Access keys | Skip to primary navigation | Skip to secondary navigation | Skip to content | Skip to footer
Problems viewing this site

Northern Queensland area

Sorted By:
  • BRUCE HIGHWAY

    CLEMANT

    Animal or wildlife Hazard All directions
    Motorists are urged to drive with caution, especially between the Bluewater and Rollingstone area. Please report any sightings by calling 13 19 40.
    No delays expected. Proceed with caution.
    Last updated: 26 Apr 2016 07:41
    Information provided by Department of Transport and Main Roads.

  • PALMERSTON HIGHWAY

    WOOROONOORAN

    Potholes or road surface damage Hazard Eastbound
    Near Henrietta Creek Picnic area.
    No blockage
    No delays expected.
    Last updated: 01 Apr 2016 10:24
    Information provided by Department of Transport and Main Roads.

  • BURDEKIN FALLS DAM ROAD

    RAVENSWOOD

    Burdekin Falls Dam Road Ravenswood to Mount Coolon and Collinsville will be closed indefinitely from 8 pm Monday 14 March 2016 due to flooding at the Burdekin Falls Dam Road
    Open
    Last updated: 29 Apr 2016
    Next update: as conditions change

    Information provided by Department of Transport and Main Roads.

  • WILLS DEVELOPMENTAL ROAD

    JULIA CREEK

    Julia Creek / Burke & Wills
    Open
    0.3m over at Cloncurry River
    600mm at Eastern Creek
    Last updated: 27 Apr 2016
    Next update: 30 Apr 2016

    Information provided by Department of Transport and Main Roads.

  • BURKE DEVELOPMENTAL ROAD

    HOWITT

    Walkers creek to Mareeba shire/Tablelands regional boundary
    ( closed Walkers Creek / Dunbar -- 4WD only Dunbar / Mareeba Shire Boundary )
    Closed to through traffic
    Observe signage.
    Walkers Creek / Dunbar Station closed Dunbar Station / Mareeba Shire Boundary open to 4WD only
    Last updated: 27 Apr 2016
    Next update: 30 Apr 2016

    Information provided by Department of Transport and Main Roads.

  • BURKE DEVELOPMENTAL ROAD

    HIGHBURY

    Mareeba Shire Council boundary to Mungana turnoff. As at 06.30am Friday 30th April, the Walsh River at Trimble's Crossing is 0.01 metres over the crossing.
    Open (with caution)
    Do not drive in flood waters.
    Last updated: 29 Apr 2016
    Next update: as conditions change

    Information provided by Department of Transport and Main Roads.

  • BURKE DEVELOPMENTAL ROAD

    CLONCURRY

    Cloncurry - Burke & Wills Junction

    Open (with caution)
    Proceed with caution.
    RoadTek Road Report 12pm 23/03/2016
    Last updated: 28 Apr 2016
    Next update: 01 May 2016

    Information provided by Department of Transport and Main Roads.

  • PENINSULA DEVELOPMENTAL ROAD

    MISSION RIVER

    End of road works site to Weipa..
    Open (with caution)
    Last updated: 29 Apr 2016
    Next update: as conditions change
    Information provided by Department of Transport and Main Roads.

  • PENINSULA DEVELOPMENTAL ROAD

    LAURA

    Open (with caution)
    do not drive in flood waters.
    Last updated: 29 Apr 2016
    Next update: as conditions change
    Information provided by Department of Transport and Main Roads.

  • HUGHENDEN MUTTABURRA ROAD

    HUGHENDEN

    Hughenden - Muttaburra
    Restricted to four wheel drive vehicles only
    Observe signage.
    Last updated: 21 Apr 2016
    Next update: 26 Apr 2016

    Information provided by Department of Transport and Main Roads.

  • KENNEDY DEVELOPMENTAL ROAD

    HUGHENDEN

    The Lynd - Hugenden (To Flinders Shire Boundary)
    Restricted to four wheel drive vehicles only
    Observe signage.
    Drive with caution, rough surface in some sections due to flood damage
    Last updated: 21 Apr 2016
    Next update: 26 Apr 2016

    Information provided by Department of Transport and Main Roads.

  • CLONCURRY DUCHESS ROAD

    CLONCURRY

    Cloncurry - Duchess

    Open (with caution)
    Proceed with caution.
    Last updated: 07 Apr 2016
    Next update: 07 Apr 2016

    Information provided by Department of Transport and Main Roads.

  • DUCHESS DAJARRA ROAD

    DAJARRA

    Dutchess - Dajarra

    Open (with caution)
    Proceed with caution.
    Last updated: 04 Apr 2016
    Next update: 07 Apr 2016

    Information provided by Department of Transport and Main Roads.

  • RICHMOND WINTON ROAD

    RICHMOND

    Restricted to four wheel drive vehicles only
    Proceed with caution.
    Last updated: 24 Mar 2016
    Next update: 27 Mar 2016

    Information provided by Department of Transport and Main Roads.

  • GREGORY DOWNS CAMOOWEAL ROAD

    CAMOOWEAL

    Gregory to Camooweal
    Restricted to four wheel drive vehicles only
    Proceed with caution.
    Gregory / Burke Shire Boundary restricted to 4WD ---- Burke Shire Boundary to Camooweal open with caution
    Last updated: 28 Apr 2016
    Next update: 01 May 2016

    Information provided by Department of Transport and Main Roads.

  • FORSAYTH ROAD

    GEORGETOWN

    Open
    Last updated: 29 Apr 2016
    Next update: as conditions change
    Information provided by Department of Transport and Main Roads.

  • LANDSBOROUGH HIGHWAY

    CLONCURRY

    Between Cloncurry and McKinlay
    Open (with caution)
    Proceed with caution.
    Last updated: 28 Apr 2016
    Next update: 01 May 2016

    Information provided by Department of Transport and Main Roads.

  • KENNEDY DEVELOPMENTAL ROAD

    HUGHENDEN

    Open (with caution)
    Proceed with caution.
    Last updated: 21 Apr 2016
    Next update: 26 Apr 2016

    Information provided by Department of Transport and Main Roads.

  • KENNEDY DEVELOPMENTAL ROAD

    LYNDHURST

    The Lynd to Etheridge Shire Boundary. As at 3.00pm on Tuesday 21st March the Bundock Creek is 0.1 meters over the road and the Einsleigh River is 0.1 meters over the road
    Open
    Last updated: 29 Apr 2016
    Next update: as conditions change
    Information provided by Department of Transport and Main Roads.

  • PRAIRIE MUTTABURRA ROAD

    PRAIRIE

    Restricted to four wheel drive vehicles only
    Observe signage.
    Last updated: 21 Apr 2016
    Next update: 26 Apr 2016

    Information provided by Department of Transport and Main Roads.

Sorted By:
  • ROSS RIVER ROAD

    AITKENVALE

    Planned Roadworks All directions
    Near Anne Street intersection.
    Commencing: 26 April 2016 6:00pm
    Concluding:10 May 2016 6:00am
    Lane or lanes reduced
    Delays expected. Changed traffic conditions.
    Last updated: 22 Apr 2016 13:18
    Information provided by Department of Transport and Main Roads.

  • NATHAN STREET

    AITKENVALE

    Planned Roadworks Southbound
    Corner of Leopold Street.
    Commencing: 25 April 2016 9:00am
    Concluding:6 May 2016 3:00pm
    No blockage
    No delays expected. Observe signage.
    Last updated: 20 Apr 2016 16:59
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    ALLIGATOR CREEK

    Planned Roadworks Both Directions
    Adjacent to the Bruce highway near the Killymoon Creek Rail Bridge.
    Commencing: 18 April 2016 6:00am
    Concluding:10 June 2016 6:30pm
    No blockage
    No delays expected. Changed traffic conditions.
    Last updated: 21 Apr 2016 13:40
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    ALLIGATOR CREEK

    Planned Roadworks Both Directions
    Construction of overtaking lanes are under way between Alligator Creek Road and Allendale Drive, speed restrictions and lane closures will be in place for the duration of these works.
    Commencing: 16 November 2015 6:30am
    Concluding:30 May 2016 6:30pm
    Both lanes affected
    Delays expected. Changed traffic conditions.
    Speed restrictions in place throughout the area, Please drive with caution.
    Last updated: 29 Apr 2016 15:03
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    AYR

    Planned Roadworks Both Directions
    NBN construction and installation works between Drysdale Street and Edwards Street.
    Commencing: 25 January 2016 7:00am
    Concluding:30 June 2016 5:00pm
    Partial lane closures
    No delays expected. Observe signage.
    Last updated: 08 Apr 2016 10:09
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    BLACK RIVER

    Planned Roadworks Eastbound
    Works are being conducted in shoulder.
    Commencing: 12 April 2016 7:00am
    Concluding:30 July 2016 6:00pm
    No delays expected. Observe signage.
    Last updated: 12 Apr 2016 17:31
    Information provided by Department of Transport and Main Roads.

  • HERVEY RANGE ROAD

    BOHLE PLAINS

    Planned Roadworks Both Directions
    Hervey Range Road Widening and Centre Line Treatment Project has commenced..
    Commencing: 26 April 2016 6:00am
    Concluding:31 October 2016 6:00pm
    Partial lane closures
    Delays expected. Changed traffic conditions.
    Last updated: 26 Apr 2016 14:38
    Information provided by Department of Transport and Main Roads.

  • THE RING ROAD

    BOHLE PLAINS

    Planned Roadworks Both Directions
    Townsville Ring Road Section 4

    From Kalynda Chase intersection to Mt Low intersection of the Bruce Highway.
    Commencing: 05 April 2016 1:10pm
    Concluding:31 May 2017 1:15pm
    Delays expected. Changed traffic conditions.
    Motorists are advised there will be increased heavy vehicles in the vicinity of Kalynda Parade and Dalrymple Road for the duration of this project which is expected to be completed by mid 2017.



    Works will be continuing along the Bruce Highway between Mt Low Parkway and Brabon road, south of Black River Bridge as part of the Ring Road Section 4 project. Speed reductions are in place.

    A temporary diversion is in place as of 16 March due to rough surface as a result of wet weather between Mt Low Road and Veales Road until repair works can be carried out.
    Last updated: 08 Apr 2016 10:08
    Information provided by Department of Transport and Main Roads.

  • FLINDERS HIGHWAY

    CLONCURRY

    Planned Roadworks Both Directions
    Commencing: 4 May 2016 4:00pm
    Concluding:11 May 2016 4:00pm
    Observe signage.
    Last updated: 28 Apr 2016 11:46
    Information provided by Department of Transport and Main Roads.

  • RIVERWAY DRIVE

    CONDON

    Planned Roadworks Southbound
    Between the Ring Road and Gouldian Avenue .
    Commencing: 15 April 2016 6:30am
    Concluding:03 May 2016 5:00pm
    Lane or lanes reduced
    Delays expected. Changed traffic conditions.
    Last updated: 14 Apr 2016 12:44
    Information provided by Department of Transport and Main Roads.

  • ROSS RIVER ROAD

    CRANBROOK

    Planned Roadworks Both Directions
    Various locations between Riverway Drive and Gulliver Street.
    Commencing: 11 April 2016 7:00am
    Concluding:30 July 2016 6:00pm
    Partial lane closures
    No delays expected. Changed traffic conditions.
    Last updated: 08 Apr 2016 15:36
    Information provided by Department of Transport and Main Roads.

  • DALRYMPLE ROAD

    CURRAJONG

    Planned Roadworks Both Directions
    Cable hauling works will take place along Dalrymple Road, Woolcock Street and Hugh Street with speed reduction in place during the works.
    Commencing: 30 November 2015 6:30am
    Concluding:20 May 2016 5:00pm
    No blockage
    No delays expected. Proceed with caution.
    Last updated: 21 Apr 2016 14:19
    Information provided by Department of Transport and Main Roads.

  • GEANEY LANE

    DEERAGUN

    Planned Roadworks Both Directions
    As part of the Townsville Ring Road Section 4 there will be temporary lane closure and delays along Geaney Lane .
    Commencing: 04 May 2016 6:00am
    Concluding:14 May 2016 6:00pm
    All lanes affected
    Delays expected. Changed traffic conditions.

    Townsville Ring Road Section 4
    Geaney Lane temporary closures and delays

    As part of the Townsville Ring Road Section 4 Project, works will commence on the placement of the deck units on top of the new Geaney Lane overpass.

    To allow the safe placement of these deck units, changed traffic conditions will be in place at Geaney Lane between Leonie Street and Alford Street, weather permitting.

    15 minutes traffic delays
    6:00am to 6:00pm
    Wednesday 4 May to Friday 6 May 2016
    And
    Monday 9 May to Saturday 14 May 2016

    Temporary closure
    From 5:00am on Saturday 7 May 2016 until
    5:00pm on Monday 9 May 2016

    During these works, accesses to residential and business properties along Geaney Lane will be maintained from either Veales Road or the Bruce Highway traffic lights – Garland Road. Traffic will not be able to travel under the overpass during the times of closure.

    These arrangements are necessary for the safety of passing motorists while the crane positions the deck units on the new overpass bridge. Traffic controllers will be on site while works are underway to ensure provisions for emergency services and pedestrians.
    Your patience and cooperation of appreciated while these works are underway.
    For more information:
    Phone: 1800 625 648
    Email : engagement.northern@tmr.qld.gov.au

    Last updated: 26 Apr 2016 10:29
    Information provided by Department of Transport and Main Roads.

  • WILLS DEVELOPMENTAL ROAD

    FOUR WAYS

    Planned Roadworks
    Between the Burke and Wills Junction and Gregory. .
    Commencing: 4 April 2016 9:00am
    Concluding:1 July 2016 5:00pm
    Delays expected. Observe signage.
    Allow extra travel time.
    Last updated: 06 Apr 2016 14:51
    Information provided by Department of Transport and Main Roads.

  • WOOLCOCK STREET

    GARBUTT

    Planned Roadworks Both Directions
    East of Mather Street.
    Commencing: 2 May 2016 7:30am
    Concluding:6 May 2016 4:00pm
    No blockage
    No delays expected. Observe signage.
    Last updated: 21 Apr 2016 17:03
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    GOONDI BEND

    Planned Roadworks Both Directions
    Commencing: 4 April 2016 6:00am
    Concluding:June 2016
    Partial lane closures
    Delays expected. Allow extra travel time.
    Last updated: 04 Apr 2016 17:46
    Information provided by Department of Transport and Main Roads.

  • CHARTERS TOWERS ROAD

    HERMIT PARK

    Planned Roadworks Both Directions
    Signage on Charters Towers Road for works on Hirst Street.
    Commencing: 22 March 2016 6:00am
    Concluding:14 May 2016 6:00pm
    No blockage
    No delays expected. Changed traffic conditions.
    Last updated: 28 Apr 2016 11:00
    Information provided by Department of Transport and Main Roads.

  • FLINDERS HIGHWAY

    HUGHENDEN

    Planned Roadworks Both Directions
    Survey and soil testing on the Flinders Highway eastern approach to Hughenden Township. .
    Commencing: 5 May 2016 7:00am
    Concluding:5 May 2016 5:00pm
    Delays expected. Observe signage.
    Allow extra travel time.
    Last updated: 28 Apr 2016 11:49
    Information provided by Department of Transport and Main Roads.

  • CHARTERS TOWERS ROAD

    HYDE PARK

    Planned Roadworks All directions
    Near Bayswater Road intersection.
    Commencing: 26 April 2016 6:00pm
    Concluding:10 May 2016 6:00am
    Lane or lanes reduced
    Delays expected. Changed traffic conditions.
    Last updated: 22 Apr 2016 13:17
    Information provided by Department of Transport and Main Roads.

  • WOOLCOCK STREET

    HYDE PARK

    Planned Roadworks All directions
    near Kings Road intersection.
    Commencing: 26 April 2016 6:00pm
    Concluding:10 May 2016 6:00am
    Lane or lanes reduced
    Delays expected. Changed traffic conditions.
    Last updated: 22 Apr 2016 13:18
    Information provided by Department of Transport and Main Roads.

  • LANNERCOST STREET

    INGHAM

    Planned Roadworks Westbound
    Near Bruce Highway intersection.
    Commencing: 01 March 2016 7:00am
    Concluding:31 May 2016 4:00pm
    Partial lane closures
    No delays expected. Changed traffic conditions.
    Last updated: 08 Apr 2016 10:08
    Information provided by Department of Transport and Main Roads.

  • THURINGOWA DRIVE

    KIRWAN

    Planned Roadworks Southbound
    Corner of Ridley Road.
    Commencing: 25 April 2016 9:00am
    Concluding:6 May 2016 3:00pm
    No blockage
    No delays expected. Observe signage.
    Last updated: 20 Apr 2016 17:34
    Information provided by Department of Transport and Main Roads.

  • ROSS RIVER ROAD

    KIRWAN

    Planned Roadworks Eastbound
    Corner of Ridley Road.
    Commencing: 25 April 2016 9:00am
    Concluding:6 May 2016 3:00pm
    No blockage
    No delays expected. Observe signage.
    Last updated: 21 Apr 2016 17:00
    Information provided by Department of Transport and Main Roads.

  • HERVEY RANGE ROAD

    KIRWAN

    Planned Roadworks Both Directions
    NBN works along Hervey Range Road at various locations.
    Commencing: 25 January 2016 7:00am
    Concluding:30 June 2016 5:00pm
    Partial lane closures
    No delays expected. Observe signage.
    Last updated: 08 Apr 2016 10:08
    Information provided by Department of Transport and Main Roads.

  • CLONCURRY DUCHESS ROAD

    KURIDALA

    Planned Roadworks
    Cloncurry-Dajarra Road between Cloncurry and Duchess. .
    Commencing: 28 March 2016 8:00am
    Concluding:30 September 2016 5:00pm
    Delays expected. Observe signage.
    Allow extra travel time. Works to pave and seal unsealed sections of the Cloncurry-Dajarra Road between Cloncurry and Duchess. Works will commence in March 2016, with an anticipated completion of September 2016, weather permitting.
    Last updated: 27 Apr 2016 11:34
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    MCDESME

    Planned Roadworks Both Directions
    Burdekin Bridge Maintenance Works.
    Commencing: 3 May 2016 9:00am
    Concluding:6 May 2016 2:45pm
    Partial lane closures
    Delays expected. Changed traffic conditions.
    The Department of Transport and Main Roads wishes to advise that single lane closures on the Burdekin Bridge, Home Hill will be taking place (weather permitting) between 9am and 2:45pm on the following dates.
    3 May - 6 May 2016

    Last updated: 18 Apr 2016 10:32
    Information provided by Department of Transport and Main Roads.

  • BARRETT ROAD

    MUTARNEE

    Planned Roadworks Both Directions
    At Ponderosa Road.
    Commencing: 18 March 2016 6:00am
    Concluding:6 May 2016 6:00pm
    Partial lane closures
    No delays expected. Observe signage.
    Last updated: 28 Apr 2016 11:09
    Information provided by Department of Transport and Main Roads.

  • RAILWAY AVENUE

    RAILWAY ESTATE

    Planned Roadworks All directions
    Near Putt Street intersection.
    Commencing: 26 April 2016 6:00pm
    Concluding:10 May 2016 6:00am
    Lane or lanes reduced
    Delays expected. Changed traffic conditions.
    Last updated: 22 Apr 2016 13:17
    Information provided by Department of Transport and Main Roads.

  • RIVERWAY DRIVE

    RASMUSSEN

    Planned Roadworks Both Directions
    Various locations between Bassano Way and Ross River Road.
    Commencing: 11 April 2016 7:00am
    Concluding:30 July 2016 6:00pm
    Partial lane closures
    No delays expected. Changed traffic conditions.
    Last updated: 08 Apr 2016 15:29
    Information provided by Department of Transport and Main Roads.

  • FLINDERS HIGHWAY

    STUART

    Planned Roadworks Eastbound
    Works to install temporary access opposite Burdell Street intersection.
    Commencing: 29 February 2016 6:00am
    Concluding:31 August 2016 6:00pm
    Partial lane closures
    No delays expected. Reduced speed limit (60km/h).
    Last updated: 08 Apr 2016 10:08
    Information provided by Department of Transport and Main Roads.

  • FLINDERS HIGHWAY

    TOONPAN

    Planned Roadworks Both Directions
    Survey works will be happening between Booth Road and Gunnado Road. No site works will happen over the long weekend.
    Commencing: 27 April 2016 9:00am
    Concluding:5 May 2016 3:00pm
    All lanes affected
    Delays expected. Changed traffic conditions.
    Last updated: 26 Apr 2016 14:36
    Information provided by Department of Transport and Main Roads.

Sorted By:
  • FLINDERS STREET

    TOWNSVILLE CITY

    Special Event Both Directions
    Between Denham Street and Stokes Street. Sundays 6am to 3pm.
    Commencing: 05 April 2016 1:01pm
    Concluding:17 June 2021 3:00pm
    No delays expected. Use alternative route.
    Flinders Street between Denham Street and Stokes Street is where a planned event will be occurring every Sunday. This event will commence every Sunday at 6:00am and finish up the same day on 3:00pm. A full closure of Flinders Street between Denham Street and Stokes Street will be in place for the duration of the event.
    Last updated: 08 Apr 2016 10:10
    Information provided by Department of Transport and Main Roads.

  • WOODSTOCK GIRU ROAD

    GIRU

    Special Event
    Various locations.
    Commencing: 10 April 2016 7:00am
    Concluding:28 August 2016 11:00am
    No blockage
    No delays expected. Observe signage.
    Last updated: 11 Apr 2016 16:18
    Information provided by Department of Transport and Main Roads.

Search by location

Reset

Search by route

Reset