Access keys | Skip to primary navigation | Skip to secondary navigation | Skip to content | Skip to footer
Problems viewing this site

Northern

This district covers the Burdekin Shire, Charters Towers Regional, Hinchinbrook Shire, Palm Island Aboriginal Shire and Townsville City councils.

The district's boundaries extend from Ayr to Ingham along the coast and west past Pentland and Greenvale.



 

Sorted By:
  • RIVERWAY DRIVE

    RASMUSSEN

    Multi-vehicle Crash Inbound
    Between Allambie lane and Sonia Street. Diversions are in place.
    One lane blocked
    Delays expected. Emergency services are on scene/en-route.
    Last updated: 27 Jul 2016 15:48
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    CLEMANT

    Animal or wildlife Hazard Both Directions
    Motorists are urged to drive with caution, especially between the Bluewater and Rollingstone area. Please report any sightings by calling 13 19 40.
    No delays expected. Proceed with caution.
    Last updated: 23 Jun 2016 08:53
    Information provided by Department of Transport and Main Roads.

  • BURDEKIN FALLS DAM ROAD

    RAVENSWOOD

    Burdekin Falls Dam Road, Ravenswood to Mount Coolan and Collinsville will be closed indefinitely from 5 pm 20 July 2016 due to flooding at Burdekin Falls Dam Road
    Closed to all vehicles
    do not drive in flood waters.
    Last updated: 22 Jul 2016
    Next update: as conditions change
    Information provided by Department of Transport and Main Roads.

Sorted By:
  • BRUCE HIGHWAY

    ALLIGATOR CREEK

    Planned Roadworks Both Directions
    The Bruce Highway overtaking lanes project is reaching completion. Works are being carried out from Monday to Friday between the hours of 6:30am and 6:30pm. During these hours motorists can expect lane closures, speed restrictions and minor delays.
    Commencing: 18 April 2016 6:00am
    Concluding:5 August 2016 6:30pm
    Both lanes affected
    Delays expected. Changed traffic conditions.
    Last updated: 22 Jul 2016 10:12
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    AYR

    Planned Roadworks Both Directions
    Various locations.
    Commencing: 25 July 2016 6:00am
    Concluding:29 July 2016 6:00pm
    No delays expected. Observe signage.
    Last updated: 08 Jul 2016 16:54
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    BARRATTA

    Planned Roadworks Southbound
    Bannisters Bog to Didgeridoo Lagoon and the West Barratta to Jerona Road.
    Commencing: 22 July 2016 9:38am
    Concluding:30 April 2017 4:00pm
    Partial lane closures
    Delays expected. Changed traffic conditions.
    • Work has commenced on the Bannisters Bog to Didgeridoo Lagoon and the West Barratta to Jerona Road overtaking lane project
    • Works will be conducted between 6am and 6pm, there will be changed traffic conditions, including lanes closures and speed restrictions
    • Traffic Controllers will be on site and motorists can expect minor delays at these works
    • A wide load restriction of more than 3m will be in place
    Anticipated completion: Early 2017
    Last updated: 22 Jul 2016 16:07
    Information provided by Department of Transport and Main Roads.

  • FLINDERS HIGHWAY

    BASALT

    Planned Roadworks Both Directions
    Sign installation on Flinders Highway between Charters Towers and Pentland.
    Commencing: 25 July 2016 7:00am
    Concluding:29 July 2016 4:00pm
    No blockage
    No delays expected. Changed traffic conditions.
    Last updated: 25 Jul 2016 09:40
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    BEMERSIDE

    Planned Roadworks Both Directions
    Works has commenced on the Arnot Creek Bridge replacement project. Speed restrictions and lane closures will be in place.Traffic controllers will be on site and motorists should expect minor delays when travelling through this section of the Bruce Highway.
    Commencing: 06 June 2016 1:40pm
    Concluding:31 December 2016 6:00pm
    Lane or lanes reduced
    Delays expected. Changed traffic conditions.
    Last updated: 27 Jun 2016 15:21
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    BLACK RIVER

    Planned Roadworks Eastbound
    Works are being conducted in shoulder.
    Commencing: 12 April 2016 7:00am
    Concluding:30 July 2016 6:00pm
    No delays expected. Observe signage.
    Last updated: 12 Apr 2016 17:31
    Information provided by Department of Transport and Main Roads.

  • HERVEY RANGE ROAD

    BOHLE PLAINS

    Planned Roadworks Both Directions
    Works are well underway on the Hervey Range Road Widening Project between Kalynda Parade and Rupertswood Drive. There will be changed traffic conditions which include lane closures and speed restrictions with delays of up to 15 minutes.
    Commencing: 26 April 2016 6:00am
    Concluding:31 October 2016 6:00pm
    Lane or lanes reduced
    Delays expected. Changed traffic conditions.
    A load restrictions of more than 3m will be in place and drivers are directed to contact Ben Gibson on 0477 306 851 prior to passing through the roadworks, with notice to be provided a minimum of 48 hours in advance
    Last updated: 27 Jun 2016 10:17
    Information provided by Department of Transport and Main Roads.

  • HERVEY RANGE ROAD

    BOHLE PLAINS

    Planned Roadworks Both Directions
    Between the Ring Road and Landel Court .
    Commencing: 21 April 2016 6:30am
    Concluding:31 July 2016 2:00pm
    Partial lane closures
    No delays expected. Changed traffic conditions.
    Last updated: 29 Jun 2016 15:01
    Information provided by Department of Transport and Main Roads.

  • THE RING ROAD

    BOHLE PLAINS

    Planned Roadworks Both Directions
    Townsville Ring Road Section 4
    Works continuing along the Bruce Highway between Mount Low Parkway and Brabon Road, South of Black River Bridge. Motorists can expect delays while the works are being undertaken.
    Commencing: 05 April 2016 1:10pm
    Concluding:31 January 2017 6:00pm
    Lane or lanes reduced
    Delays expected. Changed traffic conditions.
    Motorists are advised there will be increased heavy vehicles in the vicinity of Kalynda Parade and Dalrymple Road for the duration of this project which is expected to be completed by January 2017

    Last updated: 27 Jun 2016 15:22
    Information provided by Department of Transport and Main Roads.

  • RIVERWAY DRIVE

    CONDON

    Planned Roadworks Both Directions
    NIGHTWORKS starting Sunday 24 July will occur every consecutive night except Friday and Saturday night from 6 pm to 5 am until 4 August 2016.
    Commencing: 24 July 2016 6:00pm
    Concluding:4 August 2016 5:00am
    Partial lane closures
    No delays expected. Proceed with caution.
    Last updated: 22 Jul 2016 17:34
    Information provided by Department of Transport and Main Roads.

  • RIVERWAY DRIVE

    CONDON

    Planned Roadworks Both Directions
    Ring Road Eastbound On Ramp.
    Commencing: 14 June 2016 4:53pm
    Concluding:31 July 2016 6:00pm
    Partial lane closures
    No delays expected. Observe signage.
    Last updated: 14 Jun 2016 16:55
    Information provided by Department of Transport and Main Roads.

  • THURINGOWA DRIVE

    KIRWAN

    Planned Roadworks Southbound
    Hinchinbrook Drive.
    Commencing: 25 July 2016 9:00am
    Concluding:8 August 2016 3:00pm
    Lane or lanes reduced
    No delays expected. Observe signage.
    Last updated: 25 Jul 2016 08:23
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    MCDESME

    Planned Roadworks Both Directions
    Burdekin Bridge Maintenance Works.
    Commencing: 26 July 2016 9:00am
    Concluding:29 July 2016 2:45pm
    Single lane in operation
    Delays expected. Traffic control on scene.
    The Department of Transport and Main Roads wishes to advise that single lane closures on the Burdekin Bridge, Home Hill will be taking place (weather permitting) between 9:00am and 2:45pm on the following dates.
    26 July to 29 July 2016

    To minimise disruptions, Heavy Vehicle Operators with loads wider than three (3) metres must contact Michael Brennan on 0409 643 768 to advise of an anticipated time of arrival to allow for road barriers and other infrastructure to be cleared. Failure to give advance warning will result in further delays.
    Last updated: 14 Jul 2016 09:55
    Information provided by Department of Transport and Main Roads.

  • EYRE STREET

    NORTH WARD

    Planned Roadworks Westbound
    Between Leichhardt Street and Gregory Street.
    Commencing: 6 July 2016 7:00am
    Concluding:17 August 2016 4:30pm
    Partial lane closures
    No delays expected. Proceed with caution.
    Last updated: 06 Jul 2016 16:10
    Information provided by Department of Transport and Main Roads.

  • RAILWAY AVENUE

    RAILWAY ESTATE

    Planned Roadworks Both Directions
    Verge pit replacement at the intersection with Queens Road and Putt Street.
    Commencing: 19 July 2016 6:00pm
    Concluding:3 August 2016 6:00am
    Partial lane closures
    Delays expected. Observe signage.
    Last updated: 19 Jul 2016 11:32
    Information provided by Department of Transport and Main Roads.

  • BOUNDARY STREET

    RAILWAY ESTATE

    Planned Roadworks Both Directions
    Night Works occurring along Boundary Street, affecting the Charters Towers and Boundary Street Intersection and the Railway & Boundary Street Intersection.
    Commencing: 06 June 2016 7:00pm
    Concluding:31 July 2016 5:30am
    Single lane in operation
    No delays expected. Observe signage.
    Last updated: 07 Jul 2016 08:57
    Information provided by Department of Transport and Main Roads.

  • BOUNDARY STREET

    RAILWAY ESTATE

    Planned Roadworks Both Directions
    Day Works occurring along Boundary Street, affecting the Charters Towers and Boundary Street Intersection and the Railway & Boundary Street Intersection.
    Commencing: 06 June 2016 9:30am
    Concluding:31 July 2016 2:30pm
    Single lane in operation
    No delays expected. Observe signage.
    Last updated: 07 Jul 2016 08:58
    Information provided by Department of Transport and Main Roads.

  • BENWELL ROAD

    SOUTH TOWNSVILLE

    Planned Roadworks All directions
    Intersection upgrade works at Archer Street intersection.
    Commencing: 27 May 2016 7:00am
    Concluding:30 September 2016 6:00pm
    Partial lane closures
    Delays expected. Proceed with caution.
    Last updated: 27 May 2016 17:21
    Information provided by Department of Transport and Main Roads.

  • FLINDERS HIGHWAY

    STUART

    Planned Roadworks Eastbound
    Works to install temporary access opposite Burdell Street intersection.
    Commencing: 29 February 2016 6:00am
    Concluding:31 August 2016 6:00pm
    Partial lane closures
    No delays expected. Reduced speed limit (60km/h).
    Last updated: 08 Apr 2016 10:08
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    WUNJUNGA

    Planned Roadworks Both Directions
    Bruce Highway at Yellow Gin Creek Wunjunga.
    Commencing: 25 November 2015 8:00am
    Concluding:31 July 2016 6:00pm
    Partial lane closures
    Delays expected. Proceed with caution.
    The Department of Transport and Main Roads (TMR) advises that work to improve flood immunity and safety at Yellow Gin Creek and its approaches, approximately 30km south of Home Hill, is underway. Works are expected to be completed by July 2016 (weather permitting).

    The Yellow Gin Creek project involves the replacement of the existing low, narrow culverts in the floodway and of the road approaches with a wider bridge and higher level road approaches.

    The project will also include upgrading the Bruce Highway and Beachmount Road intersection, which provides access to the small coastal community in Wunjunga.

    Traffic has been diverted on to the new permanent alignment and newly constructed bridge. construction activities to continue with culvert works and the removal of the temporary sidetrack. Intermittent stoppages may be required to allow construction vehicles to move from one side of the Bruce Highway to the other. Traffic and speed restrictions will remain for the duration of the project

    Last updated: 27 Jun 2016 15:21
    Information provided by Department of Transport and Main Roads.

Sorted By:
  • FLINDERS STREET

    TOWNSVILLE CITY

    Special Event Both Directions
    Between Denham Street and Stokes Street. Sundays 6am to 3pm.
    Commencing: 05 April 2016 1:01pm
    Concluding:17 June 2021 3:00pm
    No delays expected. Use alternative route.
    Flinders Street between Denham Street and Stokes Street is where a planned event will be occurring every Sunday. This event will commence every Sunday at 6:00am and finish up the same day on 3:00pm. A full closure of Flinders Street between Denham Street and Stokes Street will be in place for the duration of the event.
    Last updated: 07 Jul 2016 09:01
    Information provided by Department of Transport and Main Roads.

Search by location

Reset

Search by route

Reset