Jun 2015 12:15
    Information provided by Department of Transport and Main Roads.

  • CARNARVON HIGHWAY

    ORANGE HILL

    Planned Roadworks Both Directions
    Intersection Euthella Road and Knayers Road.
    Commencing: 06 July 2015, between the hours of 6:00am and 6:00pm, Monday to Friday.
    Concluding: 28 August 2015, weather permitting
    Single lane in operation
    Delays expected. Changed traffic conditions.

    On site during workin hours 6:00am to 6:00pm:- Single lane in operation, reduced speed 40km/h, portable traffic signals with possible delays of up to 5mins.

    On site after hours: Reduced speed 60km/hr

    Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au

    Last edited: 03 Jul 2015 10:38
    Information provided by Department of Transport and Main Roads.

  • GOLD COAST HIGHWAY

    PALM BEACH

    Planned Roadworks Both Directions
    Commencing: late June 2015
    Concluding:late 2015
    Lane or lanes reduced
    No delays expected. Changed traffic conditions.
    Installation of street lighting from south of the Thrower Drive intersection to Currumbin Creek bridge.
    Last edited: 09 Jun 2015 12:23
    Information provided by Department of Transport and Main Roads.

  • SMITH STREET

    PARKWOOD

    Planned Roadworks All directions
    Ramp closures Tues 30/6 8pm to 5am:
    - westbound loop ramp from Olsen Ave to Smith St
    - westbound off-ramp from Smith St to Olsen Ave.
    Commencing: 28 April 12:00am
    Concluding:06 July 2015, at 12:00am
    Road closed single direction
    Delays expected. Use alternative route.
    Works are expected to finish by mid 2015
    Last edited: 30 Jun 2015 13:51
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    PORT CURTIS

    Planned Roadworks Both Directions
    Commencing: 17 February 2015, at 12:00am
    Concluding:30 July 2015, at 12:00am
    No blockage
    No delays expected. Observe signage.
    Traffic changes will be introduced at the Yeppen South project, south of Rockhampton, from 17 February 2015.

    From this date, access between the Bruce Highway and Burnett Highway will be closed to all traffic, with a detour in place via Gavial-Gracemere Road.

    Last edited: 11 Feb 2015 09:34
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    PORT CURTIS

    Planned Roadworks Both Directions
    Bruce Highway - Egans Hill to Yeppen Roundabout.
    Commencing: 10 April 10:29am
    Concluding:31 March, at 12:00am
    No delays expected. Changed traffic conditions.
    Construction has commenced on the $296 million Yeppen South project between Egans Hill and Yeppen roundabout, south of Rockhampton.

    Speed restrictions are in place.
    Last edited: 10 Apr 2014 10:30
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    PROSERPINE

    Planned Roadworks Both Directions
    Works to take place 40km - 43km north of Proserpine..
    Commencing: 01 July 2015, at 12:00am
    Concluding:28 October 2015, at 12:00am
    Partial lane closures
    Delays expected. Traffic control on scene.
    The works are to extend the wide of 3 culverts.
    Last edited: 30 Jun 2015 13:45
    Information provided by Department of Transport and Main Roads.

  • BOUNDARY STREET

    RAILWAY ESTATE

    Planned Roadworks All directions
    Installation and removal of race circuit infrastructure.
    Commencing: 16 June 2015, at 6:00am
    Concluding:31 July 2015, at 6:00pm
    Partial lane closures
    Delays expected. Changed traffic conditions.
    Last edited: 03 Jul 2015 12:16
    Information provided by Department of Transport and Main Roads.

  • SAUNDERS STREET

    RAILWAY ESTATE

    Planned Roadworks
    Commencing: 13 June 2014, at 2:30pm
    Concluding:12 August 2015, at 8:00pm
    No blockage
    Unknown traffic impact. Changed traffic conditions.
    Last edited: 03 Jul 2015 12:12
    Information provided by Department of Transport and Main Roads.

  • KENNEDY HIGHWAY

    RAVENSHOE

    Planned Roadworks Both Directions
    From Millstream Bridge to Millstream Falls Road. Rough surface. Drive with care.
    Commencing: in progress
    Concluding:August 2015
    All lanes affected
    Delays expected. Reduced speed limit (60km/h).
    Last edited: 06 Jul 2015 09:50
    Information provided by Department of Transport and Main Roads.

  • GEORGE STREET

    ROCKHAMPTON CITY

    Planned Roadworks All directions
    Traffic signal upgrade at the George St / Denham St intersection.
    Commencing: 18 May 2015, at 6:00am
    Concluding:31 July 2015, at 6:00pm
    Partial lane closures
    Delays expected. Traffic control on scene.
    Day and night works.
    Last edited: 12 May 2015 13:03
    Information provided by Department of Transport and Main Roads.

  • SHIPTONS FLAT ROAD

    ROSSVILLE

    Planned Roadworks Both Directions
    Wallaby Creek Bridge Repairs.
    Commencing: in progress
    Concluding:mid July 2015
    Lane or lanes reduced
    Delays expected. Changed traffic conditions.
    Last edited: 06 Jul 2015 10:03
    Information provided by Department of Transport and Main Roads.

  • LAMINGTON NATIONAL PARK ROAD

    SARABAH

    Planned Roadworks Both Directions
    15.5 km from Canungra. Night time road closures from 8:30pm to 5:30am Sunday to Thursday nights from 28 June..
    Commencing: 28 June
    Concluding:late August 2015
    Road closed both directions
    Delays expected. Changed traffic conditions.
    Lamington National Park Road will be closed 15.5 from Canungra from Sunday to Thursday nights (from 8:30pm to 5:30am)starting 28 June.

    Last edited: 06 Jul 2015 21:01
    Information provided by Department of Transport and Main Roads.

  • SHAW ROAD

    SHAW

    Planned Roadworks All directions
    There will be intermittent stopages of traffic for no longer then 5 minutes in the vacinity of Kalynda Parade. This is for the haulage of material for the Ring Road Four project..
    Commencing: 17 June 2015, at 6:00am
    Concluding:31 July 2015, at 6:00pm
    Partial lane closures
    Delays expected. Traffic control on scene.
    Last edited: 03 Jul 2015 12:16
    Information provided by Department of Transport and Main Roads.

  • OLSEN AVENUE

    SOUTHPORT

    Planned Roadworks All directions
    Ramp closures Tues 30/6 8pm to 5am:
    - westbound loop ramp from Olsen Ave to Smith St
    - westbound off-ramp from Smith St to Olsen Ave.
    Commencing: 15 December 10:28am
    Concluding:06 July 2015, at 12:00am
    Road closed single direction
    Long delays expected. Allow extra travel time.
    Check out TMR's web page for further details on this project www.tmr.qld.gov.au/projects
    Call 1800 600 163 to register for free SMS or email traffic alerts when traffic conditions change on this project
    Last edited: 30 Jun 2015 13:50
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    STUART

    Planned Roadworks
    Various low impact areas around Townsville.
    Commencing: 19 February 2015, at 7:00am
    Concluding:21 March 2016, at 6:00pm
    Partial lane closures
    No delays expected. Observe signage.
    Last edited: 03 Jul 2015 12:17
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    STUART

    Planned Roadworks Both Directions
    Bruce Highway Upgrade (Vantassel to Cluden) - Highway Duplication.
    Commencing: 09 October 2013, at 9:00am
    Concluding:Mid 2015
    Partial lane closures
    Delays expected. Changed traffic conditions.
    Works continuing on the Bruce Highway Upgrade (Vantassel to Cluden). Speed restrictions and changed traffic conditions, including lane closures, traffic diversions, stop/go controls and temporary sidetracks are in place on the Bruce Highway between Zinc Avenue and Cluden Drive.

    Motorists should expect delays when travelling on this section of the Bruce Highway and be prepared for regularly changing traffic conditions. There is also increased construction traffic and heavy vehicles using the highway. Please slow down and obey all signage. A 60km/h speed restriction is in place between Zinc Avenue and Cluden Drive.

    This project is due for completion in late-2015.

    Major traffic changes are in place at the following intersections:

    Abbott Street has reopened to all traffic.

    Bruce Highway / Zinc Avenue
    • Temporary diversions and lane closures are in place

    Bruce Highway / Hunter Street
    • Temporary diversions and lane closures are in place

    Abbott Street
    • A temporary road closure is in place along Abbott Street until Friday 26 June 2015 (weather permitting)
    • Access along Abbott Street between Keenan Street and the Townsville Sewerage Pump station will be maintained for local traffic only
    • During the closure access to the Bruce Highway and the city will be via Lakeside Drive, Idalia and access to Racecourse Road will be via a newly constructed road
    • Travelling to the city:
    o Access to the city will be via Lakeside Drive, Idalia
    o Access to Racecourse Road will be via a newly constructed road
    o No through traffic will be permitted beyond Racecourse Road
    • Travelling from the city:
    o Access to the Bruce Highway will be via Lakeside Drive, Idalia
    o Access along Abbott Street between Keenan Street and, the Townsville sewerage pump station will be maintained
    o No through Traffic will be permitted beyond the Townsville Sewerage Pump Station
    • Speed restrictions and signage will be in place to direct motorists.

    Lakeside Drive
    • Temporary diversions and lane closures are in place

    University Road / Stuart Drive
    • Diversions, road closures and temporary signage will be in place from Thursday 21 May 2015 to allow for the reconstruction of University Road and Stuart Drive intersection
    • Motorists will be diverted on to the newly constructed southbound lanes
    • Access to Newton Street will be via a temporary roundabout and side track located at the University Road and Cluden Driver intersection
    • Advanced warning signs will be used to notify road users of the new arrangements


    University Road / Cluden Drive
    • Temporary roundabout in place from Thursday 21 May to access Cluden Drive and Newton Street
    • No right turn from Cluden Drive on to University Road

    The Department of Transport and Main Roads encourages all users to drive safely and observe signs and instructions during these works. We thank you for your patience and understanding while we safely complete these works.
    Last edited: 03 Jul 2015 14:14
    Information provided by Department of Transport and Main Roads.

  • MAINS ROAD

    SUNNYBANK

    Planned Roadworks Both Directions
    To Calam Road.
    Commencing: 08 June 2015, at 7:00am
    Concluding:30 December 2015, at 5:00pm
    Partial lane closures
    Delays expected. Changed traffic conditions.
    What to expect during these works:
    * changed traffic conditions along Mains and Beaudesert Roads
    * construction vehicles and plant will be operating in the area and residents and businesses may notice increased noise during work hours
    * Stop and go traffic controllers (short delays may occur)

    The standard work hours for the project are 7am to 5pm, Monday to Saturday, weather and construction conditions permitting.
    If you require further information on this project, please contact the Project Team on 3066 1309 or by email metropolitanregion@tmr.qld.gov.au during business hours.
    Alternatively, please contact the Department of Transport and Main Roads on 13QGOV (13 74 68) during business hours.
    For up-to-date information on road closures and traffic conditions across Queensland, please visit www.131940.qld.gov.au or call 13 19 40.
    For up-to-date passenger information please visit translink.com.au or call 13 12 30 anytime.


    #118

    Last edited: 05 Jun 2015 18:21
    Information provided by Department of Transport and Main Roads.

  • TAMBORINE MOUNTAIN ROAD

    TAMBORINE

    Planned Roadworks Both Directions
    Roadworks between Nieuwenburg Place and Beaudesert-Beenleigh Road roundabout between 6.30am and 6pm.
    Commencing: 23 June 6:00am
    Concluding:26 November 2015, at 5:00pm
    Partial lane closures
    No delays expected. Changed traffic conditions.
    Roadworks between Nieuwenburg Place and Beaudesert-Beenleigh Road roundabout between 6.30am and 6pm
    Last edited: 23 Jun 2015 10:20
    Information provided by Department of Transport and Main Roads.

  • RAMSAY ROAD

    THANGOOL

    Planned Roadworks Both Directions
    Commencing: 29 June 6:00am
    Concluding:31 July 2015, at 6:00pm
    Single lane in operation
    Delays expected. Observe signage.
    Last edited: 25 Jun 2015 09:37
    Information provided by Department of Transport and Main Roads.

  • RIVERWAY DRIVE

    THURINGOWA CENTRAL

    Planned Roadworks Both Directions
    Commencing: 10 October 2014, at 7:00am
    Concluding:31 December 2015, at 5:00pm
    No blockage
    Unknown traffic impact. Observe signage.
    Last edited: 03 Jul 2015 12:13
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    TULLY

    Planned Roadworks Both Directions
    Near Banyan Creek.
    Commencing: in progress
    Concluding:August 2015
    Lane or lanes reduced
    Unknown traffic impact. Changed traffic conditions.
    Available width 3.5 metres
    Last edited: 06 Jul 2015 10:04
    Information provided by Department of Transport and Main Roads.

  • CONDAMINE HIGHWAY

    WARKON

    Planned Roadworks Both Directions
    Yuleba Creek or approximatley 47 kilometres east of the intersection Carnarvon Highway Roma Condamine Road.
    Commencing: 04 June 2015, between the hours of 6:00am and 6:00pm, Monday to Friday.
    Concluding: 16 July 2015, weather permitting.
    Single lane in operation
    Delays expected. Changed traffic conditions.

    On Site during working hours: Single lane in operation, reduced speed 40km/hr, Portable Traffic Signals with possible delays of up to 15mins, Please allow for extra travel time.

    On Site after hours: Reduced speed 60km/hr.

    Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au

    Last edited: 03 Jul 2015 11:26
    Information provided by Department of Transport and Main Roads.

  • WOOLCOCK STREET

    WEST END

    Planned Roadworks
    Various Roads within Townsville region.
    Commencing: 12 March 2015, at 6:00am
    Concluding:09 March 2016, at 3:00pm
    No blockage
    No delays expected. Observe signage.
    Last edited: 03 Jul 2015 12:16
    Information provided by Department of Transport and Main Roads.

  • GORE HIGHWAY

    WESTBROOK

    Planned Roadworks Both Directions
    Between Boundary Street South to Althaus Road.
    Commencing: 08 July 2015 between the hours of 6:00am and 6:00pm, Wednesday to Friday.
    Concluding: 10 July 2015, weather permitting.
    Single lane in operation
    Delays expected. Changed traffic conditions.

    On site during working hours: Single lane in operation, reduced speed 40km/hr, traffic control with possible delays of up to 10mins, please allow for extra travel time.

    On site after hours: Reduced speed 80km/hr, please proceed with caution.

    Last edited: 30 Jun 2015 14:51
    Information provided by Department of Transport and Main Roads.

  • MOUNT GRAVATT CAPALABA ROAD

    WISHART

    Planned Roadworks Both Directions
    Mt Gravatt Capalaba Road, Wishart, between Broadwater and Gardner/Mt Petrie Roads.
    Gateway Motorway on and off ramps, Mackenzie.
    Commencing: 12 May 2014, at 1:00pm
    Concluding:31 December 2015, at 5:00am
    Lane or lanes reduced
    Delays expected. Changed traffic conditions.
    Motorists are advised that construction of Gateway Upgrade South Stage 2a (Mt Gravatt Capalaba Road) commenced in April 2014 and will continue through to late 2015, weather and construction conditions permitting.
    The Australian Government and Queensland Government are jointly funding the upgrade of Mt Gravatt-Capalaba Road (Broadwater to Gardner Road) as part of the second stage of Gateway Upgrade South projects.
    Bridge duplication works and general road construction activities will be carried out Monday to Saturday between 7am and 5pm.
    Nightworks and temporary lane closures, on Mount Gravatt-Capalaba Road, Wishart and Gateway Motorway on and off-ramps, Mackenzie will be required 8pm to 5am up to 5 nights per week and may also occur off-peak during the day.
    Traffic management including reduced speed limits, traffic controllers and devices will be in place to guide motorists where required. During construction, minor traffic delays and some noise, dust and vibration may be experienced. The project team will endeavour to minimise impacts where possible.
    Please slow down – roadwork safety is your responsibility too.
    For further information contact the project team on 1800 799 686.
    A map and further details of this project can be found at www.tmr.qld.gov.au/gatewayupgradesouth.
    #128

    Last edited: 15 Sep 2014 04:28
    Information provided by Department of Transport and Main Roads.

  • TAMBORINE OXENFORD ROAD

    WONGAWALLAN

    Planned Roadworks Both Directions
    Stop/slow traffic control near Hayes Road weekdays between 6.30am and 5pm.
    Commencing: 20 May 6:30am
    Concluding:30 September 2015, at 5:00pm
    Limited to one lane
    Delays expected. Allow extra travel time.
    Last edited: 20 May 2015 16:29
    Information provided by Department of Transport and Main Roads.

  • BUNYA HIGHWAY

    WOOROOLIN

    Planned Roadworks Both Directions
    Just north of Wooroolin.
    Commencing:
    Concluding:July 2015, weather permitting
    Partial lane closures
    Delays expected. Allow extra travel time.
    Last edited: 24 Jun 2015 10:51
    Information provided by Department of Transport and Main Roads.

  • MONTO MOUNT PERRY ROAD

    YARROL

    Planned Roadworks Both Directions
    Between the Burnett Highway and Kerwee Road.
    Commencing: late January
    Concluding:late 2015, weather permitting
    Road closed both directions
    No delays expected. Allow extra travel time.
    Works to seal three sections of Monto-Mount Perry Road, between the Burnett River and Eastern Creek, are underway. A full road closure is in place between the Burnett Highway and Kerwee Road, and all through traffic will be detoured via Kerwee Road while works are underway. Access will strictly be provided for local traffic only. Motorists should allow additional travel time while using the detour. We apologise for any inconvenience this may cause, and thank you for your patience and cooperation. For further information, contact Transport and Main Roads in Bundaberg on 1300 728 390 during business hours, or email bundaberg.office@tmr.qld.gov.au
    Last edited: 10 Feb 2015 14:37
    Information provided by Department of Transport and Main Roads.

Sorted By:
  • FLINDERS STREET

    TOWNSVILLE CITY

    Special Event Both Directions
    Between Denham Street and Stokes Street. Sundays 6am to 3pm.
    Commencing: 02 August, at 6:00am
    Concluding:17 June 2021, at 3:00pm
    Unknown traffic impact. Use alternative route.
    Flinders Street between Denham Street and Stokes Street is where a planned event will be occurring every Sunday. This event will commence every Sunday at 6:00am and finish up the same day on 3:00pm. A full closure of Flinders Street between Denham Street and Stokes Street will be in place for the duration of the event.
    Last edited: 14 May 2015 10:49
    Information provided by Department of Transport and Main Roads.

  • RAMSAY STREET

    CLONCURRY

    Special Event Both Directions
    Commencing: 22 June 2015, at 1:00pm
    Concluding:22 October 2015, at 12:00am
    No blockage
    No delays expected. Changed traffic conditions.
    Heavy Vehicle operators are advised the new Cloncurry Heavy Vehicle Bypass is open to traffic and are advised to use this route.
    The Bypass turns off the Flinders Highway just east of Cloncurry and joins the previous Bypass route heading toward the Burke Developmental Road.
    Last edited: 22 Jun 2015 13:01
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    CHILDERS

    Special Event Both Directions
    Bruce Highway between Taylor Street and Broadhurst Street Childers.
    Commencing: 5.30am 26 July 2015
    Concluding:5.30pm 26 July 2015
    Road closed both directions
    Delays expected. Use alternative route.
    Bruce Highway (maryborough-Gin Gin) will be closed between Taylor Street and Broadhurst Street, Childers on Sunday 26 July 2015 between 5.30am and 5.30pm for the Childers Cultural Festival. ALL excess dimension vehicles in excess of 2.5m in width are to seek an alternate route. Detours shall be in place for all other vehicles.
    Last edited: 02 Jul 2015 10:34
    Information provided by Department of Transport and Main Roads.

  • BOUNDARY STREET

    RAILWAY ESTATE

    Special Event All directions
    Due to a special event Boundary Street will be closed from Railway Avenue to Woolcock Street.
    Charters Towers Road will be closed from Boundary Street to Ingham Road.
    Commencing: 03 July 2015, at 8:00pm
    Concluding:14 July 2015, at 5:00am
    Road closed both directions
    Delays expected. Changed traffic conditions.
    Last edited: 03 Jul 2015 08:50
    Information provided by Department of Transport and Main Roads.

  • MILTON ROAD

    MILTON

    Special Event All directions
    At Suncorp Stadium. 15 minute parking restrictions apply on match day .
    Commencing: 08 July 2015, at 8:15pm
    Concluding:08 July 2015, at 10:00pm
    Partial lane closures
    Delays expected. Allow extra travel time.
    The QLD v NSW State of Origin Rugby League game will be held at Suncorp Stadium on Wednseday the 8th of July 2015 from 8.15pm.

    Major roads closed for an hour following the game:
    • Roma St inbound will be closed between Skew Street and Turbot Street.
    • Petrie Terrace closed between Milton Road and Caxton Street, excepting local traffic.
    • Milton Road closed inbound between Park Road and Petrie Terrace and
    • Caxton Street closed between Hale Street and Petrie Terrace.
    Coronation Drive and Hale St will remain open at all times. Re-directional signs will be placed on the major routes approaching the Stadium.
    Minor Roads closed for an hour following the game are:
    • Cribb Street between Railway Terrace and Milton Road.
    • Paten Street, Black Street, Granzella Street.
    Minor roads closed for 2½ hours before and 1 hour following the game are:
    • Castlemaine Street, Chippendall Street, Finchley Street, Mayneview Street, Parkview Street and Cordova Street.
    Motorists attending the event should also be aware of the 15 minute parking restriction that applies to the Suncorp Traffic Area on match days.

    Last edited: 01 Jul 2015 20:40
    Information provided by Department of Transport and Main Roads.

  • STANLEY STREET

    WOOLLOONGABBA

    Special Event All directions
    At the Gabba Stadium. 15 minute
    parking restrictions apply.
    Commencing: 12 July 2015 4:40pm
    Concluding:12 July 2015, at 7:15pm
    Partial lane closures
    Delays expected. Allow extra travel time.
    The Brisbane Lions v Sydney Swans AFL game will be held at the Gabba on Sunday 12 July from 4.40pm.
    Traffic congestion may be experienced on Stanley St, Vulture St, and Ipswich Rd from 3.10pm on match day.
    Motorists on the Pacific Motorway may also experience congestion from this time at the northbound Stanley St exit 2 and Stanley St
    onramp and southbound across the Captain Cook Bridge to the
    Vulture St exit 2, Stanley St onramp and Main St.

    Road closures will be in place approximately 45 minutes before the end of the event on Stanley St and Vulture St. Motorists attending the event should also be aware of the 15 minute parking restriction that applies to the Gabba Traffic Area on match days.
    Last edited: 05 Jul 2015 21:59
    Information provided by Department of Transport and Main Roads.

  • GATTON HELIDON ROAD

    GATTON

    Special Event All directions
    Cunningham Classic Cycle Race.
    Commencing: 1 August 2015 at 09.00AM
    Concluding: 1 August 2015 at 05.00PM
    Partial lane closures
    No delays expected. Proceed with caution.

    Motorists are advised to use caution when travelling on the following roads, as there will be an increase in cyclist volumes.

    Gatton Helidon Road, Gatton Clifton Road, New England Highway, Clifton Leyburn Road, Toowoomba Karara Road, Leyburn Cunningham Road, Ryeford Pratten Road, Dalrymple Creek Road, Warwick Allora Road.

    For further information on what roads will be affected please visit www.cunninghamclassic.com.au

    Last edited: 21 May 2015 09:11
    Information provided by Department of Transport and Main Roads.

  • GREENMOUNT HIRSTVALE ROAD

    ASCOT

    Special Event All directions
    Lockyer Antique Motor Association Tractor Trek.
    Commencing: 8 August 2015 at 09.00AM
    Concluding:9 August 2015 at 05.00PM
    No blockage
    No delays expected. Proceed with caution.

    Motorists are advised that the following roads may have an increase in traffic volumes;

    Gatton Clifton Road, Greenmount Hirstvale Road, Nobby Connection Road and Mount Sylvia Road.

    For more information please visit http://lama.org.au/tagged/events

    Last edited: 21 May 2015 08:51
    Information provided by Department of Transport and Main Roads.

  • VICTORIA STREET

    FOREST HILL

    Special Event Both Directions
    Gallipoli Rememberence March.
    Victoria Street Forest Hill, between Church Street and William Steet.
    Commencing: 22 August 2015, between the hours of 10:30am and 11:15am
    Concluding: 22 August 2015.
    Road closed both directions
    No delays expected. Use alternative route.


    Last edited: 08 May 2015 09:35
    Information provided by Department of Transport and Main Roads.

Search by location

Reset

Search by route

Reset