  • ROSS RIVER ROAD

    AITKENVALE

    Planned Roadworks Both Directions
    Civil works will be occurring on various roads including Denham Street, Dean Street, Saunders Street, Railway Avenue, Ross River Road,Percy Street, Hugh Street, Woolcock Street and Dalrymple Road.
    Commencing: 24 October 2014, at 2:40pm
    Concluding:30 June 2015, at 12:00am
    No blockage
    No delays expected. Observe signage.
    Last edited: 05 Dec 2014 16:34
    Information provided by Department of Transport and Main Roads.

  • ROSS RIVER ROAD

    AITKENVALE

    Planned Roadworks Southbound
    Reconstructions works occuring on the corner of Ross River Road and Nathan Street.
    Commencing: 24 January 6:00am
    Concluding:24 December 2014, at 6:00pm
    Partial lane closures
    Unknown traffic impact. Observe signage.
    Reconstruction works on at the intersection of Ross River Road and Nathan Street
    Last edited: 10 Dec 2014 13:40
    Information provided by Department of Transport and Main Roads.

  • QUEEN STREET

    AYR

    Planned Roadworks All directions
    Erection and dismantling of decorations and/or banners on Edwards Street and Queen Street.
    Commencing: 01 November 2014, at 12:00am
    Concluding:27 February 2016, at 11:59pm
    No blockage
    No delays expected. Traffic control on scene.
    Last edited: 05 Dec 2014 16:37
    Information provided by Department of Transport and Main Roads.

  • BUNDOCK STREET

    BELGIAN GARDENS

    Planned Roadworks Both Directions
    Various locations along Bundock Streets.
    Commencing: 03 October 2014, at 7:00am
    Concluding:03 February 2015, at 6:00pm
    No blockage
    Unknown traffic impact. Observe signage.
    Last edited: 05 Dec 2014 16:35
    Information provided by Department of Transport and Main Roads.

  • HERVEY RANGE ROAD

    BOHLE PLAINS

    Planned Roadworks All directions
    Speed reductions in place on Hervey Range Road near the transfer station to allow for landscaping works.
    Commencing: 20 November 2014, at 10:32am
    Concluding:11 May 2015, at 12:00am
    No blockage
    No delays expected.
    Last edited: 05 Dec 2014 16:35
    Information provided by Department of Transport and Main Roads.

  • HERVEY RANGE ROAD

    BOHLE PLAINS

    Planned Roadworks
    Works occurring on road reserve in the vicinity of Gumlow Road.
    Commencing: 02 June 2014, at 6:00am
    Concluding:29 May 2015
    No blockage
    No delays expected. Observe signage.
    Last edited: 10 Dec 2014 09:58
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    BRANDON

    Planned Roadworks Southbound
    Sandy Corner to Collinsons Lagoon.
    Commencing: 30 November 2012, at 5:00pm
    Concluding: Dec 2014
    All lanes affected
    Unknown traffic impact. Observe signage.
    Sandy Corner to Collinson's Lagoon
    Road realignment
    Anticipated completion - Dec 2014

    * Presently there is no linemarking, so it is extremely important that motorists do not overtake or exceed the posted speed limits. The Department (TMR) urges all motorists to adhere to these restrictions as Queensland Police regularly patrol this section of the highway.
    Last edited: 05 Dec 2014 16:34
    Information provided by Department of Transport and Main Roads.

  • ROSS RIVER ROAD

    CRANBROOK

    Planned Roadworks
    Works will be occuring in the shoulder between Bamford Lane and Louisa Street .
    Commencing: 23 June 2014, at 9:00am
    Concluding:31 December 2014, at 2:30pm
    No blockage
    Unknown traffic impact.
    Last edited: 05 Dec 2014 16:38
    Information provided by Department of Transport and Main Roads.

  • WOOLCOCK STREET

    CURRAJONG

    Planned Roadworks Both Directions
    Commencing: 12 November 2014, at 9:00am
    Concluding:28 February 2015, at 5:00pm
    No blockage
    No delays expected. Observe signage.
    Last edited: 05 Dec 2014 16:37
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    DEERAGUN

    Planned Roadworks
    Slashing of road reserve on various State-controlled roads.
    Commencing: 27 October 2014, at 6:00am
    Concluding:27 October 2015, at 6:00pm
    No blockage
    No delays expected. Observe signage.
    Last edited: 05 Dec 2014 16:35
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    DEERAGUN

    Planned Roadworks All directions
    Commencing: 20 December 2013, at 12:00am
    Concluding:20 December 2014
    No blockage
    No delays expected. Observe signage.
    Last edited: 05 Dec 2014 16:34
    Information provided by Department of Transport and Main Roads.

  • HALIFAX ROAD

    FORESTHOME

    Planned Roadworks Both Directions
    Along several locations through to the Halifax Lucinda Point Road .
    Commencing: 20 November 2013, at 5:29pm
    Concluding:mid December 2014
    Partial lane closures
    No delays expected. Observe signage.
    INGHAM - HALIFAX - BEMERSIDE ROAD
    HALIFAX - LUCINDA POINT ROAD
    Various Sites
    Reconstruction works
    Anticipated Completion: mid December 2014

    * Natural Disaster Relief and Recovery work along several sections of the Ingham-Halifax-Bemerside Road
    * This project will be delivered in stages and intermittently to best manage wet weather risk.
    * Completion is anticipated for late mid December 2014.
    * motorists can expect lane closures, speed restrictions, delays of up to 15 minutes. Traffic controllers will be on site during the day with traffic lights in operation after hours.
    * Wide load restrictions of more than 3m will be in place and drivers are directed to contact Ben Gibson on 0477 306 851 or Matthew Smith on 0427 122 503 prior to passing through the roadworks, with notice to be provided a minimum of 48 hours in advance.

    Last edited: 05 Dec 2014 16:37
    Information provided by Department of Transport and Main Roads.

  • HUGH STREET

    GARBUTT

    Planned Roadworks
    Commencing: 12 November 2014, at 6:00am
    Concluding:28 February 2015, at 6:00pm
    Partial lane closures
    No delays expected. Observe signage.
    Last edited: 05 Dec 2014 16:32
    Information provided by Department of Transport and Main Roads.

  • WOOLCOCK STREET

    GARBUTT

    Planned Roadworks Both Directions
    Several locations around Townsville.
    Commencing: 20 October 2014, at 6:00am
    Concluding:30 June 2015, at 6:00pm
    No blockage
    Unknown traffic impact. Observe signage.
    Last edited: 05 Dec 2014 16:36
    Information provided by Department of Transport and Main Roads.

  • WOOLCOCK STREET

    GARBUTT

    Planned Roadworks All directions
    Initial works to upgrade the intersection of Woolcock Street and Pilkington Street have commenced.
    Commencing: 10 July 2014, at 5:33pm
    Concluding: TBA
    Partial lane closures
    Delays expected. Traffic control on scene.
    Last edited: 05 Dec 2014 16:34
    Information provided by Department of Transport and Main Roads.

  • CHARTERS TOWERS ROAD

    HERMIT PARK

    Planned Roadworks Both Directions
    Commencing: 30 September 2014, at 7:00am
    Concluding:29 January 2015, at 3:00pm
    No blockage
    No delays expected. Observe signage.
    Several Locations along Charters Towers Road
    Last edited: 05 Dec 2014 16:36
    Information provided by Department of Transport and Main Roads.

  • EIGHTH AVENUE

    HOME HILL

    Planned Roadworks Both Directions
    Erection and dismantling of decorations and/or banners between Sixth Street and Tenth Street.
    Commencing: 01 November 2014, at 12:00am
    Concluding:27 February 2016, at 11:59pm
    All lanes affected
    No delays expected. Traffic control on scene.
    Last edited: 05 Dec 2014 16:37
    Information provided by Department of Transport and Main Roads.

  • CARTWRIGHT STREET

    INGHAM

    Planned Roadworks Both Directions
    Road reconstruction works will be in place near the intersection of Hardy Street.
    Commencing: 03 December 2014, at 10:33am
    Concluding:25 February 2015, at 6:00pm
    Partial lane closures
    Delays expected. Changed traffic conditions.
    Last edited: 05 Dec 2014 16:39
    Information provided by Department of Transport and Main Roads.

  • LANNERCOST STREET

    INGHAM

    Planned Roadworks All directions
    Light installation works are taking place along both Lannercost Street and Herbert Street.
    Commencing: 24 November 2014, at 7:00am
    Concluding:31 January 2015, at 4:00pm
    Partial lane closures
    No delays expected. Observe signage.
    Partial lane closures will be required at various times during these works.
    Last edited: 05 Dec 2014 16:31
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    INGHAM

    Planned Roadworks Both Directions
    Signage on Bruce Highway for works on Lynch Street.
    Commencing: 16 November 2014, at 6:00am
    Concluding:24 December 2014, at 6:00pm
    Partial lane closures
    No delays expected. Observe signage.
    Last edited: 05 Dec 2014 16:32
    Information provided by Department of Transport and Main Roads.

  • HERBERT STREET

    INGHAM

    Planned Roadworks Both Directions
    At the intersection of Gedge Street.
    Commencing: 18 August 2014, at 6:00am
    Concluding:30 January 2015, at 2:00pm
    Partial lane closures
    No delays expected. Observe signage.
    Last edited: 05 Dec 2014 16:31
    Information provided by Department of Transport and Main Roads.

  • HERBERT STREET

    INGHAM

    Planned Roadworks Northbound
    Road reconstruction on Haig Street with lane closures on Herbert Street.
    Commencing: 08 August 2014, at 9:14am
    Concluding:30 January 2015, at 6:00pm
    Partial lane closures
    Unknown traffic impact. Changed traffic conditions.
    Last edited: 05 Dec 2014 16:37
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    INGHAM

    Planned Roadworks Both Directions
    Arnot Creek Bridge 60 kilometre an hour speed restriction in place.
    Commencing: Early 2013
    Concluding:Dec 2014
    No blockage
    No delays expected. Observe signage.
    Ingham to Cardwell Range
    Arnot Creek Bridge

    * The Arnot Creek Bridge is open to two lanes of traffic, however a 60km/hr speed limit over the bridge remains in place until bridge repairs have been investigated and completed.
    * Motorists are advised to observe and obey all signage when travelling through this site.
    Last edited: 05 Dec 2014 16:36
    Information provided by Department of Transport and Main Roads.

  • THURINGOWA DRIVE

    KIRWAN

    Planned Roadworks
    Signage for road works on Hudson Street in place.
    Commencing: 30 June 2014, at 8:00am
    Concluding:30 December 2014, at 4:00pm
    No blockage
    No delays expected. Observe signage.
    Last edited: 05 Dec 2014 16:35
    Information provided by Department of Transport and Main Roads.

  • DALRYMPLE ROAD

    MOUNT LOUISA

    Planned Roadworks All directions
    Intersection of Dalrymple Road, Banfield Drive & Angus Avenue.
    Commencing: 06 June 2014, at 11:48am
    Concluding:24 December 2014, at 5:00pm
    Lane or lanes reduced
    Delays expected. Changed traffic conditions.
    Dalrymple Road Intersection Upgrade
    Intersection of Dalrymple Road, Banfield Drive & Angus Avenue

    Night works will take place (Weather Permitting) from:
    Monday 17 November to Tuesday 2 December 2014
    7.00pm to 5.00am

    In addition to the lane closures, the following restrictions will be necessary:
    Monday 17 November and Thursday 20 November 2014
    *No right turn into Dalrymple Road for traffic travelling from Banfield Drive (Mt Louisa)
    *No through traffic into Angus Avenue for travelling from Banfield Drive (Mt Louisa)
    *No right turn into Dalrymple Road for traffic travelling from Angus Avenue (Heatley)
    *No through traffic into Banfield Drive for traffic travelling from Angus Avenue (Heatley)

    What to expect:
    *Lane closures and detours
    *Traffic delays
    *Traffic controllers on site
    *Speed restrictions

    Works have commenced at the intersection upgrade of Dalrymple Road, Banfield Drive & Angus Avenue intersection, Mt Louisa. The project will remove the current roundabout on Dalrymple Road and replace it with a fully signalised intersection (traffic lights).
    During these works, there will be a number of changed traffic conditions on Dalrymple Road, Banfield Drive and Angus Avenue and at the Bamford Lane Roundabout
    including:
    - Lane closures
    - Speed restrictions
    - Restricted access for cyclists and pedestrians.
    Motorists should expect delays when travelling through the area, particularly during peak hours. To avoid delays, motorists are advised to allow extra travel time when using Dalrymple Road, Banfield Drive & Angus Avenue and consider alternative routes wherever possible during the project



    Last edited: 05 Dec 2014 16:35
    Information provided by Department of Transport and Main Roads.

  • ABBOTT STREET

    OONOONBA

    Planned Roadworks
    Various locations along Abbott Street.
    Commencing: 10 December 2014, at 4:31pm
    Concluding:31 March 2015, at 5:00pm
    No blockage
    No delays expected. Observe signage.
    Last edited: 10 Dec 2014 16:32
    Information provided by Department of Transport and Main Roads.

  • ABBOTT STREET

    OONOONBA

    Planned Roadworks Southbound
    Commencing: 29 October 2014, at 6:00am
    Concluding:24 December 2014, at 3:00pm
    Partial lane closures
    Unknown traffic impact. Observe signage.
    Last edited: 08 Dec 2014 16:22
    Information provided by Department of Transport and Main Roads.

  • BOUNDARY STREET

    RAILWAY ESTATE

    Planned Roadworks Eastbound
    Various locations along Boundary Street.
    Commencing: 10 December 2014, at 4:28pm
    Concluding:31 March 2015, at 5:00pm
    No blockage
    No delays expected. Observe signage.
    Last edited: 10 Dec 2014 16:29
    Information provided by Department of Transport and Main Roads.

  • RAILWAY AVENUE

    RAILWAY ESTATE

    Planned Roadworks Both Directions
    ABS maintenance works at various intersections along Railway Avenue, expect speed reductions at works.
    Commencing: 10 December 2014, at 7:00am
    Concluding:31 March 2015, at 12:00am
    No blockage
    No delays expected. Observe signage.
    Last edited: 10 Dec 2014 16:06
    Information provided by Department of Transport and Main Roads.

  • SAUNDERS STREET

    RAILWAY ESTATE

    Planned Roadworks
    Works on footpath.
    Commencing: 13 June 2014, at 2:30pm
    Concluding:12 August 2015, at 8:00pm
    No blockage
    Unknown traffic impact. Changed traffic conditions.
    Last edited: 05 Dec 2014 16:36
    Information provided by Department of Transport and Main Roads.

  • HERVEY RANGE ROAD

    RANGEWOOD

    Planned Roadworks Both Directions
    Powerline works are taking place between Kalynda Parade and Ridge Drive, resulting in intermittent closures in both directions.
    Commencing: 14 October 2014, at 8:00am
    Concluding:31 December 2014, at 4:30pm
    Lane or lanes reduced
    Delays expected. Traffic control on scene.
    Last edited: 05 Dec 2014 16:35
    Information provided by Department of Transport and Main Roads.

  • STUART DRIVE

    STUART

    Planned Roadworks Both Directions
    Works will occur in the road shoulder in various locations on Stuart Drive.
    Commencing: 06 December 2014, at 7:00am
    Concluding:09 January 2015, at 5:00pm
    Partial lane closures
    No delays expected. Observe signage.
    Last edited: 05 Dec 2014 16:39
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    STUART

    Planned Roadworks Both Directions
    Between Vantassel Street and Stuart Drive. Wide load restrictions apply.
    Commencing: 09 October 2013, at 9:29am
    Concluding: Mid 2015
    Partial lane closures
    Delays expected. Reduced speed limit (60km/h).
    Bruce Highway Upgrade - Vantassel to Cluden
    60km/h speed restriction is in place between Vantassel St and Stuart Drive.

    Works on the Bruce Highway Upgrade (Vantassel to Cluden) will wrap up this Friday 19 December 2014 and recommence on Tuesday 6 January 2015.

    Hunter Street to Townsville Port Road – new section open today.
    Lakeside Drive / Fairfield entrance
    Works on Lakeside Drive will continue in early 2015 and changed traffic conditions will remain in place during the Christmas break. Access to all businesses in this area will remain open at all times.

    When we return in 2015, there will be further traffic changes in place from mid-January as works get underway again.

    Coming up in January 2015
    Abbott Street works – Upgrade works to Abbott Street, near the Racecourse Road intersection will continue. Changed traffic conditions, including a temporary sidetrack, will be in place on Abbott Street.
    Lakeside Drive – Construction of the new Bruce Highway / Lakeside Drive signalised intersection will continue. Changed traffic conditions will be in place at the intersection and on Lakeside Drive and a new entrance to Fairfield will be opened to traffic.
    Hunter Street – Major works will commence at the Bruce Highway / Hunter Street intersection. Changed traffic conditions, lane closures and diversions will be in place to allow crews to build the new signalised intersection.
    Cluden Drive – Works will commence at the Cluden Drive intersection where the new southbound highway will join on to this section of University Road.

    During the Christmas break, a 60 km/h speed restriction will remain in place through the project site.

    The Bruce Highway Upgrade (Vantassel to Cluden) project remains on track for completion in mid-2015.

    Last edited: 17 Dec 2014 14:31
    Information provided by Department of Transport and Main Roads.

  • RIVERWAY DRIVE

    THURINGOWA CENTRAL

    Planned Roadworks Both Directions
    Commencing: 10 October 2014, at 7:00am
    Concluding:30 April 2015, at 5:00pm
    No blockage
    Unknown traffic impact. Observe signage.
    Last edited: 05 Dec 2014 16:35
    Information provided by Department of Transport and Main Roads.

  • STONE RIVER ROAD

    TREBONNE

    Planned Roadworks Both Directions
    Commencing: 11 December 2014, at 7:00am
    Concluding:30 March 2015, at 4:00pm
    Partial lane closures
    No delays expected. Observe signage.
    Last edited: 11 Dec 2014 16:11
    Information provided by Department of Transport and Main Roads.

  • ABERGOWRIE ROAD

    TREBONNE

    Planned Roadworks
    Tarakan Road.
    Commencing: 09 December 2014, at 4:36pm
    Concluding:20 December 2014, at 4:00pm
    No blockage
    No delays expected. Observe signage.
    Last edited: 09 Dec 2014 16:36
    Information provided by Department of Transport and Main Roads.

  • ABERGOWRIE ROAD

    TREBONNE

    Planned Roadworks Both Directions
    Speed restriction in place for reconstruction works on Stallans Lane.
    Commencing: 07 August 2014, at 6:01am
    Concluding:30 January 2015, at 6:00pm
    Partial lane closures
    Unknown traffic impact. Changed traffic conditions.
    Last edited: 05 Dec 2014 16:33
    Information provided by Department of Transport and Main Roads.

  • WOOLCOCK STREET

    WEST END

    Planned Roadworks Northbound
    Commencing: 12 November 2014, at 6:01am
    Concluding:28 February 2015, at 6:00pm
    Partial lane closures
    Unknown traffic impact. Observe signage.
    Last edited: 05 Dec 2014 16:37
    Information provided by Department of Transport and Main Roads.

Sorted By:
  • FLINDERS STREET

    TOWNSVILLE CITY

    Special Event Both Directions
    Between Denham Street and Stokes Street. Sundays 6am to 3pm.
    Commencing: 02 August, at 6:00am
    Concluding:17 June 2021, at 3:00pm
    Road closed both directions
    Unknown traffic impact. Use alternative route.
    Flinders Street between Denham Street and Stokes Street is where a planned event will be occurring every Sunday. This event will commence every Sunday at 6:00am and finish up the same day on 3:00pm. A full closure of Flinders Street between Denham Street and Stokes Street will be in place for the duration of the event.
    Last edited: 14 Nov 2014 17:01
    Information provided by Department of Transport and Main Roads.

Search by location

Reset

Search by route

Reset