Access keys | Skip to primary navigation | Skip to secondary navigation | Skip to content | Skip to footer
Problems viewing this site

Event information

Sorted By:
  • Great Western Highway

    Linden

    Single Vehicle Crash Eastbound.
    - Weemala Avenue
    Exercise caution
    Last edited: 03 Aug 2015
    Information provided by Transport for NSW.

  • LOGAN MOTORWAY

    PARKINSON

    Stationary Vehicle Westbound
    Left shoulder before Mt Lindsay Highway.
    No blockage
    No delays expected. Proceed with caution.
    Last edited: 03 Aug 2015 09:30
    Information provided by Department of Transport and Main Roads.

  • Windsor Road

    McGraths Hill

    Stationary Vehicle Northbound.
    at Pitt Town Road
    Exercise caution There are no delays.

    Last edited: 03 Aug 2015
    Information provided by Transport for NSW.

  • Queens Road

    Five Dock

    Wires down Hazard Both directions.
    between Harris Road Great North Road
    Eastbound traffic is being diverted into Harris Rd and westbound traffic is being diverted into Great North Rd.

    Last edited: 03 Aug 2015
    Information provided by Transport for NSW.

  • SUNSHINE MOTORWAY

    MOUNTAIN CREEK

    Congestion Eastbound
    East of Dixon Road .
    No blockage
    Delays expected. Proceed with caution.
    Last edited: 03 Aug 2015 08:48
    Information provided by Department of Transport and Main Roads.

  • OXENFORD SOUTHPORT ROAD

    HOPE ISLAND

    Water over road Hazard Both Directions
    Between Santa Barbara Road and Gracemere Drive.
    Lane or lanes reduced
    Unknown traffic impact. Proceed with caution.
    Last edited: 03 Aug 2015 07:40
    Information provided by Department of Transport and Main Roads.

  • ROCKHAMPTON YEPPOON ROAD

    IRONPOT

    Potholes or road surface damage Hazard Westbound
    Westbound between Access 3 and Access 7.
    Both lanes affected
    No delays expected. Reduced speed limit (80km/h).
    Last edited: 28 Jul 2015 11:51
    Information provided by Department of Transport and Main Roads.

  • PALMERSTON HIGHWAY

    WOOROONOORAN

    Potholes or road surface damage Hazard Both Directions
    Vicinity of Henrietta Creek Rest Area.
    All lanes affected
    Unknown traffic impact. Proceed with caution.
    Last edited: 30 Jun 2015 16:07
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    PORT CURTIS

    Congestion Both Directions
    Yeppen South Project between Burnett Highway intersection at Egan's Hill and the Yeppen Roundabout (south of Rockhampton).
    All lanes affected
    Delays expected. Allow extra travel time.
    Intermittment delays will be experienced between 9am and 1pm weekdays due to between two to four road closures per day to transport girders to construction site. Stop-Go traffic control on site, maximum closure of 10 minutes each movement. Commencing Friday 24 April 2015.
    Last edited: 25 Jun 2015 11:41
    Information provided by Department of Transport and Main Roads.

  • DAWSON DEVELOPMENTAL ROAD

    SPRINGSURE

    Potholes or road surface damage Hazard Both Directions
    Unsealed road between Springsure and Tambo is suitable for high clearance vehicles only.
    No blockage
    No delays expected. Use alternative route.
    Large bull dust holes and surface damage.
    Last edited: 25 Jun 2015 11:40
    Information provided by Department of Transport and Main Roads.

  • MALANDA MILLAA MILLAA ROAD

    MILLAA MILLAA

    Potholes or road surface damage Hazard
    Restoration works are underway for road shoulder slip in vicinity of Gillies Avenue. Travel with care.
    One lane closed
    Delays expected. Changed traffic conditions.
    Last edited: 25 Jun 2015 11:38
    Information provided by Department of Transport and Main Roads.

  • WARREGO HIGHWAY

    COLLEGE VIEW

    Potholes or road surface damage Hazard Eastbound
    Road Surface Damage at Moroney Road.
    No delays expected. Reduced speed limit (80km/h).
    Last edited: 25 Jun 2015 11:33
    Information provided by Department of Transport and Main Roads.

  • Various roads

    Bogan Shire

    N/A Hazard .
    at
    Delay journey Avoid the area All unsealed roads are closed. Source: Bogan Shire Council (23/7/15 11am)

    Last edited: 26 Jul 2015
    Information provided by Transport for NSW.

  • Various Roads

    Carrathool Shire Council

    N/A Hazard .
    -
    Check signage Exercise caution The following roads are closed by flooding:
    Whealbah Road (North of Mossgiel Rd to Trida Rd).

    For updates after hours or on weekends or for road emergencies please call 0407 244 429.

    Last update 10.54am Thursday 30 July.

    Last edited: 30 Jul 2015
    Information provided by Transport for NSW.

  • Various roads

    Cobar Shire Council

    Flooding Hazard .
    at
    Allow extra travel time Exercise caution State highways are open.
    Some regional and shire roads are closed or open to light traffic only.
    Please phone (02) 6836 5888 or go to Cobar Shire Council's website for more information.

    Last edited: 30 Jul 2015
    Information provided by Transport for NSW.

  • TAMBO ROAD

    ALPHA

    Open (with caution)
    Last edited: 26 Jun 2015 09:06
    Next update:as conditions change
    Information provided by Department of Transport and Main Roads.

  • HUGHENDEN MUTTABURRA ROAD

    HUGHENDEN

    Hughenden - Muttaburra
    Open (with caution)
    Observe signage.
    Drive with caution, rough surface in some sections due to Flood Damage
    Last edited: 27 Jul 2015 11:40
    Next Update: 30 Jul 2015

    Information provided by Department of Transport and Main Roads.

  • TORRENS CREEK ARAMAC ROAD

    TORRENS CREEK

    Aramac - Torrens Creek

    Open (with caution)
    Observe signage.
    “OPEN WITH CARE”
    Drive with caution, rough surface in some sections due to flood damage
    Last edited: 27 Jul 2015 11:39
    Next Update: 30 Jul 2015

    Information provided by Department of Transport and Main Roads.

  • PALMWOODS MONTVILLE ROAD

    PALMWOODS

    Reduced to one lane due to slippage between McDonalds Rd and Montville Road. Traffic signals in place top and bottom of range
    Open (with caution)
    Reduced speed limit (40Km/h).
    Last edited: 16 Jul 2015 11:07
    Next Update: 31 Aug 2015

    Information provided by Department of Transport and Main Roads.

  • KENNEDY DEVELOPMENTAL ROAD

    HUGHENDEN

    Hughenden - Flinders Shire Boundary
    Open (with caution)
    Observe signage.
    “OPEN WITH CARE”
    Drive with caution, rough surface in some sections due to flood damage
    Last edited: 27 Jul 2015 11:38
    Next Update: 30 Jul 2015

    Information provided by Department of Transport and Main Roads.

  • ENDEAVOUR VALLEY ROAD

    COOKTOWN

    Isabella Creek and other creeks and crossings.
    Open (with caution)
    Proceed with caution.
    Last edited: 16 Jul 2015 11:47
    Next Update: as conditions change

    Information provided by Department of Transport and Main Roads.

  • GREGORY DEVELOPMENTAL ROAD

    EINASLEIGH

    The Lynd to Einasleigh
    Open (with caution)
    Proceed with caution.
    Last edited: 16 Jul 2015 11:47
    Next Update: as conditions change

    Information provided by Department of Transport and Main Roads.

  • PENINSULA DEVELOPMENTAL ROAD

    LAURA

    Laura to Coen
    Open (with caution)
    Proceed with caution.
    Last edited: 16 Jul 2015 11:47
    Next Update: as conditions change

    Information provided by Department of Transport and Main Roads.

  • PENINSULA DEVELOPMENTAL ROAD

    COEN

    Coen Airport to Weipa
    Open (with caution)
    Do not drive in flood waters.
    Last edited: 14 Jul 2015 09:45
    Next Update: as conditions change

    Information provided by Department of Transport and Main Roads.

  • BURKE DEVELOPMENTAL ROAD

    HOWITT

    Walkers creek to Mareeba shire/Tablelands regional boundary
    Restricted to four wheel drive vehicles only
    Proceed with caution.
    Please take extreme care when travelling, due to sections of road damaged from washouts
    Last edited: 29 Jul 2015 16:03
    Next Update: 01 Aug 2015

    Information provided by Department of Transport and Main Roads.

  • BURKE DEVELOPMENTAL ROAD

    HIGHBURY

    40 km east of Dunbar to Mungana turnoff
    Open (with caution)
    Do not drive in flood waters.
    Last edited: 16 Jul 2015 11:46
    Next Update: as conditions change

    Information provided by Department of Transport and Main Roads.

  • RICHMOND WINTON ROAD

    KYNUNA

    Open (with caution)
    proceed with caution.
    .Last edited: 14 Jul 2015 10:46
    Next update:as conditions change
    Information provided by Department of Transport and Main Roads.

  • MONTO MOUNT PERRY ROAD

    YARROL

    at the Burnett River Bridge
    Closed to all vehicles
    Use alternative route.
    Last edited: 03 Jul 2015 09:21
    Next Update: When condition change.

    Information provided by Department of Transport and Main Roads.

  • KENNEDY HIGHWAY

    UPPER BARRON

    21km from Atherton
    Open (with caution)
    Reduced lanes due to land slip
    Last edited: 16 Jul 2015 11:45
    Next Update: as conditions change

    Information provided by Department of Transport and Main Roads.

  • KENNEDY DEVELOPMENTAL ROAD

    HUGHENDEN

    Hughenden - Winton


    Open (with caution)
    Observe signage.
    Drive with caution, rough surface in some sections due to Flood Damage
    Last edited: 27 Jul 2015 11:37
    Next Update: 30 Jul 2015

    Information provided by Department of Transport and Main Roads.

  • MAHON ROAD

    COOMINYA


    Closed to all vehicles
    use alternative route.

    Last edited: 16 Jun 2015
    Next update:14 Jun 2016 Information provided by Somerset Regional Council via QIT+

  • OBI OBI ROAD

    OBI OBI

    Subject to a 10 tonne GVM limit
    Observe signage.
    Obi Obi Road, Obi Obi – The downhill section of Obi Obi Road westbound between Mapleton and Kenilworth is open to traffic.
    Last edited: 03 Jul 2015 10:00
    Next Update: 31 Jul 2015

    Information provided by Department of Transport and Main Roads.

Sorted By:
  • ROSS RIVER ROAD

    AITKENVALE

    Planned Roadworks Eastbound
    Between Nathan Street and Elizabeth Street.
    Commencing: 15 July 2015 6:30am
    Concluding:15 September 2015, at 5:00pm
    No delays expected. Observe signage.
    Footpath and parking lanes will remain closed for the duration of the works
    Last edited: 17 Jul 2015 10:24
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    AYR

    Planned Roadworks Both Directions
    Various points near Ayr.
    Commencing: 21 July 2015, at 6:00am
    Concluding:31 August 2015, at 6:00pm
    Partial lane closures
    No delays expected. Observe signage.
    Last edited: 31 Jul 2015 09:24
    Information provided by Department of Transport and Main Roads.

  • CHRISTENSENS ROAD

    BALBERRA

    Planned Roadworks Both Directions
    Commencing: 20 May 2015, at 12:35pm
    Concluding:31 August 2015, at 12:00am
    No blockage
    Delays expected. Changed traffic conditions.
    Last edited: 22 Jul 2015 13:39
    Information provided by Department of Transport and Main Roads.

  • BUNDOCK STREET

    BELGIAN GARDENS

    Planned Roadworks Eastbound
    Near Price Street.
    Commencing: 03 August 2015, at 6:00am
    Concluding:05 August 2015, at 6:00pm
    No blockage
    No delays expected. Observe signage.
    Last edited: 31 Jul 2015 17:24
    Information provided by Department of Transport and Main Roads.

  • BUNDOCK STREET

    BELGIAN GARDENS

    Planned Roadworks Both Directions
    Between Taylor Street and Beaufort Street.
    Commencing: 18 June 2015 7:00am
    Concluding:15 October 2015, at 5:00pm
    No blockage
    Delays expected. Observe signage.
    Last edited: 17 Jul 2015 10:25
    Information provided by Department of Transport and Main Roads.

  • BIRKDALE ROAD

    BIRKDALE

    Planned Roadworks
    At Byng Road..
    Commencing: 03 August 2015, at 7:00am
    Concluding:30 September 2015, at 5:00am
    Partial lane closures
    Delays expected. Changed traffic conditions.
    Works will be carried out from early August 2015 to end of September 2015, weather and construction conditions permitting.

    Construction will predominantly be undertaken Monday to Thursday between 7pm and 5am to reduce the impact to surrounding residents and motorists.

    Short traffic delays, lane closures and reduced speed limits can be expected during the works. Traffic control will be in place to ensure the safety of road workers and motorists.
    TMR apologises for any inconvenience these works may cause and appreciates your patience while these important works are carried out.

    Last edited: 29 Jun 2015 10:56
    Information provided by Department of Transport and Main Roads.

  • BIRKDALE ROAD

    BIRKDALE

    Planned Roadworks Northbound
    Birkdale Road, Birkdale.
    Commencing: 17 July 2015, at 7:00am
    Concluding:18 August 2015, at 5:00pm
    One lane closed
    No delays expected. Changed traffic conditions.
    Work involves construction of a turning lane over a length of approx. 100 metres and footpath alterations. Changed traffic conditions may include temporary lane closures, reduced speeds and pedestrian detours.
    #141
    Last edited: 17 Jul 2015 10:35
    Information provided by Department of Transport and Main Roads.

  • DAGUILAR HIGHWAY

    BLACKBUTT

    Planned Roadworks Both Directions
    Between Reservoir Service Road and Sutton Street.
    .
    Commencing: End June 2015, weather permitting
    Concluding:in August 2015, weather permitting
    Partial lane closures
    Delays expected. Allow extra travel time.
    Works will generally be undertaken between 6am and 6pm. Motorists should expect changed conditions and observe all safety signage.
    Last edited: 22 Jun 2015 15:52
    Information provided by Department of Transport and Main Roads.

  • THE RING ROAD

    BOHLE PLAINS

    Planned Roadworks Both Directions
    Townsville Ring Road Section 4
    From Kalynda Chase intersection to Mt Low intersection of the Bruce Highway.
    Commencing: 07 May 2015, at 10:30am
    Concluding:31 May 2017, at 12:00am
    No blockage
    No delays expected. Changed traffic conditions.
    Motorists are advised there will be increased heavy vehicles in the vicinity of Kalynda Parade and Dalrymple Road for the duration of this project which is expected to be completed by mid 2017.
    Survey works will commence from 6 June 2015 between Veales Road to the overtaking lanes just south of the Black River Bridge.
    Last edited: 31 Jul 2015 09:27
    Information provided by Department of Transport and Main Roads.

  • BURNETT BRIDGE

    BUNDABERG CENTRAL

    Planned Roadworks Both Directions
    Commencing: Sunday 26 July 2015, weather permitting
    Concluding:October 2015, weather permitting
    Road closed both directions
    No delays expected. Use alternative route.
    The temporary closure of the Burnett River Bridge between 6am and 5pm are scheduled for, weather permitting on:
    Sunday 26 July 2015
    Sunday 16 August 2015
    Sunday 6 September 2015
    Temporary night time closures of the bridge are schedule for betweeen 8pm and 5am for the next four months until October:
    Week one (starting 2 August) bridge closed Sunday to Thursday
    Week two (starting Sunday 9 August)bridge closed Monday to Thursday
    The weeks will then alternate as above between Sunday to Thursday and Monday to Thursday until October, weather permitting.
    During the closure, a signed detour via the Tallon Bridge will be in place to assist motorists with the changed conditions.
    Transport and Main Roads thanks everyone in advance for their patience and cooperation while these
    important bridge works are underway.
    If you require further information about the works, please contact the Bundaberg office on 1300 728 390
    during business hours, or email bundaberg.office@tmr.qld.gov.au.
    Last edited: 22 Jul 2015 15:16
    Information provided by Department of Transport and Main Roads.

  • BRISBANE ROAD

    BUNDAMBA

    Planned Roadworks Both Directions
    Bergins Hill Road, Mining Street and Agnes Street..
    Commencing: 03 August 2015, at 9:00am
    Concluding:03 September 2015, at 5:00pm
    One lane closed
    Delays expected. Traffic control on scene.
    Improvement works will be occurring at the Brisbane Rd and Mining St intersection, Bundamba. These will be undertaken from August 2015 until late September 2015, weather permitting between 7am - 5pm Monday to Saturday. For more information please contact the Site Foreman on 0488 464 571 or alternatively the Site Engineer on 0400 982 837.
    #140
    Last edited: 17 Jul 2015 10:54
    Information provided by Department of Transport and Main Roads.

  • WEST BURLEIGH ROAD

    BURLEIGH HEADS

    Planned Roadworks All directions
    Electrical maintenance night works at the intersection of West Burleigh Road, James Street and Burleigh Street.
    Commencing: mid-July 2015
    Concluding:early August 2015
    Partial lane closures
    Delays expected. Changed traffic conditions.
    Last edited: 14 Jul 2015 15:23
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    CARDWELL

    Planned Roadworks Both Directions
    Approx 1km south of Five Mile Creek Bridge.
    Commencing: in progress
    Concluding:August 2015
    Lane or lanes reduced
    Unknown traffic impact. Changed traffic conditions.
    Available width 3.5 metres
    Last edited: 10 Jul 2015 11:32
    Information provided by Department of Transport and Main Roads.

  • MITCHELL HIGHWAY

    CHARLEVILLE

    Planned Roadworks Both Directions
    Construction of Angellala Creek Bridge, approximately 30km south of Charleville.
    Commencing: 18 May 2015, between the hours of 6:00am and 6:00pm, 7 days a week.
    Concluding: 20 October 2015, weather permitting.
    No blockage
    No delays expected. Proceed with caution.

    On site During work hours: Reduced speed 40km/hr, No blockage, constuction is isolated from traffic via a Sidetrack, no delays.

    On site After work hours: Reduced speed 60km/hr, No blockage, constuction is isolated from traffic via a Sidetrack, no delays.

    Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au

    Last edited: 28 May 2015 11:13
    Information provided by Department of Transport and Main Roads.

  • ALLAWAH ROAD

    CHUWAR

    Planned Roadworks Both Directions
    Mount Crosby Weir Bridge - changed traffic conditions.
    Commencing: 25 May 2015, at 9:39am
    Concluding:25 May 2017, at 6:00am
    No blockage
    No delays expected. Changed traffic conditions.
    •Traffic conditions along the Mount Crosby Weir Bridge will change from May 2015 as a precaution for the community in the interest of safety.
    •A 9 tonne weight limit has been imposed on Mount Crosby Weir Bridge from 2 May 2015.
    •The weight limit and 20kph speed limit for the bridge are required to protect public safety.
    •Exceptions to the weight limit and speed cannot be made.
    •Any vehicle that exceeds the 9 tonne weight limit should consider an alternative route.
    •Changes to signage will be installed to inform the local community of these changes.
    #106
    Last edited: 25 May 2015 09:42
    Information provided by Department of Transport and Main Roads.

  • SANDGATE ROAD

    CLAYFIELD

    Planned Roadworks Both Directions
    Intersection with Junction Road.
    Commencing: 26 July 2015, at 7:00pm
    Concluding:05 September 2015, at 5:00am
    Lane or lanes reduced
    Delays expected. Use alternative route.
    The Department of Transport and Main Roads will be undertaking water service relocation works as part of a safety improvement upgrade on the Sandgate and Junction Roads intersection, Clayfield .

    Water service relocation are expected to start 26 July 2015 and will be completed by 4 September 2015, between 7pm and 5am, Sunday to Friday, weather and construction conditions permitting. There will be occasional day works, between 9am to 3pm Monday to Friday as needed.

    During investigations, traffic delays, lane closures, moderate noise and reduced speed limits can be expected. Traffic control will be in place to ensure the safety of pedestrians, road workers and motorists.

    Your patience and cooperation is appreciated while these investigated works are underway.

    Last edited: 21 Jul 2015 10:23
    Information provided by Department of Transport and Main Roads.

  • RIVERWAY DRIVE

    CONDON

    Planned Roadworks Westbound
    Between Gouldian Avenue & Village Boulevard.
    Commencing: 5 March 2015 8:00am
    Concluding:31 August 2015, at 6:00pm
    No blockage
    No delays expected. Observe signage.
    Last edited: 31 Jul 2015 09:21
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    COOROY

    Planned Roadworks Both Directions
    Cooroy to Federal (including Black Mountain).
    Commencing: 20 March 2015, at 7:25pm
    Concluding:31 July 2015, at 12:00pm
    Delays expected. Proceed with caution.

    Cudgerie Drive to Sankeys Road
    From 1 March 2015, Bruce Highway traffic diverted onto the new highway lanes between Cudgerie Drive and Black Mountain Range Road, with an 80km/h speed limit in place. The northbound passing lane near Black Mountain Range Road has been partially closed as part of this switch. From April 2015 until late 2015, southbound traffic exiting to Cooroy and Noosa (Exit 230A) is being diverted from the new highway lanes via a side track to Elm Street.

    Cooroy southern interchange to Cudgerie Drive
    Night works will occur on the Bruce Highway between the Bagnalls Road overpass and Elm Street from Sunday 5 July for five nights, weather permitting. Stop/go traffic control will be required between 8pm and 5am. Motorists may experience minor delays.
    The speed limit has been reduced through the Cooroy southern interchange to 70km/h, and just north of the interchange to 80km/h. Motorists may experience minor delays. Traffic changes are in place around the Cooroy southern interchange connection road including single lane closures, signage, traffic controllers and stop-go operations until late 2015. Bridge deck installation for the new Cooroy southern interchange off-ramp has temporarily reduced the clearance height to 5.0m until late 2015.

    From January 2015, northbound highway traffic will share the southbound highway lanes for approximately 1km just south of the Cooroy southern interchange, with single northbound and southbound traffic lanes in operation.

    Vehicles wider than 4m should observe the requirements of their over dimensional permits along this section of the highway. An alternative route is available via the Eumundi exit of the Bruce Highway in the south and Pomona Connection Road in the north. Cooroy can then be reached via the old highway (Eumundi Range Road/Nandroya Road/Myall Street) and Pomona can be reached via Elm Street and Yurol Forest Drive. Please note a maximum 5.0m ground contact width northbound and southbound.

    More details are available on TMR’s Conditions of Operation database at www.tmr.qld.gov.au. Proceed with caution.

    Last edited: 02 Jul 2015 13:29
    Information provided by Department of Transport and Main Roads.

  • WARREGO HIGHWAY

    COTSWOLD HILLS

    Planned Roadworks Both Directions
    From Nugent Pinch Road through to Charlton
    .
    Commencing: 23 February 2015 at 6.00am
    Concluding: 30 June 2016 at 6.00pm weather permitting.
    All lanes affected
    Delays expected. Changed traffic conditions.

    Work Hours: 6 days a week, minor detours and sidetracks in place, reduced speed to 60km/h, portable signals, delays up to 15 minutes and traffic control

    After Hours: Minor detours and sidetracks, reduced speed to 80km/h, portable signals.


    Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au
    Last edited: 06 May 2015 06:44
    Information provided by Department of Transport and Main Roads.

  • PROSTON BOONDOOMA ROAD

    COVERTY

    Planned Roadworks Both Directions
    Between Glencoe Road and Fletchers Road.
    Commencing: early July 2015
    Concluding:Early 2016
    Partial lane closures
    Delays expected. Allow extra travel time.
    Last edited: 24 Jun 2015 11:00
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    COWLEY

    Planned Roadworks Both Directions
    1km north of Liverpool Creek.
    Commencing: in progress
    Concluding:August 2015
    Lane or lanes reduced
    Unknown traffic impact. Changed traffic conditions.
    Available width 3.5 metres
    Last edited: 10 Jul 2015 11:32
    Information provided by Department of Transport and Main Roads.

  • KOGAN CONDAMINE ROAD

    CROSSROADS

    Planned Roadworks Eastbound
    Intersection with Clyne's Road.
    Commencing: 03 August 2015, between the hours of 6:00am and 6:00pm, Monday to Friday.
    Concluding:30 September 2015, weather permitting.
    No blockage
    No delays expected. Changed traffic conditions.

    On site during working hours: Eastbound shoulder works, reduced speed 40km/hr.

    On site during non working hours: Reduced speed 60km/hr.

    Last edited: 29 Jul 2015 12:55
    Information provided by Department of Transport and Main Roads.

  • DECEPTION BAY ROAD

    DECEPTION BAY

    Planned Roadworks Both Directions
    The Department of Transport and Main Roads (TMR) advises that work to improve safety on Deception Bay Road, at the Bruce Highway interchange and Zammit Street intersection.
    Commencing: 22 July 2015, at 7:00am
    Concluding:End of 2015, weather permitting.
    Lane or lanes reduced
    Delays expected. Observe signage.

    The Department of Transport and Main Roads (TMR) advises that work to improve safety on Deception Bay Road, at the Bruce Highway interchange and Zammit Street intersection, will soon be underway.

    This intersection was identified for upgrade due to the high crash rate at each of these locations. Between January 2008 and July 2013, a total of 53 crashes have occurred at these locations combined. To improve safety at the Bruce Highway interchange, TMR will install two dedicated right-turn lanes from Deception Bay Road to the Bruce Highway south and northbound entry ramps. These works will provide fully-controlled right-turn movements and reconfigure the intersection to accommodate the dual right-turning lanes.

    A series of high visibility LED overhead traffic signal lanterns will also be installed at the Zammit Street intersection to improve visibility for eastbound motorists on Deception Bay Road, as well as providing left and right-turn facilities at the caravan park access just west of the Zammit Street intersection, and minor road widening to improve safety for turning motorists.

    Construction is scheduled to commence Wednesday 22 July 2015 with completion expected at the end of 2015, weather permitting. Work will generally be carried out between 7am and 5pm, Monday to Friday; however, occasional night work may also be required.

    This upgrade will be delivered as part of TMR’s Safer Roads Sooner (SRS) program. The program is a key component of the Queensland Government’s commitment to improving road safety through implementing high benefit, cost effective, road engineering treatments that address known and potential crash locations on the state-controlled road network.

    For further information about this work, please contact the Deception Bay Road works hotline on 1800 502 307.
    Last edited: 20 Jul 2015 16:24
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    DEERAGUN

    Planned Roadworks
    Slashing of road reserve on various State-controlled roads.
    Commencing: 27 October 2014, at 6:00am
    Concluding:27 October 2015, at 6:00pm
    No blockage
    No delays expected. Observe signage.
    Last edited: 17 Jul 2015 10:13
    Information provided by Department of Transport and Main Roads.

  • DAWSON HIGHWAY

    DROMEDARY

    Planned Roadworks Both Directions
    Commencing: 31 July 2015 9:28am
    Concluding:11 September 2015, at 6:00pm
    Lane or lanes reduced
    Delays expected. Observe signage.
    Last edited: 31 Jul 2015 09:32
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    DUCKINWILLA

    Planned Roadworks Both Directions
    Near Wongi State Forest, south of Torbanlea.
    Commencing: late April
    Concluding:Late 2015, weather permitting
    Lane or lanes reduced
    Delays expected. Allow extra travel time.
    Works will generally be undertaken from 6am to 6pm, Monday to Saturday. Motorists should expect changed conditions, including reduced speed limits and partial lane closures, while works are underway. For further information, contact Transport and Main Roads on 1300 728 390 during business hours or email bundaberg.office@tmr.qld.gov.au.
    Last edited: 17 Apr 2015 11:57
    Information provided by Department of Transport and Main Roads.

  • ADVENTURE WAY

    EULO

    Planned Roadworks Both Directions
    Approximately 3.2 kilometres east of intersection with Hungerford Road.
    Commencing: 15 June 2015, between the hours of 6:00am and 6:00pm, 7 days a week.
    Concluding: 15 August 2015, weather permitting.
    Single lane in operation
    Delays expected. Changed traffic conditions.

    On Site during working hours: Single lane in operation, Reduced speed 40km/hr, Traffic control with possible delays of up to 5mins. Please proceed with caution.

    On Site after hours: Single lane in operation, Reduced speed 60km/hr, Portable traffic signals with possible delays of up to 5mins. Please proceed with caution.

    Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au

    Last edited: 27 Jul 2015 08:09
    Information provided by Department of Transport and Main Roads.

  • PILKINGTON STREET

    GARBUTT

    Planned Roadworks Both Directions
    Commencing: 28 July 2015, at 9:00am
    Concluding:04 August 2015, at 3:00pm
    Partial lane closures
    Unknown traffic impact. Observe signage.
    Last edited: 31 Jul 2015 09:25
    Information provided by Department of Transport and Main Roads.

  • DALRYMPLE ROAD

    GARBUTT

    Planned Roadworks Both Directions
    Commencing: 20 July 2015, at 6:00am
    Concluding:07 August 2015, at 6:00pm
    Road closed both directions
    No delays expected. Changed traffic conditions.
    Last edited: 31 Jul 2015 09:25
    Information provided by Department of Transport and Main Roads.

  • WOOLCOCK STREET

    GARBUTT

    Planned Roadworks All directions
    Various sections along Woolcock Street, Charters Towers Road and Dalrymple Road will have works associated with NBN installations.
    Commencing: 01 July 7:00am
    Concluding:01 November 2015, at 5:00pm
    Partial lane closures
    Unknown traffic impact. Proceed with caution.
    Works along Woolcock Street between Ingham Road and Mather Street, Charters Towers road between Woolcock Street and Kenilworth Avenue and Dalrymple Road between Banfield Drive and O'Keefe Court. There will be closure of shoulder during these works.
    Last edited: 17 Jul 2015 10:14
    Information provided by Department of Transport and Main Roads.

  • STAPYLTON JACOBS WELL ROAD

    GILBERTON

    Planned Roadworks Both Directions
    Near Sandy Creek, 24 hour work site.
    Commencing: 16 July 2015
    Concluding:early August
    Lane or lanes reduced
    Delays expected. Reduced speed limit (40km/h).
    Last edited: 16 Jul 2015 10:47
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    GLENORCHY

    Planned Roadworks Both Directions
    Between south of Eight Mile Road/Old Gympie Road and north of Seven Mile Road.
    Commencing: late April
    Concluding:late 2015, weather permitting
    Both lanes affected
    Delays expected. Allow extra travel time.
    Works will generally be undertaken between 6am and 6pm, Monday to Saturday. Motorists are advised to expect changed conditions, including reduced speed limits and partial lane closures, while works are underway. For further information, contact Transport and Main Roads on 1300 728 390 during business hours or email bundaberg.office@tmr.qld.gov.au.
    Last edited: 17 Apr 2015 11:57
    Information provided by Department of Transport and Main Roads.

  • CHINCHILA TARA ROAD

    GREENSWAMP

    Planned Roadworks Both Directions
    Various Locations between 1km south of Greenswamp Road to the intersection Kogan Condamine Road.
    Commencing: 03 August 2015, between the hours of 7:00amd and 5:00pm Monday to Friday.
    Concluding: Mid March 2016, weather permitting.
    Single lane in operation
    Delays expected. Changed traffic conditions.

    On site during work hours: Single lane in operation, reduced speed 40km/hr, traffic control with possible delays of up to 15mins, please allow for extra travel time.

    On site out side of work hours: Reduced speeds between 60km/hr and 80km/hr.

    Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au

    Last edited: 31 Jul 2015 11:47
    Information provided by Department of Transport and Main Roads.

  • EIGHTH AVENUE

    HOME HILL

    Planned Roadworks Both Directions
    Commencing: 03 August 2015, at 6:00am
    Concluding:04 September 2015, at 6:00pm
    Road closed both directions
    No delays expected. Use alternative route.
    Detour in place
    Last edited: 31 Jul 2015 17:36
    Information provided by Department of Transport and Main Roads.

  • CHARTERS TOWERS ROAD

    HYDE PARK

    Planned Roadworks All directions
    Charters Towers Road between Woolcock Street and Kenilworth Avenue, along Dalrymple Road between Banfield Drive and O'Keefe Court and along Bruce Highway between Ingham Road and Mather Street.
    Commencing: 18 June 7:00am
    Concluding:15 October 2015, at 5:00pm
    Lane or lanes reduced
    Unknown traffic impact. Observe signage.
    Last edited: 17 Jul 2015 10:21
    Information provided by Department of Transport and Main Roads.

  • WOOLCOCK STREET

    HYDE PARK

    Planned Roadworks Both Directions
    Installation of new water mains on various state controlled roads - Woolcock Street, Ross River Road, Bowen Road and Charters Towers Road.
    Commencing: 15 May 2015, at 7:00am
    Concluding:30 September 2015, at 2:00pm
    Partial lane closures
    Unknown traffic impact. Changed traffic conditions.
    Last edited: 17 Jul 2015 10:13
    Information provided by Department of Transport and Main Roads.

  • MOGGILL ROAD

    INDOOROOPILLY

    Planned Roadworks Both Directions
    Between Rylatt Street and Rennies Road.
    Commencing: 26 July 2015, at 8:00pm
    Concluding:13 September 2015, at 5:00am
    Partial lane closures
    Delays expected. Changed traffic conditions.
    Motorists are advised that temporary lane closures on Moggill Road east and westbound will be required between Rylatt Street and Rennies Road, Indooroopilly, from Sunday 31 May to Friday 12 June 2015, weather permitting.
    Lane restrictions will also be in place on the Western Freeway southbound on and off-ramps. Access through Moggill Road will be maintained with contraflow traffic control.
    Lane closures, signage and traffic controllers will be set up from 8pm on the eastbound and westbound lanes. Due to increased traffic from late night shopping, eastbound traffic control will not be set up until 9pm on Thursday nights.
    Police and traffic controllers will be directing traffic at the intersections of Moggill Road and Russell Terrace, and the southbound Western Freeway on and off-ramps. Traffic controllers will be in place to maintain access for residents from 474 to 502 Moggill Road. Minor delays may be expected. For further information please call 13 QGOV (13 7468)
    #145
    Last edited: 24 Jul 2015 12:10
    Information provided by Department of Transport and Main Roads.

  • MOGGILL ROAD

    INDOOROOPILLY

    Planned Roadworks All directions
    Commencing: 01 July 2015, at 7:00pm
    Concluding:10 November 2015, at 5:00am
    All lanes affected
    Delays expected. Changed traffic conditions.
    Works will be carried out from early July 2015 until late October 2015, weather and construction conditions permitting.

    Construction will predominantly be undertaken at night from Sunday to Friday between 7.00pm and 5.00am due to traffic volumes on Moggill Road. Some works will also be undertaken from time to time, during the day or on weekends for the safety of road workers and motorists.

    Motorists may experience short traffic delays and lane closures during the works. There will also be temporary reductions in the speed limit. Traffic control will be in place to ensure the safety of road workers and motorists. There will be some construction noise, lighting and dust associated with these works. However, TMR will make every effort to minimise disruptions throughout the duration of this project.

    TMR apologises for any inconvenience these works may cause to residents and motorists and appreciates your patience while these important safety works are carried out.

    Last edited: 29 Jun 2015 18:25
    Information provided by Department of Transport and Main Roads.

  • MOGGILL ROAD

    INDOOROOPILLY

    Planned Roadworks Southbound
    Moggill Road, Indooroopilly,
    Western Freeway on and off-ramps at Moggill Road, Indooroopilly
    Russell Terrace, Indooroopilly
    Centenary Bikeway
    .
    Commencing: 10 May 2015, at 8:00pm
    Concluding:25 May 2016, at 5:00am
    Road closed single direction
    Delays expected. Changed traffic conditions.
    Motorists are advised that the southbound on-ramp to the Western Freeway from Moggill Road will be temporarily closed from 8pm to 5am, Sunday to Thursday nights from Sunday 10 May to Thursday 24 May, 2015, weather permitting, as part of works for the Moggill Road cycle bridge.During this closure, a detour will be in place for motorsists wishing to travel south on the Centenary Motorway from Moggill Road. Motorists will continue on Moggill Road, detouring onto Fig Tree Pocket Road before entering the Motorway southbound at Fig Tree Pocket. Signage will be in place to guide motorists during this detour.
    Traffic management including reduced speed limits and signage will be in place during the closure. Minor delays may be expected. For further information please call 13 QGOV (13 7468)

    Last edited: 06 May 2015 11:53
    Information provided by Department of Transport and Main Roads.

  • MOGGILL ROAD

    INDOOROOPILLY

    Planned Roadworks Both Directions
    Commencing: 10 April 2015, at 10:00am
    Concluding:01 February 2016, at 5:00pm
    No blockage
    No delays expected. Changed traffic conditions.
    Motorists are advised that construction of the Moggill Road cycle bridge will commence in April 2015 and will continue through to early 2016.

    Traffic management including reduced speed limits, traffic controllers and devices will be in place where required. To ensure the safety of motorists and workers, some traffic control including shoulder and lane closures will be required at times.

    For further information about the project, please call 13QGOV.

    Last edited: 10 Apr 2015 12:51
    Information provided by Department of Transport and Main Roads.

  • VICTORIA MILL ROAD

    INGHAM

    Planned Roadworks Both Directions
    Construction works along Forest Beach Road.
    Commencing: 07 April 6:00am
    Concluding:30 November 2015, at 6:00pm
    No blockage
    No delays expected. Changed traffic conditions.
    Last edited: 17 Jul 2015 10:16
    Information provided by Department of Transport and Main Roads.

  • ALBERT STREET

    INGLEWOOD

    Planned Roadworks Eastbound
    Footpath works on Albert Street between Alice Street and Elizabeth.
    Commencing: 22 July 2015, between the hours if approximately 7:30am and 5:30pm, Monday to Friday.
    Concluding: 13 August 2015, weather permitting.
    No blockage
    No delays expected. Proceed with caution.

    On site during working hours: Eastbound footpath works, shoulder closed.

    On site outside of work hours: Eastbound footpath works, shoulder closed.

    Last edited: 22 Jul 2015 12:27
    Information provided by Department of Transport and Main Roads.

  • HUTTON STREET

    INJUNE

    Planned Roadworks Both Directions
    Intersection Carnarvon Highway, Hutton Street Injune and Injune to Taroom Road, Third avenue Injune.
    Commencing: 14 July 2015, between the hours of 6:00am and 6:00pm, 7 days a week.
    Concluding: 01 September 2015, weather permitting
    Single lane in operation
    Delays expected. Changed traffic conditions.

    On site during working hours 6:00am to 6:00pm:- Single lane in operation, reduced speed 40km/h, traffic control with possible delays of up to 15mins, please allow for extra travel time

    On site after hours: Single lane in operation, reduces speed 60km/h, portable traffic signals with possible delays of up to 5mins.

    Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au

    Last edited: 03 Jul 2015 10:12
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    KALLANGUR

    Planned Roadworks Both Directions
    The Department of Transport and Main Roads (TMR) would like to advise you that work will begin on Monday 23 February 2015 on Stage 2 of the Kallangur Noise Barrier project.
    Commencing: 24 February 2015, at 2:40pm
    Concluding:Mid 2015
    Unknown traffic impact. Traffic control on scene.

    The Department of Transport and Main Roads (TMR) would like to advise you that work will begin on Monday 23 February 2015 on Stage 2 of the Kallangur Noise Barrier project.

    TMR completed on-site noise testing along the Bruce Highway between Pine Rivers Bridge and Boundary Road. The results identified that the noise barriers located between Orchid Avenue and Duffield Road to the west of the highway and along the boundary fence of Kerr Road to the east of the highway in Kallangur require upgrading.

    These noise barriers are being upgraded in two stages. Stage 1 of the project was constructed by Downer Mouchel and involved replacing wooden barriers on the western side of the Bruce Highway between Duffield Road and Jillian Street in Kallangur with 3.6 metre high concrete panels. This stage was completed in late 2014.

    The construction contract for Stage 2 has been awarded to Epoca Constructions, and works involve upgrading the existing timber barrier on the western side of the Bruce Highway between Orchid Avenue and Duffield Road to concrete panels, as well as installing a new barrier on the eastern side of the highway behind the existing barrier near Kerr Road.

    Work over the coming weeks will involve the removal of vegetation on either side of the existing barrier to allow for access and a clear and safe project site, followed the removal of the existing barriers and post hole digging and construction for the new barriers. Full construction of the new barriers is expected to be completed by mid-2015, weather permitting.

    Nearby residents may experience some minor construction noise and while works are occurring near their property. The department will endeavour to progress the works as quickly as possible and minimise any inconvenience to these residents.

    For further information about the project, please contact Project Manager Geoff Bates on 5451 7055. Further information about the project can be found at www.tmr.qld.gov.au under projects ‘Kallangur noise barrier project’. For up-to-date information on traffic disruptions please visit www.131940.qld.gov.au or call 13 19 40.

    Last edited: 24 Feb 2015 14:33
    Information provided by Department of Transport and Main Roads.

  • BRINSMEAD KAMERUNGA ROAD

    KAMERUNGA

    Planned Roadworks All directions
    Intersection of Harley Street.
    Commencing: in progress
    Concluding:August 2015
    Lane or lanes reduced
    Unknown traffic impact. Changed traffic conditions.
    Last edited: 13 Jul 2015 13:01
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    KENNEDY

    Planned Roadworks Both Directions
    Yellow Waterholes Creek to Dallachy Creek.
    Commencing: in progress
    Concluding:end August 2015
    Lane or lanes reduced
    Unknown traffic impact. Changed traffic conditions.
    Last edited: 13 Jul 2015 12:52
    Information provided by Department of Transport and Main Roads.

  • CAPTAIN COOK HIGHWAY

    KEWARRA BEACH

    Planned Roadworks All directions
    Kewarra Beach Roundabout.
    Commencing: in progress
    Concluding:end July 2015
    Lane or lanes reduced
    Unknown traffic impact. Changed traffic conditions.
    Last edited: 10 Jul 2015 11:27
    Information provided by Department of Transport and Main Roads.

  • DAWSON HIGHWAY

    KIN KORA

    Planned Roadworks All directions
    Kin Kora roundabout.
    Commencing: 12 May 2015, at 11:58am
    Concluding:29 January 2016, at 6:00pm
    Partial lane closures
    Delays expected. Changed traffic conditions.
    Works to upgrade the Dawson Highway / Philip Street intersection are underway. There will be not traffic impacts during daytime hours however lane closures will occur at night. Traffic control will be in place.
    Last edited: 12 May 2015 11:59
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    KOUMALA

    Planned Roadworks All directions
    Shoulder sealing and wide centre line treatment to various sections between Koumala and Sarina on the Bruce Highway.
    Commencing: 21 July 2015, at 6:00am
    Concluding:04 November 2015, at 5:00pm
    Partial lane closures
    Delays expected. Observe signage.
    Last edited: 14 Jul 2015 11:10
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    KYBONG

    Planned Roadworks Both Directions
    Between Woondum and Venardos Avenue intersection.
    Commencing: Monday 27 July 2015, weather permitting
    Concluding:Mid-2016, weather permitting
    No blockage
    Delays expected. Changed traffic conditions.
    Cooroy to Curra - Section C: Traveston to Woondum early works underway between Woondum and Venardos Avenue.
    Expect changed traffic conditions, including speed reductions. Excess dimension vehicle restrictions - lane widths reduced to 3.25m.
    Last edited: 23 Jul 2015 16:27
    Information provided by Department of Transport and Main Roads.

  • PARADISE ROAD

    LARAPINTA

    Planned Roadworks Northbound
    Commencing: 17 July 2015, at 11:00am
    Concluding:30 August 2015, at 5:00pm
    Lane or lanes reduced
    Delays expected. Changed traffic conditions.
    Road widening works are occurring on Radius Drive and Paradise Road, Larapinta between 6am and 6pm daily in the months of July and August. In this time speed restrictions and partial lane closures may occur however we expect very minimal disruption to day to day traffic. For more information, contact the project team 07 3844 3919
    Last edited: 17 Jul 2015 10:57
    Information provided by Department of Transport and Main Roads.

  • GORDON STREET EXIT

    MACKAY

    Planned Roadworks All directions
    Showgrounds and Shakespeare Street Intersection upgrades
    Changed traffic conditions.
    Commencing: 21 April 2015, at 3:55pm
    Concluding:31 October 2015, at 12:00am
    Partial lane closures
    Delays expected. Proceed with caution.
    Last edited: 21 Apr 2015 15:56
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    MACKAY

    Planned Roadworks All directions
    Showgrounds and Shakespeare Street Intersection upgrades
    Changed traffic conditions.
    Commencing: 21 April 2015, at 3:53pm
    Concluding:31 October 2015, at 12:00am
    Partial lane closures
    Delays expected. Changed traffic conditions.
    Last edited: 21 Apr 2015 15:54
    Information provided by Department of Transport and Main Roads.

  • SHAKESPEARE STREET

    MACKAY

    Planned Roadworks All directions
    Showgrounds and Shakespeare Street Intersection upgrades
    Changed traffic conditions.
    Commencing: 21 April 2015, at 3:50pm
    Concluding:31 October 2015, at 12:00am
    Partial lane closures
    Delays expected. Observe signage.
    Last edited: 21 Apr 2015 15:50
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    MCDESME

    Planned Roadworks Both Directions
    Burdekin Bridge - Home Hill
    Maintenance works.
    Commencing: 05 August 2015, at 9:00am
    Concluding:03 September 2015, at 2:45pm
    Partial lane closures
    Delays expected. Changed traffic conditions.

    Motorists are advised that maintenance works will be completed on the Burdekin Bridge, Home Hill between the hours of 9.00am to 2.45pm on the following dates:

    05 August - 07 August 2015
    18 August - 21 August 2015
    25 August - 28 August 2015
    31 August - 03 September 2015

    Speed restrictions and changed traffic conditions including single lane closures and stop/go controls will be in place. Motorists can expect minor delays. The Department thanks motorists for their patience and cooperation while these works are being completed.
    Last edited: 31 Jul 2015 09:28
    Information provided by Department of Transport and Main Roads.

  • AYR DALBEG ROAD

    MCDESME

    Planned Roadworks Both Directions
    Commencing: 01 June 2015, at 7:00am
    Concluding:14 August 2015, at 6:00pm
    Partial lane closures
    No delays expected. Observe signage.
    Last edited: 17 Jul 2015 10:14
    Information provided by Department of Transport and Main Roads.

  • LEICHHARDT HIGHWAY

    MILES

    Planned Roadworks Both Directions
    Intersection Fairymeadow Road.
    Commencing: 22 July 2015, between the hours of approximately 7:00am and approximately 5:00pm. 7 days a week.
    Concluding: 15 August 2015, weather permitting.
    Both lanes affected
    Delays expected. Changed traffic conditions.

    On site during working hours: Speed reduces 60km/hr, traffic control with possible delays of 5mins.

    On site outside of work hours: Return to normal traffic conditions.

    Last edited: 22 Jul 2015 08:21
    Information provided by Department of Transport and Main Roads.

  • DALRYMPLE ROAD

    MOUNT LOUISA

    Planned Roadworks Eastbound
    Near Banfield Drive roundabout.
    Commencing: 21 April 2015, at 6:00am
    Concluding:04 August 2015, at 6:00pm
    Partial lane closures
    Unknown traffic impact. Observe signage.
    Last edited: 17 Jul 2015 10:15
    Information provided by Department of Transport and Main Roads.

  • DALRYMPLE ROAD

    MOUNT LOUISA

    Planned Roadworks
    Various locations along Woolcock Street and Dalrymple Road.
    Commencing: 09 February 2015, at 7:00am
    Concluding:09 August 2015, at 6:00pm
    No blockage
    Unknown traffic impact. Observe signage.
    Last edited: 17 Jul 2015 10:12
    Information provided by Department of Transport and Main Roads.

  • CENTENARY HIGHWAY

    MOUNT OMMANEY

    Planned Roadworks Inbound
    On Ramp Upgrade .
    Commencing: 06 July 2015, at 7:00pm
    Concluding:27 November 2015, at 5:00am
    Partial lane closures
    Delays expected. Changed traffic conditions.
    The Department of Transport and Mains Roads (TMR) will be carrying out road works to improve safety for traffic using the inbound on-ramp of the Centenary Highway in the vicinity of the Mt Ommaney Shopping center.
    The Works are expected to be carried out from early July 2015 to late 2015 from Sunday to Friday nights between 7pm and 5am.
    During construction, the following changed conditions will apply
    Temporary lane closures, Reduced speed limit's, Traffic controllers and Signage indication changed conditions.
    Please follow the directions of the signage and traffic controllers and drive carefully through the work zone.
    For more general information
    Phone:1800 045 348 or
    Email: metropolitanregion@tmr.qld.gov.au
    Last edited: 02 Jul 2015 16:16
    Information provided by Department of Transport and Main Roads.

  • BEAUDESERT BEENLEIGH ROAD

    MOUNT WARREN PARK

    Planned Roadworks Both Directions
    Nightworks between Mt Warren Boulevard and Milne Street roundabout from Wednesday 29 July 2015 to early September 2015.
    Commencing: 29 July 2015, at 8:00pm
    Concluding:10 September 2015, at 5:00am
    Partial lane closures
    Unknown traffic impact. Observe signage.
    Please drive with care and watch out for roadwork signage and speed reduction.
    Last edited: 28 Jul 2015 15:15
    Information provided by Department of Transport and Main Roads.

  • ROSS RIVER ROAD

    MUNDINGBURRA

    Planned Roadworks Both Directions
    Between DeCourcey Street and Water Street, minor delays can be expected.
    Commencing: 01 August 2015, at 8:00am
    Concluding:03 August 2015, at 6:00pm
    Lane or lanes reduced
    Delays expected. Observe signage.
    Last edited: 31 Jul 2015 14:47
    Information provided by Department of Transport and Main Roads.

  • ROSS RIVER ROAD

    MUNDINGBURRA

    Planned Roadworks Westbound
    Between Mango Avenue and O'Reilly Street.
    Commencing: 20 July 2015, at 6:30am
    Concluding:14 August 2015, at 5:00pm
    No delays expected. Observe signage.
    Last edited: 31 Jul 2015 09:26
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    NORTH LAKES

    Planned Roadworks Southbound
    Works will commence on the Anzac Avenue southbound on-ramp to the Bruce Highway as part of the Bruce Highway Managed Motorway Project.
    Commencing: 18 September 2014, at 5:45pm
    Concluding:Mid 2015
    Lane or lanes reduced
    Delays expected. Traffic control on scene.
    Last edited: 19 Sep 2014 12:01
    Information provided by Department of Transport and Main Roads.

  • EYRE STREET

    NORTH WARD

    Planned Roadworks Both Directions
    Commencing: 30 April 2015, at 7:00am
    Concluding:01 September 2015, at 5:00pm
    Partial lane closures
    No delays expected. Observe signage.
    Last edited: 31 Jul 2015 09:26
    Information provided by Department of Transport and Main Roads.

  • GATEWAY MOTORWAY

    NUDGEE

    Planned Roadworks Both Directions
    Commencing: 02 June 2015, at 8:00pm
    Concluding:31 August 2015, at 5:00am
    Partial lane closures
    Delays expected. Allow extra travel time.
    Night Works are required on the Gateway Motorway between Southern Cross Way and the Bicentennial Road exit between 02/06/2015 and 31/08/2015.
    #112
    Last edited: 02 Jun 2015 12:15
    Information provided by Department of Transport and Main Roads.

  • CARNARVON HIGHWAY

    ORANGE HILL

    Planned Roadworks Both Directions
    Intersection Euthella Road and Knayers Road.
    Commencing: 06 July 2015, between the hours of 6:00am and 6:00pm, Monday to Friday.
    Concluding: 28 August 2015, weather permitting
    Single lane in operation
    Delays expected. Changed traffic conditions.

    On site during workin hours 6:00am to 6:00pm:- Single lane in operation, reduced speed 40km/h, portable traffic signals with possible delays of up to 5mins.

    On site after hours: Reduced speed 60km/hr

    Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au

    Last edited: 03 Jul 2015 10:38
    Information provided by Department of Transport and Main Roads.

  • GOLD COAST HIGHWAY

    PALM BEACH

    Planned Roadworks Both Directions
    Commencing: late June 2015
    Concluding:late 2015
    Lane or lanes reduced
    No delays expected. Changed traffic conditions.
    Installation of street lighting from south of the Thrower Drive intersection to Currumbin Creek bridge.
    Last edited: 09 Jun 2015 12:23
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    PORT CURTIS

    Planned Roadworks Both Directions
    Bruce Highway - Egans Hill to Yeppen Roundabout.
    Commencing: 10 April 10:29am
    Concluding:31 March, at 12:00am
    No delays expected. Changed traffic conditions.
    Construction has commenced on the $296 million Yeppen South project between Egans Hill and Yeppen roundabout, south of Rockhampton.

    Speed restrictions are in place.
    Last edited: 10 Apr 2014 10:30
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    PROSERPINE

    Planned Roadworks Both Directions
    Works to take place 40km - 43km north of Proserpine..
    Commencing: 01 July 2015, at 12:00am
    Concluding:28 October 2015, at 12:00am
    Partial lane closures
    Delays expected. Traffic control on scene.
    The works are to extend the wide of 3 culverts.
    Last edited: 30 Jun 2015 13:45
    Information provided by Department of Transport and Main Roads.

  • DALBY KOGAN ROAD

    RANGES BRIDGE

    Planned Roadworks Both Directions
    Approximatly between intersection with Old Warrego Highway to just west of intersection with Leahy's Road .
    Commencing: 15 July 2015, between the hours of 6:00am and 6:00pm, Monday to Friday.
    Concluding: 23 October 2015, weather permiting
    Single lane in operation
    Delays expected. Changed traffic conditions.

    On site during working hours FROM 24 JULY 2015 to 23 OCTOBER 2015: Single lane in operation, portable traffic signals with possible delays of up to 5mins, reduced speed 40km/hr

    On site after working hours FROM 24 JULY to 23 OCTOBER 2015: Single lane in operation, portable traffic signals with possible delays of up to 5mins, Reduced speed 60km/hr.

    Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au

    Last edited: 30 Jul 2015 10:02
    Information provided by Department of Transport and Main Roads.

  • KENNEDY HIGHWAY

    RAVENSHOE

    Planned Roadworks Both Directions
    From Millstream Bridge to Millstream Falls Road. Rough surface. Drive with care.
    Commencing: in progress
    Concluding:August 2015
    All lanes affected
    Delays expected. Reduced speed limit (60km/h).
    Last edited: 10 Jul 2015 11:30
    Information provided by Department of Transport and Main Roads.

  • GEORGE STREET

    ROCKHAMPTON CITY

    Planned Roadworks All directions
    Traffic signal upgrade at the George St / Denham St intersection.
    Commencing: 18 May 2015 6:00am
    Concluding:07 August 2015, at 6:00pm
    Partial lane closures
    Delays expected. Traffic control on scene.
    Day and night works.
    Last edited: 30 Jul 2015 09:15
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    STUART

    Planned Roadworks
    Various low impact areas around Townsville.
    Commencing: 19 February 2015, at 7:00am
    Concluding:21 March 2016, at 6:00pm
    Partial lane closures
    No delays expected. Observe signage.
    Last edited: 30 Jul 2015 09:28
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    STUART

    Planned Roadworks Both Directions
    Bruce Highway Upgrade (Vantassel to Cluden) - Highway Duplication.
    Commencing: 09 October 2013, at 9:00am
    Concluding:Late 2015
    Partial lane closures
    Delays expected. Changed traffic conditions.
    The Bruce Highway Upgrade (Vantassel to Cluden) project is now entering its final stages of completion. Work is progressing well with the majority of the works at Stuart Drive accomplished.

    The last few months has seen a lot of activity towards the northern end of the project site, and the Department of Transport and Main Roads (TMR) can now confirm that major works will be completed by the end of September 2015.

    Important works across the Vantassel to Cluden project include:

    From Zinc Avenue to Stuart Creek Bridge
    Motorists are now able to travel along two lanes of traffic in both directions, speed and lane restrictions may occur from time to time to allow for finalisation works on the centre medians and road shoulders. These temporary lane closures will provide a safe environment for work crews and motorists. Once all works are finalised, the 80km/hr speed limit will apply throughout this section.

    Hunter Street signalised intersection
    During the past couple of weeks motorists have also become acquainted with the new Hunter Street traffic lights. Some fine-tuning will continue to occur during the next couple of weeks.

    From Stuart Creek Bridge to Lakeside Drive
    It is anticipated that both northbound and southbound signals at Lakeside Drive will be operational from Friday 31 July 2015.

    Landscaping, drainage, signage and other finalisation works will continue for the next month in this section. Lane closures and speed restrictions will remain in place throughout this area to ensure the safety of our workers and motorists.

    From Lakeside Drive to Cluden Drive
    From Friday 31 July 2015, all motorists using Stuart Drive will be diverted to the new permanent alignment, therefore the Bruce Highway and Stuart Drive intersection will operate under the new dual traffic signals. During the following weeks, TMR’s Traffic Management Centre will monitor the intersection and fine-tune the light sequencing.

    The temporary roundabout at Cluden Drive will be removed and as previously advised in project updates, due to the split dual lane carriageways, Newton Street will change to a left in / left out configuration. This new permanent arrangement will permit U-turn manoeuvres at the Macarthur Drive / Melton Black intersection, and the Bruce Highway and Stuart Drive intersection. Alternate access to Stuart Drive and the Bruce Highway from Newton Street will be via Edison Street, Wulguru.

    Pedestrian movements will also be moved over to the permanent arrangement from Friday 31 July 2015. Pedestrians will be directed to the new signalised pedestrian facilities. Green cycle lanes through the new intersections will be progressively painted over the next month.

    In addition, the following activities will be occurring in this area:

    1. Decommissioning and removal of the northbound side-track between Lakeside Drive and Stuart Drive
    2. Final road pavement works continues for the remainder of this week
    3. Works on the centre medians, concreting and lighting works
    4. Landscaping, drainage, signage and other finalisation works will also continue
    5. Periodic lane closures and speed restrictions will be in place as required to ensure the safety of our workers and motorists

    Other information
    Linemarking crews will be working night shifts to finalise linemarking throughout the project site and again lane and speed restrictions will be in place
    Last edited: 30 Jul 2015 09:30
    Information provided by Department of Transport and Main Roads.

  • MAINS ROAD

    SUNNYBANK

    Planned Roadworks Both Directions
    To Calam Road.
    Commencing: 08 June 2015, at 7:00am
    Concluding:30 December 2015, at 5:00pm
    Partial lane closures
    Delays expected. Changed traffic conditions.
    What to expect during these works:
    * changed traffic conditions along Mains and Beaudesert Roads
    * construction vehicles and plant will be operating in the area and residents and businesses may notice increased noise during work hours
    * Stop and go traffic controllers (short delays may occur)

    The standard work hours for the project are 7am to 5pm, Monday to Saturday, weather and construction conditions permitting.
    If you require further information on this project, please contact the Project Team on 3066 1309 or by email metropolitanregion@tmr.qld.gov.au during business hours.
    Alternatively, please contact the Department of Transport and Main Roads on 13QGOV (13 74 68) during business hours.
    For up-to-date information on road closures and traffic conditions across Queensland, please visit www.131940.qld.gov.au or call 13 19 40.
    For up-to-date passenger information please visit translink.com.au or call 13 12 30 anytime.


    #118

    Last edited: 05 Jun 2015 18:21
    Information provided by Department of Transport and Main Roads.

  • STANHILL DRIVE

    SURFERS PARADISE

    Planned Roadworks Both Directions
    Power pole replacement
    Thursday 13 August to Wednesday 19 August 2015 at 7am to 3pm.
    Commencing: 13 August 2015 7:00am
    Concluding:19 August 2015, at 3:00pm
    Road closed both directions
    Delays expected. Observe signage.
    Last edited: 31 Jul 2015 14:28
    Information provided by Department of Transport and Main Roads.

  • TAMBORINE MOUNTAIN ROAD

    TAMBORINE

    Planned Roadworks Both Directions
    Roadworks between Nieuwenburg Place and Beaudesert-Beenleigh Road roundabout between 6.30am and 6pm.
    Commencing: 23 June 6:00am
    Concluding:26 November 2015, at 5:00pm
    Partial lane closures
    No delays expected. Changed traffic conditions.
    Roadworks between Nieuwenburg Place and Beaudesert-Beenleigh Road roundabout between 6.30am and 6pm
    Last edited: 23 Jun 2015 10:20
    Information provided by Department of Transport and Main Roads.

  • THURINGOWA DRIVE

    THURINGOWA CENTRAL

    Planned Roadworks All directions
    Various locations along Thuringowa Drive. Works will take place along the media strip.
    Commencing: 20 July 2015 7:00am
    Concluding:20 October 2015, at 5:00pm
    Partial lane closures
    Unknown traffic impact. Reduced speed limit (40km/h).
    Last edited: 31 Jul 2015 09:21
    Information provided by Department of Transport and Main Roads.

  • RIVERWAY DRIVE

    THURINGOWA CENTRAL

    Planned Roadworks Both Directions
    Commencing: 10 October 2014, at 7:00am
    Concluding:31 December 2015, at 5:00pm
    No blockage
    Unknown traffic impact. Observe signage.
    Last edited: 17 Jul 2015 10:13
    Information provided by Department of Transport and Main Roads.

  • RUSSELL STREET

    TOOWOOMBA CITY

    Planned Roadworks Both Directions
    Russell Street converting from One Way traffic to Two Way Traffic as of the 16 August 2015.
    Commencing: 16 August 2015
    Concluding: NO end date: Permanent Change
    No blockage
    No delays expected. Changed traffic conditions.
    Last edited: 29 Jul 2015 13:25
    Information provided by Department of Transport and Main Roads.

  • ARAMAC TORRENS CREEK ROAD

    TORRENS CREEK

    Planned Roadworks Both Directions
    Commencing: 01 August 2015, at 6:00am
    Concluding:15 August 2015, at 12:00am
    No blockage
    No delays expected. Reduced speed limit (60km/h).
    Motorists are to be aware that works are being undertaken to put new pipe culverts in place on the Aramac Torrens Creek Road.

    Side tracks will be in place so there are no delays expected, however motorists are advised to reduce speed to 60km/hr and obey all signage.
    Last edited: 10 Jul 2015 15:42
    Information provided by Department of Transport and Main Roads.

  • DENHAM STREET

    TOWNSVILLE CITY

    Planned Roadworks Southbound
    Commencing: 09 July 2015, at 8:00am
    Concluding:14 September 2015, at 6:00pm
    Partial lane closures
    Unknown traffic impact. Observe signage.
    Last edited: 17 Jul 2015 10:12
    Information provided by Department of Transport and Main Roads.

  • STONE RIVER ROAD

    TREBONNE

    Planned Roadworks Both Directions
    Between Rankin Street and Kehls Road.
    Commencing: 20 July 2015 7:00am
    Concluding:31 August 2015, at 4:00pm
    Partial lane closures
    Unknown traffic impact. Changed traffic conditions.
    Last edited: 31 Jul 2015 09:27
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    TULLY

    Planned Roadworks Both Directions
    Near Banyan Creek.
    Commencing: in progress
    Concluding:August 2015
    Lane or lanes reduced
    Unknown traffic impact. Changed traffic conditions.
    Available width 3.5 metres
    Last edited: 10 Jul 2015 11:32
    Information provided by Department of Transport and Main Roads.

  • WOOLCOCK STREET

    WEST END

    Planned Roadworks
    Various Roads within Townsville region.
    Commencing: 12 March 2015, at 6:00am
    Concluding:09 March 2016, at 3:00pm
    No blockage
    No delays expected. Observe signage.
    Last edited: 17 Jul 2015 10:11
    Information provided by Department of Transport and Main Roads.

  • MOUNT GRAVATT CAPALABA ROAD

    WISHART

    Planned Roadworks Both Directions
    Mt Gravatt Capalaba Road, Wishart, between Broadwater and Gardner/Mt Petrie Roads.
    Gateway Motorway on and off ramps, Mackenzie.
    Commencing: 12 May 2014, at 1:00pm
    Concluding:31 December 2015, at 5:00am
    Lane or lanes reduced
    Delays expected. Changed traffic conditions.
    Motorists are advised that construction of Gateway Upgrade South Stage 2a (Mt Gravatt Capalaba Road) commenced in April 2014 and will continue through to late 2015, weather and construction conditions permitting.
    The Australian Government and Queensland Government are jointly funding the upgrade of Mt Gravatt-Capalaba Road (Broadwater to Gardner Road) as part of the second stage of Gateway Upgrade South projects.
    Bridge duplication works and general road construction activities will be carried out Monday to Saturday between 7am and 5pm.
    Nightworks and temporary lane closures, on Mount Gravatt-Capalaba Road, Wishart and Gateway Motorway on and off-ramps, Mackenzie will be required 8pm to 5am up to 5 nights per week and may also occur off-peak during the day.
    Traffic management including reduced speed limits, traffic controllers and devices will be in place to guide motorists where required. During construction, minor traffic delays and some noise, dust and vibration may be experienced. The project team will endeavour to minimise impacts where possible.
    Please slow down – roadwork safety is your responsibility too.
    For further information contact the project team on 1800 799 686.
    A map and further details of this project can be found at www.tmr.qld.gov.au/gatewayupgradesouth.
    #128

    Last edited: 15 Sep 2014 04:28
    Information provided by Department of Transport and Main Roads.

  • TAMBORINE OXENFORD ROAD

    WONGAWALLAN

    Planned Roadworks Both Directions
    Stop/slow traffic control near Hayes Road weekdays between 6.30am and 5pm.
    Commencing: 20 May 6:30am
    Concluding:30 September 2015, at 5:00pm
    Limited to one lane
    Delays expected. Allow extra travel time.
    Last edited: 20 May 2015 16:29
    Information provided by Department of Transport and Main Roads.

  • BUNYA HIGHWAY

    WOOROOLIN

    Planned Roadworks Both Directions
    Just north of Wooroolin.
    Commencing:
    Concluding:July 2015, weather permitting
    Partial lane closures
    Delays expected. Allow extra travel time.
    Last edited: 24 Jun 2015 10:51
    Information provided by Department of Transport and Main Roads.

  • MONTO MOUNT PERRY ROAD

    YARROL

    Planned Roadworks Both Directions
    Between the Burnett Highway and Kerwee Road.
    Commencing: late January
    Concluding:late 2015, weather permitting
    Road closed both directions
    No delays expected. Allow extra travel time.
    Works to seal three sections of Monto-Mount Perry Road, between the Burnett River and Eastern Creek, are underway. A full road closure is in place between the Burnett Highway and Kerwee Road, and all through traffic will be detoured via Kerwee Road while works are underway. Access will strictly be provided for local traffic only. Motorists should allow additional travel time while using the detour. We apologise for any inconvenience this may cause, and thank you for your patience and cooperation. For further information, contact Transport and Main Roads in Bundaberg on 1300 728 390 during business hours, or email bundaberg.office@tmr.qld.gov.au
    Last edited: 10 Feb 2015 14:37
    Information provided by Department of Transport and Main Roads.

Sorted By:
  • FLINDERS STREET

    TOWNSVILLE CITY

    Special Event Both Directions
    Between Denham Street and Stokes Street. Sundays 6am to 3pm.
    Commencing: 02 August, at 6:00am
    Concluding:17 June 2021, at 3:00pm
    Unknown traffic impact. Use alternative route.
    Flinders Street between Denham Street and Stokes Street is where a planned event will be occurring every Sunday. This event will commence every Sunday at 6:00am and finish up the same day on 3:00pm. A full closure of Flinders Street between Denham Street and Stokes Street will be in place for the duration of the event.
    Last edited: 14 May 2015 10:49
    Information provided by Department of Transport and Main Roads.

  • RAMSAY STREET

    CLONCURRY

    Special Event Both Directions
    Commencing: 22 June 2015, at 1:00pm
    Concluding:22 October 2015, at 12:00am
    No blockage
    No delays expected. Changed traffic conditions.
    Heavy Vehicle operators are advised the new Cloncurry Heavy Vehicle Bypass is open to traffic and are advised to use this route.
    The Bypass turns off the Flinders Highway just east of Cloncurry and joins the previous Bypass route heading toward the Burke Developmental Road.
    Last edited: 22 Jun 2015 13:01
    Information provided by Department of Transport and Main Roads.

  • GREGORY TERRACE

    BOWEN HILLS

    Special Event All directions
    Brookes St, O'Connell Tce, St Pauls Tce and Costin St..
    Commencing: 27 July 2015, at 6:00am
    Concluding:19 August 2015, at 4:01pm
    All lanes affected
    Delays expected. Allow extra travel time.
    Brisbane City Council wishes to advise that during the period of the Royal Queensland Show 2015 (7-16 August) traffic flow in and around the RNA Showgrounds will be affected by road closures, revised street signage and parking arrangements.


    Road Closures:

    Gregory Terrace between Costin and Exhibition Street, will be closed from 6.00am Monday 27th July until 4pm Wednesday, 19th August.

     During the period of closure, access to the RNA will be provided for emergency service vehicles and vehicles displaying a 2015 permit. Flow will be one way only, with entry from Bowen Bridge Road and exiting to Brookes Street. Normal vehicular traffic will be detoured along Costin Street.

     Entry to Exhibition Street will be from Brookes Street (left turn only) into Gregory Terrace and into Exhibition Street.


    O’Connell Terrace, between Brookes Street and Bowen Bridge Road will have partial closures from 6.00am Friday 31st July to 4.00pm Monday 17th August.

    O’Connell Terrace, between Brookes Street and Wren Street will be closed to eastbound traffic from 5am to 12 midnight on Sunday 9th August.

    Revised Traffic Arrangements

    No right turn will be permitted from Brookes Street into Gregory Terrace

    Right turn only from Wren Street into O’Connell Terrace



    Public Transport to and from this event is strongly recommended

    Taxi ranks will be established in: Gregory Terrace

    Buses will be situated at: O’Connell Terrace

    Drop off zones (including disabled drop off) shall be in: Costin Street

    Last edited: 31 Jul 2015 06:10
    Information provided by Department of Transport and Main Roads.

  • TOWNSVILLE ROAD

    INGHAM

    Special Event Both Directions
    Signage on Townsville Road for special event along Macrossan Avenue.
    Commencing: 28 July 2015 7:00am
    Concluding:03 August 2015, at 4:00pm
    Unknown traffic impact. Changed traffic conditions.
    Last edited: 31 Jul 2015 09:30
    Information provided by Department of Transport and Main Roads.

  • MILTON ROAD

    MILTON

    Special Event All directions
    At Suncorp Stadium. 15 minute parking restrictions apply.
    Commencing: 07 August 2015, at 7:35pm
    Concluding:07 August 2015, at 9:05pm
    Partial lane closures
    Delays expected. Allow extra travel time.
    The Brisbane Broncos v Canterbury Bulldogs NRL game will be held at Suncorp Stadium on Friday the 7th of August 2015 from 7.35pm.

    Major roads closed for an hour following the game:
    • Roma St inbound will be closed between Skew Street and Turbot Street.
    • Petrie Terrace closed between Milton Road and Caxton Street, excepting local traffic.
    • Milton Road closed inbound between Park Road and Petrie Terrace and
    • Caxton Street closed between Hale Street and Petrie Terrace.
    Coronation Drive and Hale St will remain open at all times. Re-directional signs will be placed on the major routes approaching the Stadium.
    Minor Roads closed for an hour following the game are:
    • Cribb Street between Railway Terrace and Milton Road.
    • Paten Street, Black Street, Granzella Street.
    Minor roads closed for 2½ hours before and 1 hour following the game are:
    • Castlemaine Street, Chippendall Street, Finchley Street, Mayneview Street, Parkview Street and Cordova Street.
    Motorists attending the event should also be aware of the 15 minute parking restriction that applies to the Suncorp Traffic Area on match days.

    Last edited: 02 Aug 2015 22:06
    Information provided by Department of Transport and Main Roads.

  • GREENMOUNT HIRSTVALE ROAD

    ASCOT

    Special Event All directions
    Lockyer Antique Motor Association Tractor Trek.
    Commencing: 8 August 2015 at 09.00AM
    Concluding:9 August 2015 at 05.00PM
    No blockage
    No delays expected. Proceed with caution.

    Motorists are advised that the following roads may have an increase in traffic volumes;

    Gatton Clifton Road, Greenmount Hirstvale Road, Nobby Connection Road and Mount Sylvia Road.

    For more information please visit http://lama.org.au/tagged/events

    Last edited: 21 May 2015 08:51
    Information provided by Department of Transport and Main Roads.

  • STANLEY STREET

    WOOLLOONGABBA

    Special Event All directions
    At the Gabba Stadium. 15 minute parking restrictions apply..
    Commencing: 08 August 2015, at 4:35pm
    Concluding:08 August 2015, at 7:10pm
    Partial lane closures
    Delays expected. Allow extra travel time.
    The Brisbane Lions v Gold Coast Suns AFL game will be held at the Gabba on Saturday the 8th of August 2015 from 4:35pm. Traffic congestion may be experienced on Stanley St, Vulture St, and Ipswich Rd from 3.35pm on match day.

    Motorists on the Pacific Motorway may also experience congestion from this time at the northbound Stanley St exit 2 and Stanley St onramp and southbound across the Captain Cook Bridge to the Vulture St exit 2 and Stanley St onramp.

    Road closures will be in place approximately 45 minutes before the end of the event on Stanley St, Main St and Vulture St. Motorists attending the event should also be aware of the 15 minute parking restriction that applies to the Gabba Traffic Area on match days.

    Last edited: 02 Aug 2015 22:13
    Information provided by Department of Transport and Main Roads.

  • VICTORIA STREET

    FOREST HILL

    Special Event Both Directions
    Gallipoli Rememberence March.
    Victoria Street Forest Hill, between Church Street and William Steet.
    Commencing: 22 August 2015, between the hours of 10:30am and 11:15am
    Concluding: 22 August 2015.
    Road closed both directions
    No delays expected. Use alternative route.


    Last edited: 08 May 2015 09:35
    Information provided by Department of Transport and Main Roads.

  • TOOWOOMBA CECIL PLAINS ROAD

    TORRINGTON

    Special Event All directions
    Disability Action Week.
    Motorcycling Austalia Limited Charity Poker Run.
    Various Roads across the Darling Downs and Lockyer Valley affected..
    Commencing: 27 September 2015
    Concluding: 27 September 2015
    No blockage
    Unknown traffic impact. Proceed with caution.

    The following road will be affected:
    Toowoomba Cecil Plains Road - cross over at Boundary Street.
    Warrego Highway - between Boundary Road and Gowrie Junction Road.
    Pechey-Maclagan Road - Gomoran Bergan Road (left) to Gomoran Bergan road (right)
    New England Hwy - Soundergeld Road to Charles Street
    New England Hwy - Esk Hampton Street to Murphy's Creek Road
    Esk Hampton Road - Phillip Road to New England Highway
    Murphy's Creek Road - New England Highway to Warrego Highway
    Warrego Highway - Postman's Ridge to Gatton Helidon Road
    Gatton Helidon Road - Turner Street to Castle Road
    New England Highway - Cambooya Connection Road to Allen Road

    Last edited: 22 Jul 2015 14:18
    Information provided by Department of Transport and Main Roads.

Search by location

Reset

Search by route

Reset