Access keys | Skip to primary navigation | Skip to secondary navigation | Skip to content | Skip to footer
Problems viewing this site

Event information

Sorted By:
  • Garfield Road

    Riverstone

    Single Vehicle Crash Both directions.
    at Railway Terrace
    Use alternative route Delay journey
    Last edited: 01 Sep 2015
    Information provided by Transport for NSW.

  • Parramatta Road

    Homebush

    Wires down Hazard Westbound.
    at Smallwood Avenue

    Last edited: 01 Sep 2015
    Information provided by Transport for NSW.

  • Willoughby Road

    Willoughby

    Stationary Vehicle Northbound.
    at Penkivil Street

    Last edited: 01 Sep 2015
    Information provided by Transport for NSW.

  • Belgrave Street

    Kempsey

    N/A Hazard All directions.
    at Sydney Street

    Last edited: 01 Sep 2015
    Information provided by Transport for NSW.

  • Newell Highway

    Gillenbah

    Single Vehicle Crash Both directions.
    - 10km South of Gillenbah
    Exercise caution Alternating (stop/slow) conditions have been put in place to allow motorists to pass in both directions.

    Last edited: 01 Sep 2015
    Information provided by Transport for NSW.

  • Sturt Highway

    Carrathool

    Single Vehicle Crash Both directions.
    - 117km west of Narrandera
    Exercise caution Alternating (stop/slow) conditions are in place to allow motorists to pass this incident in both directions.

    Last edited: 01 Sep 2015
    Information provided by Transport for NSW.

  • GORE HIGHWAY

    PITTSWORTH

    Single vehicle Crash All directions
    Fuel Tanker Rollover 10.5km South West of Pittsworth.
    Road closed both directions
    Delays expected. Allow extra travel time.
    Last edited: 01 Sep 2015 04:45
    Information provided by Department of Transport and Main Roads.

  • Rixs Creek Rest area

    Singleton

    N/A Hazard .
    - Just off New England Highway
    Exercise caution The rest area is closed to all traffic until later this morning, when the drums of hazardous fluid will be removed.

    Last edited: 01 Sep 2015
    Information provided by Transport for NSW.

  • HENRI ROBERT DRIVE

    CLAGIRABA

    Debris or vegetation Hazard Both Directions
    Between Macrozamia Drive and King Parrot Court.
    Both lanes affected
    No delays expected. Proceed with caution.
    Last edited: 31 Aug 2015 19:37
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    KYBONG

    Single vehicle Crash Northbound
    8 Kilometers South Of Gympie.
    Lane or lanes reduced
    Delays expected. Proceed with caution.
    Last edited: 31 Aug 2015 09:28
    Information provided by Department of Transport and Main Roads.

  • Sturt Highway

    Narrandera

    N/A Hazard Westbound.
    - 5km south east of Narrandera
    Exercise caution The situation will be reassessed on Wednesday.

    Last edited: 01 Sep 2015
    Information provided by Transport for NSW.

  • Moss Vale Road

    Barrengarry Mountain

    Landslide Hazard Both directions.
    between Bunkers Hill Road Myra Vale Road
    Exercise caution Reduced speed limit There are alternating traffic conditions in place and portable traffic signals on site.
    There is a 15-tonne load limit.

    Last edited: 01 Sep 2015
    Information provided by Transport for NSW.

  • Pacific Highway

    Hexham

    N/A Hazard Southbound.
    on Hexham Bridge
    Reduce speed Exercise caution Overheight detectors are out of order until further notice.
    Truck drivers are urged to check the height of their vehicles, which are not to exceed 5.2 metres.

    Last edited: 01 Sep 2015
    Information provided by Transport for NSW.

  • Various roads

    Narrabri Shire

    N/A Hazard .
    -
    Check signage Exercise caution The following local roads are affected by flooding:
    - Millie Road Open to 4WD only. Water over road at Millie Creek.
    - Bald Hill Road Open to 4WD only. Water over road at Toukey Creek.

    Source: Narrabri Council (27 August - 10.53am)

    Last edited: 01 Sep 2015
    Information provided by Transport for NSW.

  • DAWSON DEVELOPMENTAL ROAD

    SPRINGSURE

    Potholes or road surface damage Hazard Both Directions
    Unsealed road between Springsure and Tambo is suitable for high clearance vehicles and 4WD vehicles only.
    No blockage
    No delays expected. Use alternative route.
    Large bull dust holes and surface damage.
    Last edited: 13 Aug 2015 11:49
    Information provided by Department of Transport and Main Roads.

  • WARREGO HIGHWAY

    COLLEGE VIEW

    Potholes or road surface damage Hazard Eastbound
    Road Surface Damage at Moroney Road.
    No delays expected. Reduced speed limit (80km/h).
    Last edited: 07 Aug 2015 13:21
    Information provided by Department of Transport and Main Roads.

  • Various Roads

    Carrathool Shire Council

    N/A Hazard .
    -
    Check signage Exercise caution The following road is closed due to flooding:
    Lachlan Valley Way (Hillston to Booligal);
    Mossgiel Road (Hillston to Mossgiel);
    Whealbah Road (north of MR80 to Trida);
    Pinteebakana Road.

    Some roads are open but with caution. Please check signage and exercise caution.

    For updates after hours or on weekends or for road emergencies please call 0407 244 429.

    Last update 4:12pm Friday 28 August.

    Last edited: 01 Sep 2015
    Information provided by Transport for NSW.

  • Unsealed roads

    Coonamble Shire Council

    Flooding Hazard .
    -
    Exercise caution All unsealed roads in the shire are open to 4 wheel drive vehicles only.
    Council can be contacted on (02) 6827 1900.

    Last update midday 26 August.

    Last edited: 01 Sep 2015
    Information provided by Transport for NSW.

  • Various roads

    Cobar Shire Council

    Flooding Hazard .
    at
    Allow extra travel time Exercise caution State highways and sealed regional and local roads in the shire are open.
    All unsealed roads in the shire are open with caution to light traffic only - except 52 Mile Rd from Barnato to Tilpa, which is closed.
    Please phone (02) 6836 5888 or go to Cobar Shire Council's website for more information.

    Last edited: 01 Sep 2015
    Information provided by Transport for NSW.

  • Various roads

    Central Darling Shire

    Flooding Hazard .
    -
    Check signage Exercise caution The following roads in the Central Darling Shire are closed by flooding:

    Menindee to Wilcannia (east side); and
    Wilcannia to Tilpa (east side).

    For more information please contact the 24-hour road information line on (08) 8091 5155.


    Last council update: 10.48am 31 August.

    Last edited: 01 Sep 2015
    Information provided by Transport for NSW.

  • DAWSON DEVELOPMENTAL ROAD

    TAMBO

    Restricted to four wheel drive vehicles only
    Last edited: 31 Aug 2015 16:11
    Next Update: 03 Sep 2015

    Information provided by Department of Transport and Main Roads.

  • BLACKALL ADAVALE ROAD

    BLACKALL

    Open (with caution)
    Last edited: 31 Aug 2015 16:10
    Next Update: 03 Sep 2015

    Information provided by Department of Transport and Main Roads.

  • BLACKALL JERICHO ROAD

    BLACKALL

    Open (with caution)
    Last edited: 31 Aug 2015 16:08
    Next Update: 03 Sep 2015

    Information provided by Department of Transport and Main Roads.

  • TAMBO ROAD

    ALPHA

    Open (with caution)
    Last edited: 31 Aug 2015 16:12
    Next update:as conditions change
    Information provided by Department of Transport and Main Roads.

  • HUGHENDEN MUTTABURRA ROAD

    HUGHENDEN

    Hughenden - Muttaburra
    Open (with caution)
    Observe signage.
    Drive with caution, rough surface in some sections due to Flood Damage
    Last edited: 31 Aug 2015 15:05
    Next Update: 03 Sep 2015

    Information provided by Department of Transport and Main Roads.

  • TORRENS CREEK ARAMAC ROAD

    TORRENS CREEK

    Aramac - Torrens Creek

    Open (with caution)
    Observe signage.
    “OPEN WITH CARE”
    Drive with caution, rough surface in some sections due to flood damage
    Last edited: 31 Aug 2015 15:04
    Next Update: 03 Sep 2015

    Information provided by Department of Transport and Main Roads.

  • PALMWOODS MONTVILLE ROAD

    PALMWOODS

    Reduced to one lane due to slippage between McDonalds Rd and Montville Road. Traffic signals in place top and bottom of range
    Open (with caution)
    Reduced speed limit (40Km/h).
    Last edited: 03 Aug 2015 16:01
    Next Update: 31 Aug 2015

    Information provided by Department of Transport and Main Roads.

  • KENNEDY DEVELOPMENTAL ROAD

    HUGHENDEN

    Hughenden - Flinders Shire Boundary
    Open (with caution)
    Observe signage.
    “OPEN WITH CARE”
    Drive with caution, rough surface in some sections due to flood damage
    Last edited: 31 Aug 2015 15:02
    Next Update: 03 Sep 2015

    Information provided by Department of Transport and Main Roads.

  • ENDEAVOUR VALLEY ROAD

    COOKTOWN

    Isabella Creek and other creeks and crossings.
    Open (with caution)
    proceed with caution.
    Last edited: 31 Aug 2015 09:18
    Next update:as conditions change
    Information provided by Department of Transport and Main Roads.

  • GREGORY DEVELOPMENTAL ROAD

    EINASLEIGH

    The Lynd to Einasleigh
    Open (with caution)
    proceed with caution.
    Last edited: 31 Aug 2015 09:18
    Next update:as conditions change
    Information provided by Department of Transport and Main Roads.

  • PENINSULA DEVELOPMENTAL ROAD

    LAURA

    Laura to Coen
    Open (with caution)
    proceed with caution.
    Last edited: 31 Aug 2015 09:18
    Next update:as conditions change
    Information provided by Department of Transport and Main Roads.

  • PENINSULA DEVELOPMENTAL ROAD

    COEN

    Coen Airport to Weipa
    Open (with caution)
    do not drive in flood waters.
    Last edited: 31 Aug 2015 09:18
    Next update:as conditions change
    Information provided by Department of Transport and Main Roads.

  • BURKE DEVELOPMENTAL ROAD

    HOWITT

    Walkers creek to Mareeba shire/Tablelands regional boundary
    Restricted to four wheel drive vehicles only
    Proceed with caution.
    Please take extreme care when travelling, due to sections of road damaged from washouts
    Last edited: 21 Aug 2015 10:07
    Next Update: 21 Aug 2015

    Information provided by Department of Transport and Main Roads.

  • BURKE DEVELOPMENTAL ROAD

    HIGHBURY

    40 km east of Dunbar to Mungana turnoff
    Open (with caution)
    do not drive in flood waters.
    Last edited: 31 Aug 2015 09:18
    Next update:as conditions change
    Information provided by Department of Transport and Main Roads.

  • RICHMOND WINTON ROAD

    KYNUNA

    Open (with caution)
    proceed with caution.
    .Last edited: 31 Aug 2015 15:10
    Next update:as conditions change
    Information provided by Department of Transport and Main Roads.

  • MONTO MOUNT PERRY ROAD

    YARROL

    at the Burnett River Bridge
    Closed to all vehicles
    Use alternative route.
    Last edited: 07 Aug 2015 14:39
    Next Update: When conditions change

    Information provided by Department of Transport and Main Roads.

  • KENNEDY HIGHWAY

    UPPER BARRON

    21km from Atherton
    Open (with caution)
    Reduced lanes due to land slip.Last edited: 31 Aug 2015 09:18
    Next update:as conditions change
    Information provided by Department of Transport and Main Roads.

  • KENNEDY DEVELOPMENTAL ROAD

    HUGHENDEN

    Hughenden - Winton


    Open (with caution)
    Observe signage.
    Drive with caution, rough surface in some sections due to Flood Damage
    Last edited: 31 Aug 2015 15:01
    Next Update: 03 Sep 2015

    Information provided by Department of Transport and Main Roads.

  • MAHON ROAD

    COOMINYA


    Closed to all vehicles
    use alternative route.

    Last edited: 16 Jun 2015
    Next update:14 Jun 2016 Information provided by Somerset Regional Council via QIT+

  • OBI OBI ROAD

    OBI OBI

    Subject to a 10 tonne GVM limit
    Observe signage.
    Obi Obi Road, Obi Obi – The downhill section of Obi Obi Road westbound between Mapleton and Kenilworth is open to traffic.
    Last edited: 03 Aug 2015 16:01
    Next Update: 31 Aug 2015

    Information provided by Department of Transport and Main Roads.

Sorted By:
  • ROSS RIVER ROAD

    AITKENVALE

    Planned Roadworks Eastbound
    Between Nathan Street and Elizabeth Street.
    Commencing: 15 July 2015 6:30am
    Concluding:15 September 2015, at 5:00pm
    Partial lane closures
    No delays expected. Observe signage.
    Footpath and parking lanes will remain closed for the duration of the works
    Last edited: 26 Aug 2015 13:26
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    ALLIGATOR CREEK

    Planned Roadworks Both Directions
    Road works for the construction of Bruce Highway and Hay Point roundabout. Between 6am and 6pm Monday to Saturday..
    Commencing: 24 August 2015, at 9:19am
    Concluding:30 June 2016, at 12:00am
    No blockage
    No delays expected. Changed traffic conditions.
    Last edited: 24 Aug 2015 09:19
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    ALLIGATOR CREEK

    Planned Roadworks Both Directions
    Light installation works at the intersection of Tindal Court.
    Commencing: 15 June 2015 6:00am
    Concluding:16 September 2015, at 7:00pm
    Partial lane closures
    No delays expected. Proceed with caution.
    Last edited: 26 Aug 2015 14:40
    Information provided by Department of Transport and Main Roads.

  • PENINSULA DEVELOPMENTAL ROAD

    ARCHER RIVER

    Planned Roadworks Both Directions
    Commencing: in progress
    Concluding:end December 2015
    Lane or lanes reduced
    Delays expected. Changed traffic conditions.
    Last edited: 17 Aug 2015 14:40
    Information provided by Department of Transport and Main Roads.

  • CHRISTENSENS ROAD

    BALBERRA

    Planned Roadworks Both Directions
    Commencing: 20 May 2015, at 12:35pm
    Concluding:31 August 2015, at 12:00am
    No blockage
    Delays expected. Changed traffic conditions.
    Last edited: 22 Jul 2015 13:39
    Information provided by Department of Transport and Main Roads.

  • STRATHPINE ROAD

    BALD HILLS

    Planned Roadworks Both Directions
    Commencing: 23 August 2015, at 8:00pm
    Concluding:10 September 2015, at 5:00am
    Partial lane closures
    Delays expected. Changed traffic conditions.
    Nightworks on Strathpine, Gympie and Gympie Arterial roads, Bald Hills are expected to occur from Sunday 23 August to Thursday 10 September 2015, weather and construction conditions permitting.

    Works will occur from 8pm to 5am.

    Minor traffic delays for motorists travelling outbound on Linkfield Road on ramp to Gympie Arterial Road, Gympie Road and Strathpine Road.

    For more information contact the project team on 3347 5245
    #154
    Last edited: 17 Aug 2015 22:00
    Information provided by Department of Transport and Main Roads.

  • BUNDOCK STREET

    BELGIAN GARDENS

    Planned Roadworks Both Directions
    Between Taylor Street and Beaufort Street.
    Commencing: 18 June 2015 7:00am
    Concluding:15 October 2015, at 5:00pm
    No blockage
    Delays expected. Observe signage.
    Last edited: 26 Aug 2015 13:27
    Information provided by Department of Transport and Main Roads.

  • ROSS STREET

    BENOWA

    Planned Roadworks Northbound
    Narrow lanes and periodic closures of the northbound kerbside lane between 9.30am and 3pm Mon-Fri for next 6-8 weeks.
    Commencing: 24 August 2015 9:30am
    Concluding:10 October 2015, at 12:00am
    One lane blocked
    Delays expected. Allow extra travel time.
    Last edited: 21 Aug 2015 08:55
    Information provided by Department of Transport and Main Roads.

  • BIRKDALE ROAD

    BIRKDALE

    Planned Roadworks
    At Byng Road..
    Commencing: 03 August 2015, at 7:00am
    Concluding:30 September 2015, at 5:00am
    Partial lane closures
    Delays expected. Changed traffic conditions.
    Works will be carried out from early August 2015 to end of September 2015, weather and construction conditions permitting.

    Construction will predominantly be undertaken Monday to Thursday between 7pm and 5am to reduce the impact to surrounding residents and motorists.

    Short traffic delays, lane closures and reduced speed limits can be expected during the works. Traffic control will be in place to ensure the safety of road workers and motorists.
    TMR apologises for any inconvenience these works may cause and appreciates your patience while these important works are carried out.

    Last edited: 29 Jun 2015 10:56
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    BLACK RIVER

    Planned Roadworks Both Directions
    Signage for works on Bowden Road.
    Commencing: 01 September 2015, at 7:00am
    Concluding:02 September 2015, at 11:00am
    No blockage
    Unknown traffic impact. Observe signage.
    Last edited: 26 Aug 2015 15:29
    Information provided by Department of Transport and Main Roads.

  • DAGUILAR HIGHWAY

    BLACKBUTT

    Planned Roadworks Both Directions
    Between Reservoir Service Road and Sutton Street.
    .
    Commencing: End June 2015, weather permitting
    Concluding:in August 2015, weather permitting
    Partial lane closures
    Delays expected. Allow extra travel time.
    Works will generally be undertaken between 6am and 6pm. Motorists should expect changed conditions and observe all safety signage.
    Last edited: 22 Jun 2015 15:52
    Information provided by Department of Transport and Main Roads.

  • BRISBANE VALLEY HIGHWAY

    BLACKSOIL

    Planned Roadworks Both Directions
    Tom Fountain Overpass.
    Commencing: 31 August 2015, at 7:20pm
    Concluding:30 November 2015, at 5:00am
    Lane or lanes reduced
    No delays expected. Use alternative route.
    The Department of Transport and Main Roads will be carrying out work around the signalised intersection just north of the Tom Fountain overpass at Blacksoil. These works will be carried out from 20 August to late November 2015 at day and night. Some night works will be required to minimise the impact to the travelling public. Daytime hours will be between 6am to 6pm Monday to Saturday. All work is subject to weather and construction conditions. During works, minor disruptions and some lane closures can be expected can be expected.
    Traffic control will be in place to ensure the safety of pedestrians, road workers and motorists. Your patience and cooperation is appreciated while these works are underway.
    #160
    Last edited: 31 Aug 2015 19:20
    Information provided by Department of Transport and Main Roads.

  • THE RING ROAD

    BOHLE PLAINS

    Planned Roadworks Both Directions
    Townsville Ring Road Section 4
    From Kalynda Chase intersection to Mt Low intersection of the Bruce Highway.
    Commencing: 07 May 2015, at 10:30am
    Concluding:31 May 2017, at 12:00am
    No blockage
    No delays expected. Changed traffic conditions.
    Motorists are advised there will be increased heavy vehicles in the vicinity of Kalynda Parade and Dalrymple Road for the duration of this project which is expected to be completed by mid 2017.
    Survey works will commence from 6 June 2015 between Veales Road to the overtaking lanes just south of the Black River Bridge.
    Last edited: 26 Aug 2015 13:36
    Information provided by Department of Transport and Main Roads.

  • BRINSMEAD ROAD

    BRINSMEAD

    Planned Roadworks Outbound
    Near Loridan Drive.
    Commencing: 26 August 2015 10:00am
    Concluding:28 August 2015 3:00pm
    Lane or lanes reduced
    Delays expected. Traffic control on scene.
    Last edited: 21 Aug 2015 14:35
    Information provided by Department of Transport and Main Roads.

  • BURNETT BRIDGE

    BUNDABERG CENTRAL

    Planned Roadworks Both Directions
    Commencing: Sunday 26 July 2015, weather permitting
    Concluding:October 2015, weather permitting
    Road closed both directions
    No delays expected. Use alternative route.
    The temporary closure of the Burnett River Bridge between 6am and 5pm are scheduled for, weather permitting on:
    Sunday 26 July 2015
    Sunday 16 August 2015
    Sunday 6 September 2015
    Temporary night time closures of the bridge are schedule for betweeen 8pm and 5am for the next four months until October:
    Week one (starting 2 August) bridge closed Sunday to Thursday
    Week two (starting Sunday 9 August)bridge closed Monday to Thursday
    The weeks will then alternate as above between Sunday to Thursday and Monday to Thursday until October, weather permitting.
    During the closure, a signed detour via the Tallon Bridge will be in place to assist motorists with the changed conditions.
    Transport and Main Roads thanks everyone in advance for their patience and cooperation while these
    important bridge works are underway.
    If you require further information about the works, please contact the Bundaberg office on 1300 728 390
    during business hours, or email bundaberg.office@tmr.qld.gov.au.
    Last edited: 22 Jul 2015 15:16
    Information provided by Department of Transport and Main Roads.

  • BOURBONG STREET

    BUNDABERG WEST

    Planned Roadworks Both Directions
    Between Mulgrave Street and Burrum Street .
    Commencing: 6pm, 26 August 2015
    Concluding:mid-September 2015, weather permitting
    Partial lane closures
    Delays expected. Reduced speed limit (40km/h).
    Works will be undertaken at night between 6pm and 6am.
    Last edited: 26 Aug 2015 16:57
    Information provided by Department of Transport and Main Roads.

  • BRISBANE ROAD

    BUNDAMBA

    Planned Roadworks Both Directions
    Bergins Hill Road, Mining Street and Agnes Street..
    Commencing: 01 September 2015, at 9:00am
    Concluding:30 November 2015, at 5:00pm
    One lane closed
    Delays expected. Traffic control on scene.
    Improvement works will be occurring at the Brisbane Rd and Mining St intersection, Bundamba. These will be undertaken from September 2015 until late November 2015, weather permitting between 7am - 5pm Monday to Saturday. For more information please contact the Site Foreman on 0488 464 571 or alternatively the Site Engineer on 0400 982 837.
    #153
    Last edited: 13 Aug 2015 10:01
    Information provided by Department of Transport and Main Roads.

  • ROMA SOUTHERN ROAD

    BUNGIL

    Planned Roadworks Southbound
    Bungeworgorai Creek .
    Commencing: 31 August 2015, between the hours of 6:00am and 6:00pm, Monday to Friday.
    Concluding: 16 October 2015, weather permitting.
    Single lane in operation
    Delays expected. Changed traffic conditions.

    On site during working hours: Single lane in operation, reduced speed 40km/hr, portable traffic signals with possible delays of up to 5mins

    On site outside of work hours: Return to normal traffic conditions.

    Last edited: 31 Aug 2015 13:28
    Information provided by Department of Transport and Main Roads.

  • ROMA SOUTHERN ROAD

    BUNGIL

    Planned Roadworks Southbound
    Chinchinbilla Creek.
    Commencing: 31 August 2015, between the hours of 6:00am and 6:00pm, Monday to Friday.
    Concluding: 16 October 2015, weather permitting.
    Single lane in operation
    Delays expected. Changed traffic conditions.

    On site during working hours: Single lane in operation, reduced speed 40km/hr, portable traffic signals with possible delays of up to 5mins

    On site outside of work hours: Return to normal traffic conditions.

    Last edited: 31 Aug 2015 13:15
    Information provided by Department of Transport and Main Roads.

  • ROMA SOUTHERN ROAD

    BUNGIL

    Planned Roadworks Southbound
    Hope Creek.
    Commencing: 31 August 2015, between the hours of 6:00am and 6:00pm, Monday to Friday.
    Concluding: 16 October 2015, weather permitting.
    Single lane in operation
    Delays expected. Changed traffic conditions.

    On site during working hours: Single lane in operation, reduced speed 40km/hr, portable traffic signals with possible delays of up to 5mins

    On site outside of work hours: Return to normal traffic conditions.

    Last edited: 31 Aug 2015 13:54
    Information provided by Department of Transport and Main Roads.

  • MITCHELL HIGHWAY

    CHARLEVILLE

    Planned Roadworks Both Directions
    Construction of Angellala Creek Bridge, approximately 30km south of Charleville.
    Commencing: 18 May 2015, between the hours of 6:00am and 6:00pm, 7 days a week.
    Concluding: 20 October 2015, weather permitting.
    No blockage
    No delays expected. Proceed with caution.

    On site During work hours: Reduced speed 40km/hr, No blockage, constuction is isolated from traffic via a Sidetrack, no delays.

    On site After work hours: Reduced speed 60km/hr, No blockage, constuction is isolated from traffic via a Sidetrack, no delays.

    Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au

    Last edited: 28 May 2015 11:13
    Information provided by Department of Transport and Main Roads.

  • ALLAWAH ROAD

    CHUWAR

    Planned Roadworks Both Directions
    Mount Crosby Weir Bridge - changed traffic conditions.
    Commencing: 25 May 2015, at 9:39am
    Concluding:25 May 2017, at 6:00am
    No blockage
    No delays expected. Changed traffic conditions.
    •Traffic conditions along the Mount Crosby Weir Bridge will change from May 2015 as a precaution for the community in the interest of safety.
    •A 9 tonne weight limit has been imposed on Mount Crosby Weir Bridge from 2 May 2015.
    •The weight limit and 20kph speed limit for the bridge are required to protect public safety.
    •Exceptions to the weight limit and speed cannot be made.
    •Any vehicle that exceeds the 9 tonne weight limit should consider an alternative route.
    •Changes to signage will be installed to inform the local community of these changes.
    #106
    Last edited: 25 May 2015 09:42
    Information provided by Department of Transport and Main Roads.

  • AYR DALBEG ROAD

    CLARE

    Planned Roadworks Both Directions
    Signage in Ayr Dalbeg Road for works on Lena Road.
    Commencing: 27 August 2015, at 6:00am
    Concluding:02 October 2015, at 6:00pm
    Partial lane closures
    No delays expected. Changed traffic conditions.
    Last edited: 26 Aug 2015 13:01
    Information provided by Department of Transport and Main Roads.

  • SANDGATE ROAD

    CLAYFIELD

    Planned Roadworks Both Directions
    Sandgate and Junction Roads, intersection, Clayfield.
    Commencing: 06 September 2015, at 7:00pm
    Concluding:15 February 2016, at 5:00am
    Lane or lanes reduced
    Delays expected. Use alternative route.
    The Department of Transport and Main Roads will be undertaking service relocation works as part of a safety improvement upgrade on the Sandgate and Junction Roads, Clayfield intersection.

    Telecommunications relocations are expected to start 6 September 2015 and will be completed by early 2016, between 7pm and 5am, Sunday to Friday, weather and construction conditions permitting. There will be occasional day works, between 9am to 3pm Monday to Friday as needed.

    During investigations, traffic delays, lane closures, moderate noise and reduced speed limits can be expected. Traffic control will be in place to ensure the safety of pedestrians, road workers and motorists.

    Your patience and cooperation is appreciated while these investigated works are underway.
    #152
    Last edited: 06 Aug 2015 13:52
    Information provided by Department of Transport and Main Roads.

  • SANDGATE ROAD

    CLAYFIELD

    Planned Roadworks Both Directions
    Intersection with Junction Road.
    Commencing: 26 July 2015, at 7:00pm
    Concluding:05 September 2015, at 5:00am
    Lane or lanes reduced
    Delays expected. Use alternative route.
    The Department of Transport and Main Roads will be undertaking water service relocation works as part of a safety improvement upgrade on the Sandgate and Junction Roads intersection, Clayfield .

    Water service relocation are expected to start 26 July 2015 and will be completed by 4 September 2015, between 7pm and 5am, Sunday to Friday, weather and construction conditions permitting. There will be occasional day works, between 9am to 3pm Monday to Friday as needed.

    During investigations, traffic delays, lane closures, moderate noise and reduced speed limits can be expected. Traffic control will be in place to ensure the safety of pedestrians, road workers and motorists.

    Your patience and cooperation is appreciated while these investigated works are underway.

    Last edited: 21 Jul 2015 10:23
    Information provided by Department of Transport and Main Roads.

  • RIVERWAY DRIVE

    CONDON

    Planned Roadworks
    Commencing: 10 August 2015, at 6:30am
    Concluding:21 September 2015, at 5:30pm
    No blockage
    No delays expected. Observe signage.
    Last edited: 26 Aug 2015 13:42
    Information provided by Department of Transport and Main Roads.

  • PACIFIC MOTORWAY

    COOMERA

    Planned Roadworks Northbound
    Speed limit reduced to 80kmph and narrow lanes.
    Commencing: 17 August 2015 8:00pm
    Concluding:31 May 2016, at 8:00pm
    No blockage
    No delays expected. Changed traffic conditions.
    The speed limit on the motorway has been lowered to 80kmph and the lane width has been reduced.
    Last edited: 14 Aug 2015 09:44
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    COOROY

    Planned Roadworks Both Directions
    Cooroy to Federal (including Black Mountain).
    Commencing: 20 March 2015, at 7:25pm
    Concluding:31 July 2015, at 12:00pm
    All lanes affected
    Delays expected. Proceed with caution.

    Cudgerie Drive to Sankeys Road
    From 1 March 2015, Bruce Highway traffic diverted onto the new highway lanes between Cudgerie Drive and Black Mountain Range Road, with an 80km/h speed limit in place. The northbound passing lane near Black Mountain Range Road has been partially closed as part of this switch. From April 2015 until late 2015, southbound traffic exiting to Cooroy and Noosa (Exit 230A) is being diverted from the new highway lanes via a side track to Elm Street.

    Cooroy southern interchange to Cudgerie Drive
    From 1 September 2015, Bruce Highway traffic will switch on to the newly constructed northbound carriageway (one lane in each direction) between the Mary River Road overpass and Cudgerie Drive. Night works will be required during the week leading up to and week following the traffic switch. Single lane closures and stop/go traffic control may be in place at each end of the diversion between 5pm and 6am, with signage and traffic controllers directing motorists. The speed limit through the diversion will be 80km/hr. Motorists are encouraged to slow down, drive carefully and follow the direction of traffic controls.
    The speed limit has been reduced through the Cooroy southern interchange to 70km/h, and just north of the interchange to 80km/h. Motorists may experience minor delays. Traffic changes are in place around the Cooroy southern interchange connection road including single lane closures, signage, traffic controllers and stop-go operations until late 2015. Bridge deck installation for the new Cooroy southern interchange off-ramp has temporarily reduced the clearance height to 5.0m until late 2015.

    From January 2015, northbound highway traffic will share the southbound highway lanes for approximately 1km just south of the Cooroy southern interchange, with single northbound and southbound traffic lanes in operation.

    Vehicles wider than 4m should observe the requirements of their over dimensional permits along this section of the highway. An alternative route is available via the Eumundi exit of the Bruce Highway in the south and Pomona Connection Road in the north. Cooroy can then be reached via the old highway (Eumundi Range Road/Nandroya Road/Myall Street) and Pomona can be reached via Elm Street and Yurol Forest Drive. Please note a maximum 5.0m ground contact width northbound and southbound.

    More details are available on TMR’s Conditions of Operation database at www.tmr.qld.gov.au. Proceed with caution.

    Last edited: 31 Aug 2015 18:47
    Information provided by Department of Transport and Main Roads.

  • WARREGO HIGHWAY

    COTSWOLD HILLS

    Planned Roadworks Both Directions
    From Nugent Pinch Road through to Charlton
    .
    Commencing: 23 February 2015 at 6.00am
    Concluding: 30 June 2016 at 6.00pm weather permitting.
    All lanes affected
    Delays expected. Changed traffic conditions.

    Work Hours: 6 days a week, minor detours and sidetracks in place, reduced speed to 60km/h, portable signals, delays up to 15 minutes and traffic control

    After Hours: Minor detours and sidetracks, reduced speed to 80km/h, portable signals.


    Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au
    Last edited: 06 May 2015 06:44
    Information provided by Department of Transport and Main Roads.

  • PROSTON BOONDOOMA ROAD

    COVERTY

    Planned Roadworks Both Directions
    Between Glencoe Road and Fletchers Road.
    Commencing: early July 2015
    Concluding:Early 2016
    Partial lane closures
    Delays expected. Allow extra travel time.
    Last edited: 24 Jun 2015 11:00
    Information provided by Department of Transport and Main Roads.

  • ROSS RIVER ROAD

    CRANBROOK

    Planned Roadworks Eastbound
    Between Lindeman Avenue & Achron Avenue.
    Commencing: 01 September 2015, at 9:00am
    Concluding:02 September 2015, at 3:00pm
    No blockage
    No delays expected. Observe signage.
    Last edited: 26 Aug 2015 14:26
    Information provided by Department of Transport and Main Roads.

  • ROSS RIVER ROAD

    CRANBROOK

    Planned Roadworks Southbound
    Between Ellimata Avenue and Hatchett Street.
    Commencing: 01 September 2015, at 8:00am
    Concluding:01 September 2015, at 3:00pm
    Unknown traffic impact. Reduced speed limit (40km/h).
    Last edited: 31 Aug 2015 08:25
    Information provided by Department of Transport and Main Roads.

  • KOGAN CONDAMINE ROAD

    CROSSROADS

    Planned Roadworks Eastbound
    Intersection with Clyne's Road.
    Commencing: 03 August 2015, between the hours of 6:00am and 6:00pm, Monday to Friday.
    Concluding:30 September 2015, weather permitting.
    No blockage
    No delays expected. Changed traffic conditions.

    On site during working hours: Eastbound shoulder works, reduced speed 40km/hr.

    On site during non working hours: Reduced speed 60km/hr.

    Last edited: 29 Jul 2015 12:55
    Information provided by Department of Transport and Main Roads.

  • DECEPTION BAY ROAD

    DECEPTION BAY

    Planned Roadworks Both Directions
    The Department of Transport and Main Roads (TMR) advises that work to improve safety on Deception Bay Road, at the Bruce Highway interchange and Zammit Street intersection.
    Commencing: 22 July 2015, at 7:00am
    Concluding:End of 2015, weather permitting.
    Lane or lanes reduced
    Delays expected. Observe signage.

    The Department of Transport and Main Roads (TMR) advises that work to improve safety on Deception Bay Road, at the Bruce Highway interchange and Zammit Street intersection, will soon be underway.

    This intersection was identified for upgrade due to the high crash rate at each of these locations. Between January 2008 and July 2013, a total of 53 crashes have occurred at these locations combined. To improve safety at the Bruce Highway interchange, TMR will install two dedicated right-turn lanes from Deception Bay Road to the Bruce Highway south and northbound entry ramps. These works will provide fully-controlled right-turn movements and reconfigure the intersection to accommodate the dual right-turning lanes.

    A series of high visibility LED overhead traffic signal lanterns will also be installed at the Zammit Street intersection to improve visibility for eastbound motorists on Deception Bay Road, as well as providing left and right-turn facilities at the caravan park access just west of the Zammit Street intersection, and minor road widening to improve safety for turning motorists.

    Construction is scheduled to commence Wednesday 22 July 2015 with completion expected at the end of 2015, weather permitting. Work will generally be carried out between 7am and 5pm, Monday to Friday; however, occasional night work may also be required.

    This upgrade will be delivered as part of TMR’s Safer Roads Sooner (SRS) program. The program is a key component of the Queensland Government’s commitment to improving road safety through implementing high benefit, cost effective, road engineering treatments that address known and potential crash locations on the state-controlled road network.

    For further information about this work, please contact the Deception Bay Road works hotline on 1800 502 307.
    Last edited: 10 Aug 2015 08:53
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    DEERAGUN

    Planned Roadworks Northbound
    Signage for construction works on Wagner Street.
    Commencing: 07 July 2015, at 6:00am
    Concluding:24 September 2015, at 6:00pm
    No blockage
    Unknown traffic impact. Proceed with caution.
    Last edited: 26 Aug 2015 13:37
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    DEERAGUN

    Planned Roadworks
    Slashing of road reserve on various State-controlled roads.
    Commencing: 27 October 2014, at 6:00am
    Concluding:27 October 2015, at 6:00pm
    No blockage
    No delays expected. Observe signage.
    Last edited: 26 Aug 2015 13:23
    Information provided by Department of Transport and Main Roads.

  • DAWSON HIGHWAY

    DROMEDARY

    Planned Roadworks Both Directions
    Roundstone Creek .
    Commencing: 31 July 2015 9:28am
    Concluding:11 September 2015, at 6:00pm
    No blockage
    No delays expected. Observe signage.
    Side track in operation
    Last edited: 12 Aug 2015 08:24
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    DUCKINWILLA

    Planned Roadworks Both Directions
    Near Wongi State Forest, south of Torbanlea.
    Commencing: late April
    Concluding:Late 2015, weather permitting
    Lane or lanes reduced
    Delays expected. Allow extra travel time.
    Works will generally be undertaken from 6am to 6pm, Monday to Saturday. Motorists should expect changed conditions, including reduced speed limits and partial lane closures, while works are underway. For further information, contact Transport and Main Roads on 1300 728 390 during business hours or email bundaberg.office@tmr.qld.gov.au.
    Last edited: 17 Apr 2015 11:57
    Information provided by Department of Transport and Main Roads.

  • WOOLCOCK STREET

    GARBUTT

    Planned Roadworks All directions
    Various sections along Woolcock Street, Charters Towers Road and Dalrymple Road will have works associated with NBN installations.
    Commencing: 01 July 7:00am
    Concluding:01 November 2015, at 5:00pm
    Partial lane closures
    Unknown traffic impact. Proceed with caution.
    Works along Woolcock Street between Ingham Road and Mather Street, Charters Towers road between Woolcock Street and Kenilworth Avenue and Dalrymple Road between Banfield Drive and O'Keefe Court. There will be closure of shoulder during these works.
    Last edited: 26 Aug 2015 13:24
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    GLENORCHY

    Planned Roadworks Both Directions
    Between south of Eight Mile Road/Old Gympie Road and north of Seven Mile Road.
    Commencing: late April
    Concluding:late 2015, weather permitting
    Both lanes affected
    Delays expected. Allow extra travel time.
    Works will generally be undertaken between 6am and 6pm, Monday to Saturday. Motorists are advised to expect changed conditions, including reduced speed limits and partial lane closures, while works are underway. For further information, contact Transport and Main Roads on 1300 728 390 during business hours or email bundaberg.office@tmr.qld.gov.au.
    Last edited: 17 Apr 2015 11:57
    Information provided by Department of Transport and Main Roads.

  • CUNNINGHAM HIGHWAY

    GORE

    Planned Roadworks Both Directions
    From approximatley 2 kilometres east of Marble Creek to intersection Zivian's Lane, Lewty's Road.
    Commencing: 31 August 2015, betwen the hours of 6:00am to 6:00pm. Monday to Friday.
    Concluding: 25 September 2015, weather permitting.
    Single lane in operation
    Delays expected. Changed traffic conditions.

    On site during working hours: Single lane in operation, reduced speed 40km/hr, portable traffic signals with possible delays of up to 15mins, please allow for extra travel time.

    On site during outside of working hours. Reduced speed 60km/hr.

    Last edited: 31 Aug 2015 11:52
    Information provided by Department of Transport and Main Roads.

  • PEAK DOWNS HIGHWAY

    GREENMOUNT

    Planned Roadworks Both Directions
    Greenmount / Wollingford Drive intersection.
    Commencing: 18 August 2015 11:42am
    Concluding:02 October 2015, at 12:00am
    No blockage
    Delays expected. Allow extra travel time.
    Last edited: 18 Aug 2015 11:43
    Information provided by Department of Transport and Main Roads.

  • CHINCHILA TARA ROAD

    GREENSWAMP

    Planned Roadworks Both Directions
    Various Locations between 1km south of Greenswamp Road to the intersection Kogan Condamine Road.
    Commencing: 03 August 2015, between the hours of 7:00am and 5:00pm Monday to Friday.
    Concluding: Mid March 2016, weather permitting.
    Single lane in operation
    Delays expected. Changed traffic conditions.

    On site during work hours: Single lane in operation, reduced speed 40km/hr, traffic control with possible delays of up to 15mins, please allow for extra travel time.

    On site outside of work hours: Reduced speeds between 60km/hr and 80km/hr. At approximately 4km south of Condamine River Single lane in operation, Reduced speed 40km/hr, Portable traffic signals with possible delays of up to 5mins.

    Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au

    Last edited: 07 Aug 2015 09:06
    Information provided by Department of Transport and Main Roads.

  • GREGORY DOWNS CAMOOWEAL ROAD

    GREGORY

    Planned Roadworks Both Directions
    Commencing: 17 August 2015 6:00am
    Concluding:31 December 2015, at 6:00pm
    Partial lane closures
    Delays expected. Changed traffic conditions.
    Gravel resheeting works will commence on the Gregory Downs-Camooweal Road on 17 August 2015 and are scheduled to be completed by 31 December 2015. Works will be taking place from 53.47km to 213.75km along this road.

    Motorists can expect single lane closure and delays of up to 15 minutes.
    Last edited: 13 Aug 2015 17:12
    Information provided by Department of Transport and Main Roads.

  • PACIFIC MOTORWAY

    HELENSVALE

    Planned Roadworks Northbound
    Coomera River Bridge. Speed reduced from Helensvale to Coomera.
    Commencing: 26 August 2015 12:30am
    Concluding:15 September 2015, at 12:00am
    Partial lane closures
    Unknown traffic impact. Reduced speed limit (80km/h).
    Last edited: 26 Aug 2015 06:32
    Information provided by Department of Transport and Main Roads.

  • BOWEN ROAD

    HERMIT PARK

    Planned Roadworks Both Directions
    Water main replacement works are occurring at the intersection of Carmody Street and Bowen Road.
    Commencing: 10 August 2015 6:00am
    Concluding:30 September 2015, at 6:00pm
    Partial lane closures
    No delays expected. Changed traffic conditions.
    Last edited: 26 Aug 2015 14:27
    Information provided by Department of Transport and Main Roads.

  • EIGHTH AVENUE

    HOME HILL

    Planned Roadworks Both Directions
    Commencing: 03 August 2015, at 6:00am
    Concluding:04 September 2015, at 6:00pm
    Road closed both directions
    No delays expected. Use alternative route.
    Detour in place
    Last edited: 26 Aug 2015 13:38
    Information provided by Department of Transport and Main Roads.

  • WOOLCOCK STREET

    HYDE PARK

    Planned Roadworks Northbound
    Commencing: 27 August 2015, at 5:00am
    Concluding:26 April 2016, at 5:00pm
    Partial lane closures
    Unknown traffic impact. Observe signage.
    Last edited: 27 Aug 2015 17:09
    Information provided by Department of Transport and Main Roads.

  • CHARTERS TOWERS ROAD

    HYDE PARK

    Planned Roadworks All directions
    Charters Towers Road between Woolcock Street and Kenilworth Avenue, along Dalrymple Road between Banfield Drive and O'Keefe Court and along Bruce Highway between Ingham Road and Mather Street.
    Commencing: 18 June 7:00am
    Concluding:15 October 2015, at 5:00pm
    Lane or lanes reduced
    Unknown traffic impact. Observe signage.
    Last edited: 26 Aug 2015 13:25
    Information provided by Department of Transport and Main Roads.

  • WOOLCOCK STREET

    HYDE PARK

    Planned Roadworks Both Directions
    Installation of new water mains on various state controlled roads - Woolcock Street, Ross River Road, Bowen Road and Charters Towers Road.
    Commencing: 15 May 2015, at 7:00am
    Concluding:30 September 2015, at 2:00pm
    Partial lane closures
    Unknown traffic impact. Changed traffic conditions.
    Last edited: 26 Aug 2015 13:22
    Information provided by Department of Transport and Main Roads.

  • LAKESIDE DRIVE

    IDALIA

    Planned Roadworks Both Directions
    Under boring works at River Boulevard intersection.
    Commencing: 24 August 2015, at 7:00am
    Concluding:23 October 2015, at 5:00pm
    Unknown traffic impact. Proceed with caution.
    Last edited: 26 Aug 2015 14:39
    Information provided by Department of Transport and Main Roads.

  • MOGGILL ROAD

    INDOOROOPILLY

    Planned Roadworks Both Directions
    Between Rylatt Street and Rennies Road.
    Commencing: 26 July 2015, at 8:00pm
    Concluding:13 September 2015, at 5:00am
    Partial lane closures
    Delays expected. Changed traffic conditions.
    Motorists are advised that temporary lane closures on Moggill Road east and westbound will be required between Rylatt Street and Rennies Road, Indooroopilly, from Sunday 31 May to Friday 12 June 2015, weather permitting.
    Lane restrictions will also be in place on the Western Freeway southbound on and off-ramps. Access through Moggill Road will be maintained with contraflow traffic control.
    Lane closures, signage and traffic controllers will be set up from 8pm on the eastbound and westbound lanes. Due to increased traffic from late night shopping, eastbound traffic control will not be set up until 9pm on Thursday nights.
    Police and traffic controllers will be directing traffic at the intersections of Moggill Road and Russell Terrace, and the southbound Western Freeway on and off-ramps. Traffic controllers will be in place to maintain access for residents from 474 to 502 Moggill Road. Minor delays may be expected. For further information please call 13 QGOV (13 7468)
    #145
    Last edited: 24 Jul 2015 12:10
    Information provided by Department of Transport and Main Roads.

  • MOGGILL ROAD

    INDOOROOPILLY

    Planned Roadworks All directions
    Commencing: 01 July 2015, at 7:00pm
    Concluding:10 November 2015, at 5:00am
    All lanes affected
    Delays expected. Changed traffic conditions.
    Works will be carried out from early July 2015 until late October 2015, weather and construction conditions permitting.

    Construction will predominantly be undertaken at night from Sunday to Friday between 7.00pm and 5.00am due to traffic volumes on Moggill Road. Some works will also be undertaken from time to time, during the day or on weekends for the safety of road workers and motorists.

    Motorists may experience short traffic delays and lane closures during the works. There will also be temporary reductions in the speed limit. Traffic control will be in place to ensure the safety of road workers and motorists. There will be some construction noise, lighting and dust associated with these works. However, TMR will make every effort to minimise disruptions throughout the duration of this project.

    TMR apologises for any inconvenience these works may cause to residents and motorists and appreciates your patience while these important safety works are carried out.

    Last edited: 29 Jun 2015 18:25
    Information provided by Department of Transport and Main Roads.

  • MOGGILL ROAD

    INDOOROOPILLY

    Planned Roadworks Southbound
    Moggill Road, Indooroopilly,
    Western Freeway on and off-ramps at Moggill Road, Indooroopilly
    Russell Terrace, Indooroopilly
    Centenary Bikeway
    .
    Commencing: 10 May 2015, at 8:00pm
    Concluding:25 May 2016, at 5:00am
    Road closed single direction
    Delays expected. Changed traffic conditions.
    Motorists are advised that the southbound on-ramp to the Western Freeway from Moggill Road will be temporarily closed from 8pm to 5am, Sunday to Thursday nights from Sunday 10 May to Thursday 24 May, 2015, weather permitting, as part of works for the Moggill Road cycle bridge.During this closure, a detour will be in place for motorsists wishing to travel south on the Centenary Motorway from Moggill Road. Motorists will continue on Moggill Road, detouring onto Fig Tree Pocket Road before entering the Motorway southbound at Fig Tree Pocket. Signage will be in place to guide motorists during this detour.
    Traffic management including reduced speed limits and signage will be in place during the closure. Minor delays may be expected. For further information please call 13 QGOV (13 7468)

    Last edited: 06 May 2015 11:53
    Information provided by Department of Transport and Main Roads.

  • MOGGILL ROAD

    INDOOROOPILLY

    Planned Roadworks Both Directions
    Commencing: 10 April 2015, at 10:00am
    Concluding:01 February 2016, at 5:00pm
    No blockage
    No delays expected. Changed traffic conditions.
    Motorists are advised that construction of the Moggill Road cycle bridge will commence in April 2015 and will continue through to early 2016.

    Traffic management including reduced speed limits, traffic controllers and devices will be in place where required. To ensure the safety of motorists and workers, some traffic control including shoulder and lane closures will be required at times.

    For further information about the project, please call 13QGOV.

    Last edited: 10 Apr 2015 12:51
    Information provided by Department of Transport and Main Roads.

  • PALM TERRACE

    INGHAM

    Planned Roadworks Southbound
    Commencing: 31 August 2015, at 9:30am
    Concluding:11 September 2015, at 3:00pm
    Partial lane closures
    Unknown traffic impact. Observe signage.
    Last edited: 26 Aug 2015 14:34
    Information provided by Department of Transport and Main Roads.

  • PALM TERRACE

    INGHAM

    Planned Roadworks Southbound
    Lannercost Street.
    Commencing: 24 August 2015, at 9:30am
    Concluding:04 September 2015, at 3:00pm
    No blockage
    No delays expected. Traffic control on scene.
    Last edited: 26 Aug 2015 14:36
    Information provided by Department of Transport and Main Roads.

  • LANNERCOST STREET

    INGHAM

    Planned Roadworks
    Palm Terrace and Lannercost Street.
    Commencing: 24 August 2015, at 9:30am
    Concluding:04 September 2015, at 3:00pm
    No blockage
    No delays expected. Observe signage.
    Last edited: 26 Aug 2015 14:38
    Information provided by Department of Transport and Main Roads.

  • VICTORIA MILL ROAD

    INGHAM

    Planned Roadworks Both Directions
    Construction works along Forest Beach Road.
    Commencing: 07 April 6:00am
    Concluding:30 November 2015, at 6:00pm
    No blockage
    No delays expected. Changed traffic conditions.
    Last edited: 26 Aug 2015 13:25
    Information provided by Department of Transport and Main Roads.

  • HUTTON STREET

    INJUNE

    Planned Roadworks Both Directions
    Intersection Carnarvon Highway, Hutton Street Injune and Injune to Taroom Road, Third avenue Injune.
    Commencing: 14 July 2015, between the hours of 6:00am and 6:00pm, 7 days a week.
    Concluding: 01 September 2015, weather permitting
    Single lane in operation
    Delays expected. Changed traffic conditions.

    On site during working hours 6:00am to 6:00pm:- Single lane in operation, reduced speed 40km/h, traffic control with possible delays of up to 15mins, please allow for extra travel time

    On site after hours: Single lane in operation, reduces speed 60km/h, portable traffic signals with possible delays of up to 5mins.

    Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au

    Last edited: 03 Jul 2015 10:12
    Information provided by Department of Transport and Main Roads.

  • BRINSMEAD KAMERUNGA ROAD

    KAMERUNGA

    Planned Roadworks All directions
    Intersection of Harley Street.
    Commencing: in progress
    Concluding:September 2015
    Lane or lanes reduced
    Unknown traffic impact. Changed traffic conditions.
    Last edited: 14 Aug 2015 07:19
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    KENNEDY

    Planned Roadworks Both Directions
    Yellow Waterholes Creek to Dallachy Creek.
    Commencing: in progress
    Concluding:September 2015
    Lane or lanes reduced
    Unknown traffic impact. Changed traffic conditions.
    Last edited: 14 Aug 2015 07:16
    Information provided by Department of Transport and Main Roads.

  • DAWSON HIGHWAY

    KIN KORA

    Planned Roadworks All directions
    Kin Kora roundabout.
    Commencing: 12 May 2015, at 11:58am
    Concluding:29 January 2016, at 6:00pm
    Partial lane closures
    Delays expected. Changed traffic conditions.
    Works to upgrade the Dawson Highway / Philip Street intersection are underway. There will be not traffic impacts during daytime hours however lane closures will occur at night. Traffic control will be in place.
    Last edited: 12 May 2015 11:59
    Information provided by Department of Transport and Main Roads.

  • THURINGOWA DRIVE

    KIRWAN

    Planned Roadworks Both Directions
    Installation of irrigation.
    Commencing: 31 August 2015, at 9:00am
    Concluding:01 September 2015, at 3:00pm
    Partial lane closures
    No delays expected. Changed traffic conditions.
    Last edited: 26 Aug 2015 14:15
    Information provided by Department of Transport and Main Roads.

  • THURINGOWA DRIVE

    KIRWAN

    Planned Roadworks Both Directions
    Survey works will be occurring in this area.
    Commencing: 27 August 2015, at 8:00am
    Concluding:11 September 2015, at 6:00pm
    Partial lane closures
    No delays expected. Proceed with caution.
    Last edited: 26 Aug 2015 14:42
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    KOUMALA

    Planned Roadworks All directions
    Shoulder sealing and wide centre line treatment to various sections between Koumala and Sarina on the Bruce Highway.
    Commencing: 21 July 2015, at 6:00am
    Concluding:04 November 2015, at 5:00pm
    Partial lane closures
    Delays expected. Observe signage.
    Last edited: 14 Jul 2015 11:10
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    KYBONG

    Planned Roadworks Both Directions
    Between Woondum and Venardos Avenue intersection.
    Commencing: Monday 27 July 2015, weather permitting
    Concluding:Mid-2016, weather permitting
    No blockage
    Delays expected. Changed traffic conditions.
    Cooroy to Curra - Section C: Traveston to Woondum early works underway between Woondum and Venardos Avenue.
    Expect changed traffic conditions, including speed reductions. Excess dimension vehicle restrictions - lane widths reduced to 3.25m.
    Last edited: 23 Jul 2015 16:27
    Information provided by Department of Transport and Main Roads.

  • KENNEDY HIGHWAY

    MACALISTER RANGE

    Planned Roadworks All directions
    Multiple locations on Kuranda Range.
    Commencing: in progress
    Concluding:October 2015
    Partial lane closures
    Delays expected. Proceed with caution.
    Department of Transport and Main Roads is undertaking geotechnical assessments on the Kuranda Range embankments at multiple locations. This will help us to identify landslip risks to prioritise for future stabilisation works.

    For the safety of road users and workers, changed road conditions including lane closures, temporary speed reductions and traffic control will be in place between 9:00 am and 3:00pm, Monday to Friday for the duration of the works. Road users should expect delays of up to ten minutes and plan their trips accordingly
    Last edited: 14 Aug 2015 07:10
    Information provided by Department of Transport and Main Roads.

  • GORDON STREET EXIT

    MACKAY

    Planned Roadworks All directions
    Showgrounds and Shakespeare Street Intersection upgrades
    Changed traffic conditions.
    Commencing: 21 April 2015, at 3:55pm
    Concluding:31 October 2015, at 12:00am
    Partial lane closures
    Delays expected. Proceed with caution.
    Last edited: 21 Apr 2015 15:56
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    MACKAY

    Planned Roadworks All directions
    Showgrounds and Shakespeare Street Intersection upgrades
    Changed traffic conditions.
    Commencing: 21 April 2015, at 3:53pm
    Concluding:31 October 2015, at 12:00am
    Partial lane closures
    Delays expected. Changed traffic conditions.
    Last edited: 21 Apr 2015 15:54
    Information provided by Department of Transport and Main Roads.

  • SHAKESPEARE STREET

    MACKAY

    Planned Roadworks All directions
    Showgrounds and Shakespeare Street Intersection upgrades
    Changed traffic conditions.
    Commencing: 21 April 2015, at 3:50pm
    Concluding:31 October 2015, at 12:00am
    Partial lane closures
    Delays expected. Observe signage.
    Last edited: 21 Apr 2015 15:50
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    MCDESME

    Planned Roadworks Both Directions
    Burdekin River Bridge.
    Commencing: 31 August 2015, at 9:00am
    Concluding:10 October 2015, at 2:45pm
    Partial lane closures
    Delays expected. Traffic control on scene.
    Last edited: 28 Aug 2015 16:21
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    MCDESME

    Planned Roadworks Both Directions
    Burdekin Bridge - Home Hill
    Maintenance works.
    Commencing: 05 August 2015, at 9:00am
    Concluding:03 September 2015, at 2:45pm
    Partial lane closures
    Delays expected. Changed traffic conditions.

    Motorists are advised that maintenance works will be completed on the Burdekin Bridge, Home Hill between the hours of 9.00am to 2.45pm on the following dates:

    05 August - 07 August 2015
    18 August - 21 August 2015
    25 August - 28 August 2015
    31 August - 03 September 2015

    Speed restrictions and changed traffic conditions including single lane closures and stop/go controls will be in place. Motorists can expect minor delays. The Department thanks motorists for their patience and cooperation while these works are being completed.
    Last edited: 26 Aug 2015 13:37
    Information provided by Department of Transport and Main Roads.

  • WARREGO HIGHWAY

    MINDEN

    Planned Roadworks Westbound
    Between Zabels Road South and Mountain View Drive, with speed reduced to 40km/hr.
    Commencing: 01 September 2015, at 9:00am
    Concluding:01 September 2015, at 1:00pm
    Limited to one lane
    No delays expected. Changed traffic conditions.
    Last edited: 01 Sep 2015 09:39
    Information provided by Department of Transport and Main Roads.

  • GRACE STREET

    MOUNT ISA CITY

    Planned Roadworks
    Commencing: 27 August 2015, at 6:00am
    Concluding:15 September 2015, at 6:00am
    No blockage
    No delays expected.
    Maintenance works planned under the Leichardt River Bridge. No traffic impact expected.
    Last edited: 24 Aug 2015 15:35
    Information provided by Department of Transport and Main Roads.

  • CENTENARY HIGHWAY

    MOUNT OMMANEY

    Planned Roadworks Inbound
    On Ramp Upgrade .
    Commencing: 06 July 2015, at 7:00pm
    Concluding:27 November 2015, at 5:00am
    Partial lane closures
    Delays expected. Changed traffic conditions.
    The Department of Transport and Mains Roads (TMR) will be carrying out road works to improve safety for traffic using the inbound on-ramp of the Centenary Highway in the vicinity of the Mt Ommaney Shopping center.
    The Works are expected to be carried out from early July 2015 to late 2015 from Sunday to Friday nights between 7pm and 5am.
    During construction, the following changed conditions will apply
    Temporary lane closures, Reduced speed limit's, Traffic controllers and Signage indication changed conditions.
    Please follow the directions of the signage and traffic controllers and drive carefully through the work zone.
    For more general information
    Phone:1800 045 348 or
    Email: metropolitanregion@tmr.qld.gov.au
    Last edited: 02 Jul 2015 16:16
    Information provided by Department of Transport and Main Roads.

  • ROSS RIVER ROAD

    MUNDINGBURRA

    Planned Roadworks Westbound
    Footpath and pit repairs.
    Commencing: 01 September 2015, at 9:00am
    Concluding:02 September 2015, at 3:00pm
    Partial lane closures
    Unknown traffic impact. Changed traffic conditions.
    Last edited: 26 Aug 2015 14:32
    Information provided by Department of Transport and Main Roads.

  • ROSS RIVER ROAD

    MUNDINGBURRA

    Planned Roadworks All directions
    Works to install water mains at various locations on Ross River Road , Charters Towers Road, Bowen Road and Woolcock Street.
    Commencing: Currently underway
    Concluding:30 November 2015, at 2:00pm
    Partial lane closures
    Unknown traffic impact. Changed traffic conditions.
    Last edited: 26 Aug 2015 14:36
    Information provided by Department of Transport and Main Roads.

  • CHARTERS TOWERS ROAD

    MYSTERTON

    Planned Roadworks Both Directions
    Signage on Charters Towers Road for works on Jameson Street.
    Commencing: 20 August 2015, at 6:00am
    Concluding:03 September 2015, at 6:00pm
    No blockage
    No delays expected. Changed traffic conditions.
    Last edited: 26 Aug 2015 13:20
    Information provided by Department of Transport and Main Roads.

  • WILLS DEVELOPMENTAL ROAD

    NICHOLSON

    Planned Roadworks Both Directions
    Commencing: 28 August 2015, at 8:57am
    Concluding:02 September 2015, at 6:00pm
    No blockage
    No delays expected. Proceed with caution.
    Maintenance works are being undertaken on Beames Brook Bridge. Motorists are advised to obey all signage and take extreme care.
    Last edited: 28 Aug 2015 08:58
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    NORTH LAKES

    Planned Roadworks Southbound
    Works will commence on the Anzac Avenue southbound on-ramp to the Bruce Highway as part of the Bruce Highway Managed Motorway Project.
    Commencing: 18 September 2014, at 5:45pm
    Concluding:Mid 2015
    Delays expected. Traffic control on scene.
    Last edited: 10 Aug 2015 08:56
    Information provided by Department of Transport and Main Roads.

  • EYRE STREET

    NORTH WARD

    Planned Roadworks Eastbound
    From the Gregory Street intersection.
    Commencing: 24 August 2015, at 8:00am
    Concluding:04 September 2015, at 4:00pm
    Partial lane closures
    No delays expected. Observe signage.
    Last edited: 26 Aug 2015 14:37
    Information provided by Department of Transport and Main Roads.

  • EYRE STREET

    NORTH WARD

    Planned Roadworks Both Directions
    Commencing: 30 April 2015, at 7:00am
    Concluding:01 October 2015, at 5:00pm
    Partial lane closures
    No delays expected. Observe signage.
    Last edited: 26 Aug 2015 13:45
    Information provided by Department of Transport and Main Roads.

  • GATEWAY MOTORWAY

    NUDGEE BEACH

    Planned Roadworks Both Directions
    Between Transurban Queensland boundary and Bicentennial Road exits..
    Commencing: 01 September 2015, at 8:00pm
    Concluding:01 November 2015, at 5:00am
    Partial lane closures
    Delays expected. Allow extra travel time.
    Night works are required on the gateway Motorway between Transurban Queensland Boundary line and Bicentennial Road exit between 01/09/2015 and 30/10/2015
    Last edited: 28 Aug 2015 22:47
    Information provided by Department of Transport and Main Roads.

  • GOLD COAST HIGHWAY

    PALM BEACH

    Planned Roadworks Both Directions
    Commencing: late June 2015
    Concluding:late 2015
    Lane or lanes reduced
    No delays expected. Changed traffic conditions.
    Installation of street lighting from south of the Thrower Drive intersection to Currumbin Creek bridge.
    Last edited: 09 Jun 2015 12:23
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    PORT CURTIS

    Planned Roadworks Both Directions
    Bruce Highway - Egans Hill to Yeppen Roundabout.
    Commencing: 10 April 10:29am
    Concluding:31 March 2016, at 12:00am
    No blockage
    No delays expected. Changed traffic conditions.
    Construction is underway on the Yeppen South project between Egans Hill and Yeppen roundabout, south of Rockhampton.

    Speed restrictions are in place.
    Last edited: 22 Aug 2015 15:32
    Information provided by Department of Transport and Main Roads.

  • RAY JONES ROAD

    PORTSMITH

    Planned Roadworks Both Directions
    Near Lyons Street.
    Commencing: 24 August 2015 9:00am
    Concluding:4 September 2015 3:00pm
    Lane or lanes reduced
    Delays expected. Traffic control on scene.
    9:00am to 3:00pm
    Last edited: 28 Aug 2015 07:27
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    PROSERPINE

    Planned Roadworks Both Directions
    Works to take place 40km - 43km north of Proserpine..
    Commencing: 01 July 2015, at 12:00am
    Concluding:28 October 2015, at 12:00am
    Partial lane closures
    Delays expected. Traffic control on scene.
    The works are to extend the wide of 3 culverts.
    Last edited: 30 Jun 2015 13:45
    Information provided by Department of Transport and Main Roads.

  • RAILWAY AVENUE

    RAILWAY ESTATE

    Planned Roadworks Both Directions
    Signage for works on Brooks Street.
    Commencing: 10 August 2015 6:30am
    Concluding:28 September 2015, at 5:30pm
    No blockage
    Unknown traffic impact. Reduced speed limit (40km/h).
    Last edited: 26 Aug 2015 13:38
    Information provided by Department of Transport and Main Roads.

  • DALBY KOGAN ROAD

    RANGES BRIDGE

    Planned Roadworks Both Directions
    Approximatly between intersection with Old Warrego Highway to just west of intersection with Leahy's Road .
    Commencing: 15 July 2015, between the hours of 6:00am and 6:00pm, Monday to Friday.
    Concluding: 23 October 2015, weather permiting
    Single lane in operation
    Delays expected. Changed traffic conditions.

    On site during working hours FROM 24 JULY 2015 to 23 OCTOBER 2015: Single lane in operation, portable traffic signals with possible delays of up to 5mins, reduced speed 40km/hr

    On site after working hours FROM 24 JULY to 23 OCTOBER 2015: Single lane in operation, portable traffic signals with possible delays of up to 5mins, Reduced speed 60km/hr.

    Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au

    Last edited: 30 Jul 2015 10:02
    Information provided by Department of Transport and Main Roads.

  • KENNEDY HIGHWAY

    RAVENSHOE

    Planned Roadworks Both Directions
    From Millstream Bridge to Millstream Falls Road. Rough surface. Drive with care.
    Commencing: in progress
    Concluding:September 2015
    All lanes affected
    Delays expected. Reduced speed limit (60km/h).
    Last edited: 14 Aug 2015 07:20
    Information provided by Department of Transport and Main Roads.

  • BOWEN ROAD

    ROSSLEA

    Planned Roadworks Southbound
    Footpath repair works near McQueen Street intersection.
    Commencing: 01 September 2015, at 9:00am
    Concluding:02 September 2015, at 3:00pm
    Partial lane closures
    Unknown traffic impact. Observe signage.
    Last edited: 26 Aug 2015 14:29
    Information provided by Department of Transport and Main Roads.

  • ANZAC AVENUE

    ROTHWELL

    Planned Roadworks Both Directions
    Between Finnegan Street and Capestone Blvd. .
    Commencing: 01 September 2015, at 8:00pm
    Concluding:02 September 2015, at 5:00am
    All lanes affected
    Delays expected. Changed traffic conditions.
    Eastbound closure with traffic being diverted onto the Westbound lanes in a contraflow arrangement between 8:00pm to 5:00am, Tuesday 1st and Wednesday 2nd.
    Last edited: 31 Aug 2015 12:12
    Information provided by Department of Transport and Main Roads.

  • CAPTAIN COOK HIGHWAY

    SMITHFIELD

    Planned Roadworks All directions
    Night works at Smithfield Roundabout.
    Commencing: 24 August 2015 8:00pm
    Concluding:mid September 2015
    Lane or lanes reduced
    Delays expected. Changed traffic conditions.
    Works from 8:00pm until 5:00am
    Last edited: 21 Aug 2015 08:14
    Information provided by Department of Transport and Main Roads.

  • EDMONDSTONE STREET

    SOUTH BRISBANE

    Planned Roadworks Both Directions
    Closed for works between Melbourne St and Brereton St.
    Commencing: 08 August 2015, at 3:59am
    Concluding:09 August 2015, at 12:00am
    Road closed both directions
    Unknown traffic impact. Use alternative route.
    Last edited: 08 Aug 2015 04:00
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    STUART

    Planned Roadworks
    Various low impact areas around Townsville.
    Commencing: 19 February 2015, at 7:00am
    Concluding:21 March 2016, at 6:00pm
    Partial lane closures
    No delays expected. Observe signage.
    Last edited: 26 Aug 2015 13:28
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    STUART

    Planned Roadworks Both Directions
    Bruce Highway Upgrade (Vantassel to Cluden) - Highway Duplication.
    Commencing: 09 October 2013, at 9:00am
    Concluding:Late 2015
    Partial lane closures
    Delays expected. Changed traffic conditions.
    The Bruce Highway Upgrade (Vantassel to Cluden) project is now entering its final stages of completion. Work is progressing well with the majority of the works at Stuart Drive accomplished.

    The last few months has seen a lot of activity towards the northern end of the project site, and the Department of Transport and Main Roads (TMR) can now confirm that major works will be completed by the end of September 2015.

    Important works across the Vantassel to Cluden project include:

    From Zinc Avenue to Stuart Creek Bridge
    Motorists are now able to travel along two lanes of traffic in both directions, speed and lane restrictions may occur from time to time to allow for finalisation works on the centre medians and road shoulders. These temporary lane closures will provide a safe environment for work crews and motorists. Once all works are finalised, the 80km/hr speed limit will apply throughout this section.

    Hunter Street signalised intersection
    During the past couple of weeks motorists have also become acquainted with the new Hunter Street traffic lights. Some fine-tuning will continue to occur during the next couple of weeks.

    From Stuart Creek Bridge to Lakeside Drive
    It is anticipated that both northbound and southbound signals at Lakeside Drive will be operational from Friday 31 July 2015.

    Landscaping, drainage, signage and other finalisation works will continue for the next month in this section. Lane closures and speed restrictions will remain in place throughout this area to ensure the safety of our workers and motorists.

    From Lakeside Drive to Cluden Drive
    From Friday 31 July 2015, all motorists using Stuart Drive will be diverted to the new permanent alignment, therefore the Bruce Highway and Stuart Drive intersection will operate under the new dual traffic signals. During the following weeks, TMR’s Traffic Management Centre will monitor the intersection and fine-tune the light sequencing.

    The temporary roundabout at Cluden Drive will be removed and as previously advised in project updates, due to the split dual lane carriageways, Newton Street will change to a left in / left out configuration. This new permanent arrangement will permit U-turn manoeuvres at the Macarthur Drive / Melton Black intersection, and the Bruce Highway and Stuart Drive intersection. Alternate access to Stuart Drive and the Bruce Highway from Newton Street will be via Edison Street, Wulguru.

    Pedestrian movements will also be moved over to the permanent arrangement from Friday 31 July 2015. Pedestrians will be directed to the new signalised pedestrian facilities. Green cycle lanes through the new intersections will be progressively painted over the next month.

    In addition, the following activities will be occurring in this area:

    1. Decommissioning and removal of the northbound side-track between Lakeside Drive and Stuart Drive
    2. Final road pavement works continues for the remainder of this week
    3. Works on the centre medians, concreting and lighting works
    4. Landscaping, drainage, signage and other finalisation works will also continue
    5. Periodic lane closures and speed restrictions will be in place as required to ensure the safety of our workers and motorists

    Other information
    Linemarking crews will be working night shifts to finalise linemarking throughout the project site and again lane and speed restrictions will be in place
    Last edited: 26 Aug 2015 13:29
    Information provided by Department of Transport and Main Roads.

  • MAINS ROAD

    SUNNYBANK

    Planned Roadworks Both Directions
    To Calam Road.
    Commencing: 08 June 2015, at 7:00am
    Concluding:30 December 2015, at 5:00pm
    Partial lane closures
    Delays expected. Changed traffic conditions.
    What to expect during these works:
    * changed traffic conditions along Mains and Beaudesert Roads
    * construction vehicles and plant will be operating in the area and residents and businesses may notice increased noise during work hours
    * Stop and go traffic controllers (short delays may occur)

    The standard work hours for the project are 7am to 5pm, Monday to Saturday, weather and construction conditions permitting.
    If you require further information on this project, please contact the Project Team on 3066 1309 or by email metropolitanregion@tmr.qld.gov.au during business hours.
    Alternatively, please contact the Department of Transport and Main Roads on 13QGOV (13 74 68) during business hours.
    For up-to-date information on road closures and traffic conditions across Queensland, please visit www.131940.qld.gov.au or call 13 19 40.
    For up-to-date passenger information please visit translink.com.au or call 13 12 30 anytime.


    #118

    Last edited: 05 Jun 2015 18:21
    Information provided by Department of Transport and Main Roads.

  • TAMBORINE MOUNTAIN ROAD

    TAMBORINE

    Planned Roadworks Both Directions
    Roadworks between Nieuwenburg Place and Beaudesert-Beenleigh Road roundabout between 6.30am and 6pm.
    Commencing: 23 June 6:00am
    Concluding:26 November 2015, at 5:00pm
    Partial lane closures
    No delays expected. Changed traffic conditions.
    Roadworks between Nieuwenburg Place and Beaudesert-Beenleigh Road roundabout between 6.30am and 6pm
    Last edited: 23 Jun 2015 10:20
    Information provided by Department of Transport and Main Roads.

  • CHINCHILLA TARA ROAD

    TARA

    Planned Roadworks Both Directions
    Between Mary Road and Butlers Road.
    Commencing: 26 August 2015, between the hours of 7:00am and 4:00pm, Monday to Friday.
    Concluding: End of November 2015, weather permitting.
    Single lane in operation
    Delays expected. Changed traffic conditions.

    On site during work hours: Single lane in operation, reduced speed 40km/hr, portable traffic signals with possible delays of up to 5mins.

    On site outside of work hours: Single lane in operation, reduced speed 60km/hr, portable traffic signals with possible delays of up to 5mins.

    Last edited: 27 Aug 2015 10:00
    Information provided by Department of Transport and Main Roads.

  • YAAMBA ROAD

    THE CAVES

    Planned Roadworks Both Directions
    Intersection of the Bruce Highway and Barmoya Road, The Caves.
    Commencing: 10 August 2015 7:00am
    Concluding:04 September 2015, at 5:00pm
    Lane or lanes reduced
    Delays expected. Observe signage.
    Last edited: 10 Aug 2015 09:47
    Information provided by Department of Transport and Main Roads.

  • THURINGOWA DRIVE

    THURINGOWA CENTRAL

    Planned Roadworks All directions
    Various locations along Thuringowa Drive. Works will take place along the media strip.
    Commencing: 20 July 2015 7:00am
    Concluding:20 October 2015, at 5:00pm
    Partial lane closures
    Unknown traffic impact. Reduced speed limit (40km/h).
    Last edited: 26 Aug 2015 13:31
    Information provided by Department of Transport and Main Roads.

  • RIVERWAY DRIVE

    THURINGOWA CENTRAL

    Planned Roadworks Both Directions
    Commencing: 10 October 2014, at 7:00am
    Concluding:31 December 2015, at 5:00pm
    No blockage
    Unknown traffic impact. Observe signage.
    Last edited: 26 Aug 2015 13:23
    Information provided by Department of Transport and Main Roads.

  • RUTHVEN STREET

    TOOWOOMBA CITY

    Planned Roadworks Southbound
    Southbound, between North Street and Jellicoe Street, with speed reduced to 40km/hr.
    Commencing: 01 September 2015, at 9:00am
    Concluding:01 September 2015, at 3:00pm
    Limited to one lane
    Delays expected. Changed traffic conditions.
    Last edited: 01 Sep 2015 09:23
    Information provided by Department of Transport and Main Roads.

  • RUSSELL STREET

    TOOWOOMBA CITY

    Planned Roadworks Both Directions
    Russell Street converting from One Way traffic to Two Way Traffic as of the 17 August 2015.
    Commencing: 17 August 2015
    Concluding: NO end date: Permanent Change
    No blockage
    No delays expected. Changed traffic conditions.
    Last edited: 11 Aug 2015 17:36
    Information provided by Department of Transport and Main Roads.

  • DENHAM STREET

    TOWNSVILLE CITY

    Planned Roadworks Southbound
    Commencing: 09 July 2015, at 8:00am
    Concluding:14 September 2015, at 6:00pm
    Partial lane closures
    Unknown traffic impact. Observe signage.
    Last edited: 26 Aug 2015 13:21
    Information provided by Department of Transport and Main Roads.

  • PACIFIC MOTORWAY

    UPPER COOMERA

    Planned Roadworks All directions
    Ongoing roadworks as part of the Coomera Interchange (Exit 54) upgrade..
    Commencing: 09 August 2015 8:00pm
    Concluding:31 October 2016, at 8:00pm
    No blockage
    Delays expected. Changed traffic conditions.
    Ongoing roadworks as part of the Coomera Interchange (Exit 54) upgrade.
    Last edited: 07 Aug 2015 12:26
    Information provided by Department of Transport and Main Roads.

  • WARREGO HIGHWAY

    WARRA

    Planned Roadworks Both Directions
    Just west of the intersection with Mason Road, Warra.
    Commencing: 10 August 2015, between the hours of 6:00am and 6:00pm, Monday to Friday.
    Concluding: 30 September 2015, weather permitting.
    Single lane in operation
    Delays expected. Changed traffic conditions.

    On site during working hours: Single lane in operation, reduced speed 60km/hr, traffic control with possible delays of up to 15mins, please allow for extra travel time.

    On site after working hours: Both directions open with Reduced speed 80km/hr.

    Last edited: 06 Aug 2015 07:10
    Information provided by Department of Transport and Main Roads.

  • CUNNINGHAM HIGHWAY

    WARRILL VIEW

    Planned Roadworks Both Directions
    Nightworks from 6pm to 4am each night from 31 August 2015 to 10 September 2015.
    Commencing: 31 August 2015, at 6:00pm
    Concluding:10 September 2015, at 4:00am
    Lane or lanes reduced
    No delays expected. Observe signage.
    Please drive with care and watch out for signage and speed restrictions.
    Last edited: 31 Aug 2015 20:03
    Information provided by Department of Transport and Main Roads.

  • PERCY STREET

    WEST END

    Planned Roadworks Westbound
    Water main repair on footpath, corner of Percy Street and Nix Street.
    Commencing: 18 August 2015, at 8:00am
    Concluding:25 September 2015, at 4:00pm
    Unknown traffic impact. Proceed with caution.
    Last edited: 31 Aug 2015 15:03
    Information provided by Department of Transport and Main Roads.

  • WOOLCOCK STREET

    WEST END

    Planned Roadworks
    Various Roads within Townsville region.
    Commencing: 12 March 2015, at 6:00am
    Concluding:09 March 2016, at 3:00pm
    No blockage
    No delays expected. Observe signage.
    Last edited: 26 Aug 2015 14:33
    Information provided by Department of Transport and Main Roads.

  • CAPRICORN HIGHWAY

    WILLOWS

    Planned Roadworks Both Directions
    Anakie Rail overpass.
    Commencing: 31 August 2015, at 8:00am
    Concluding:11 September 2015, at 6:00pm
    Partial lane closures
    Delays expected. Changed traffic conditions.
    Last edited: 31 Aug 2015 09:03
    Information provided by Department of Transport and Main Roads.

  • MOUNT GRAVATT CAPALABA ROAD

    WISHART

    Planned Roadworks Both Directions
    Mt Gravatt Capalaba Road, Wishart, between Broadwater and Gardner/Mt Petrie Roads.
    Gateway Motorway on and off ramps, Mackenzie.
    Commencing: 12 May 2014, at 1:00pm
    Concluding:31 December 2015, at 5:00am
    Lane or lanes reduced
    Delays expected. Changed traffic conditions.
    Motorists are advised that construction of Gateway Upgrade South Stage 2a (Mt Gravatt Capalaba Road) commenced in April 2014 and will continue through to late 2015, weather and construction conditions permitting.
    The Australian Government and Queensland Government are jointly funding the upgrade of Mt Gravatt-Capalaba Road (Broadwater to Gardner Road) as part of the second stage of Gateway Upgrade South projects.
    Bridge duplication works and general road construction activities will be carried out Monday to Saturday between 7am and 5pm.
    Nightworks and temporary lane closures, on Mount Gravatt-Capalaba Road, Wishart and Gateway Motorway on and off-ramps, Mackenzie will be required 8pm to 5am up to 5 nights per week and may also occur off-peak during the day.
    Traffic management including reduced speed limits, traffic controllers and devices will be in place to guide motorists where required. During construction, minor traffic delays and some noise, dust and vibration may be experienced. The project team will endeavour to minimise impacts where possible.
    Please slow down – roadwork safety is your responsibility too.
    For further information contact the project team on 1800 799 686.
    A map and further details of this project can be found at www.tmr.qld.gov.au/gatewayupgradesouth.
    #128

    Last edited: 15 Sep 2014 04:28
    Information provided by Department of Transport and Main Roads.

  • TAMBORINE OXENFORD ROAD

    WONGAWALLAN

    Planned Roadworks Both Directions
    Stop/slow traffic control near Hayes Road weekdays between 6.30am and 5pm.
    Commencing: 20 May 6:30am
    Concluding:30 September 2015, at 5:00pm
    Limited to one lane
    Delays expected. Allow extra travel time.
    Last edited: 20 May 2015 16:29
    Information provided by Department of Transport and Main Roads.

  • SHORT CUT ROAD

    WOONGOOLBA

    Unplanned Roadworks Westbound
    Road closed between School Road and Mill Road for emergency road repairs.
    Commencing: 14 August 2015 9:15am
    Concluding:09 September 2015, at 12:00am
    Partial lane closures
    Delays expected. Observe signage.
    Last edited: 14 Aug 2015 09:16
    Information provided by Department of Transport and Main Roads.

  • BUNYA HIGHWAY

    WOOROOLIN

    Planned Roadworks Both Directions
    Just north of Wooroolin.
    Commencing:
    Concluding:July 2015, weather permitting
    Partial lane closures
    Delays expected. Allow extra travel time.
    Last edited: 24 Jun 2015 10:51
    Information provided by Department of Transport and Main Roads.

  • MONTO MOUNT PERRY ROAD

    YARROL

    Planned Roadworks Both Directions
    Between the Burnett Highway and Kerwee Road.
    Commencing: late January
    Concluding:late 2015, weather permitting
    Road closed both directions
    No delays expected. Allow extra travel time.
    Works to seal three sections of Monto-Mount Perry Road, between the Burnett River and Eastern Creek, are underway. A full road closure is in place between the Burnett Highway and Kerwee Road, and all through traffic will be detoured via Kerwee Road while works are underway. Access will strictly be provided for local traffic only. Motorists should allow additional travel time while using the detour. We apologise for any inconvenience this may cause, and thank you for your patience and cooperation. For further information, contact Transport and Main Roads in Bundaberg on 1300 728 390 during business hours, or email bundaberg.office@tmr.qld.gov.au
    Last edited: 10 Feb 2015 14:37
    Information provided by Department of Transport and Main Roads.

Sorted By:
  • FLINDERS STREET

    TOWNSVILLE CITY

    Special Event Both Directions
    Between Denham Street and Stokes Street. Sundays 6am to 3pm.
    Commencing: 02 August, at 6:00am
    Concluding:17 June 2021, at 3:00pm
    Unknown traffic impact. Use alternative route.
    Flinders Street between Denham Street and Stokes Street is where a planned event will be occurring every Sunday. This event will commence every Sunday at 6:00am and finish up the same day on 3:00pm. A full closure of Flinders Street between Denham Street and Stokes Street will be in place for the duration of the event.
    Last edited: 14 May 2015 10:49
    Information provided by Department of Transport and Main Roads.

  • RAMSAY STREET

    CLONCURRY

    Special Event Both Directions
    Commencing: 22 June 2015, at 1:00pm
    Concluding:22 October 2015, at 12:00am
    No blockage
    No delays expected. Changed traffic conditions.
    Heavy Vehicle operators are advised the new Cloncurry Heavy Vehicle Bypass is open to traffic and are advised to use this route.
    The Bypass turns off the Flinders Highway just east of Cloncurry and joins the previous Bypass route heading toward the Burke Developmental Road.
    Last edited: 22 Jun 2015 13:01
    Information provided by Department of Transport and Main Roads.

  • MILTON ROAD

    MILTON

    Special Event All directions
    Milton Road, Milton- Special Event: At Suncorp Stadium. 15 minute parking restrictions
    apply on match day - Event Starting 03 September at 7:45pm. Event Completion: 03 September, at 9:15pm. Partial lane closures, Short delays, allow extra travel time.
    .
    Commencing: 03 September 2015, at 7:45pm
    Concluding:03 September 2015, at 11:15pm
    Lane or lanes reduced
    Delays expected. Changed traffic conditions.
    The Brisbane Broncos v Melbourne Storm Rugby League Game will be held at Suncorp Stadium on Thursday 03 September 2015 from 7:45 pm. Major Roads closed for an hour following the Game:
     Roma St inbound will be closed between Skew St and Turbot St.
     Petrie Terrace closed between Milton Rd and Caxton St, excepting local traffic.
     Milton Rd closed inbound between Park Rd and Petrie Tce, and
     Caxton St closed between Hale St and Petrie Tce
    Coronation Dr and Hale St will remain open at all times. Re-directional signs will be placed on the
    major routes approaching the Stadium.
    Minor Roads closed for an hour following the Game are:
     Cribb St between Railway Tce and Milton Rd.
     Paten St, Black St, Granzella St.
    Minor Roads closed for 2 ½ hours before and 1 hour following the Game are:
     Castlemaine St, Chippendall St Finchley St, Mayneview St, Parkview St, and Cordova St.
    Motorists attending the event should also be aware of the 15 minute parking restriction that applies
    to the Suncorp Traffic Area on match days.
    Last edited: 30 Aug 2015 21:12
    Information provided by Department of Transport and Main Roads.

  • MOUNT COOT THA ROAD

    MOUNT COOT-THA

    Special Event All directions
    Cootha Classic Motorsport Event.
    Commencing: 04 September 2015, at 7:00am
    Concluding:07 September 2015, at 8:00pm
    Road closed both directions
    Delays expected. Use alternative route.
    Brisbane City Council wishes to advise that due to the holding of the Cootha Classic on Saturday 5th September, Mt Coot-tha Rd; Scenic Dr; Sir Samuel Griffith Dr and Birdwood Tce shall be entirely closed to motorists from 7.00am Friday 4th September until 8.00pm Monday 7th September 2015.

    Motorists will be advised of an alternate route by use of detour signage around the affected area.

    For any event information, please call (07) 3158 8509
    Last edited: 28 Aug 2015 22:02
    Information provided by Department of Transport and Main Roads.

  • STANLEY STREET

    WOOLLOONGABBA

    Special Event All directions
    At the Gabba Stadium. 15 minute parking restrictions apply.
    Commencing: 05 September 2015, at 1:45pm
    Concluding:05 September 2015, at 4:20pm
    Partial lane closures
    Delays expected. Allow extra travel time.
    The Brisbane Lions V Western Bulldogs AFL Game will be held at the Gabba on Saturday September 5th from 1:45pm. Traffic congestion may be experienced on Stanley St, Vulture St, and Ipswich Rd from 12:15pm on match day.
    Motorists on the Pacific Motorway may also experience congestion from this time at the northbound Stanley St exit 2 and Stanley St onramp and southbound across the Captain Cook Bridge to the Vulture St exit 2, Stanley St onramp and Main St.
    Road closures will be in place approximately 45 minutes before the end of the event on Stanley St and Vulture St. Motorists attending the event should also be aware of the 15 minute parking restriction that applies to the Gabba Traffic Area on match days.
    Last edited: 27 Aug 2015 21:07
    Information provided by Department of Transport and Main Roads.

  • HOUGHTON HIGHWAY

    BRIGHTON

    Special Event All directions
    Closure of the Ted Smout Bridge.
    Commencing: 06 September 2015, at 4:00am
    Concluding:06 September 2015, at 12:00pm
    Road closed both directions
    Delays expected. Allow extra travel time.
    The Department of Transport and Main Roads wishes to advise that on the 6th of September 2015 the Ted Smout Bridge will be closed for a special event. Contraflow in place on Houghton Highway Bridge. This is anticipated to occur between 4.00am - 11.30 am. Expect delays
    Last edited: 19 Aug 2015 12:05
    Information provided by Department of Transport and Main Roads.

  • DAGUILAR HIGHWAY

    BLACKBUTT

    Special Event All directions
    Road closure on the D’Agular Highway (Kilcoy – Yarraman) at Blackbutt for a festival event. .
    Commencing: 12 September 2015, at 12:45pm
    Concluding:12 September 2015, at 2:00pm
    Road closed both directions
    Unknown traffic impact.
    A road closure for long/heavy vehicles shall be in place at Blackbutt on the D’Agular Highway (Kilcoy – Yarraman) for a festival event being conducted on Saturday 12 September 2015 between the hours of 12:45pm to 2:00pm. The detour in place is unsuitable for long/heavy vehicles. These vehicles are requested to park up at Yarraman and Benarkin while the road closure is in place during this time
    Last edited: 28 Aug 2015 17:38
    Information provided by Department of Transport and Main Roads.

  • MULGOWIE ROAD

    MULGOWIE

    Special Event All directions
    Cycle Race Event
    Intersections Red Gap Road and Brown Springs Road .
    Commencing: 13 September 2015, between the hours of 7:00am and 2:00pm
    Concluding: 13 September 2015
    Single lane in operation
    Delays expected. Proceed with caution.

    At the Red Gap Road and Brown Springs Road Intersections - Traffic control with delays and reduced speed 40km/hr

    Last edited: 28 Aug 2015 09:57
    Information provided by Department of Transport and Main Roads.

  • TOOWOOMBA CECIL PLAINS ROAD

    TORRINGTON

    Special Event All directions
    Disability Action Week.
    Motor Cycle Event.
    Various Roads across the Darling Downs and Lockyer Valley affected..
    Commencing: 27 September 2015
    Concluding: 27 September 2015
    All lanes affected
    Unknown traffic impact. Proceed with caution.

    The following road will be affected:
    Toowoomba Cecil Plains Road - cross over at Boundary Street.
    Warrego Highway - between Boundary Road and Gowrie Junction Road.
    Pechey-Maclagan Road - Gomoran Bergan Road (left) to Gomoran Bergan road (right)
    New England Hwy - Soundergeld Road to Charles Street
    New England Hwy - Esk Hampton Street to Murphy's Creek Road
    Esk Hampton Road - Phillip Road to New England Highway
    Murphy's Creek Road - New England Highway to Warrego Highway
    Warrego Highway - Postman's Ridge to Gatton Helidon Road
    Gatton Helidon Road - Turner Street to Castle Road
    New England Highway - Cambooya Connection Road to Allen Road

    Last edited: 19 Aug 2015 15:26
    Information provided by Department of Transport and Main Roads.

Search by location

Reset

Search by route

Reset