  • ROSS RIVER ROAD

    AITKENVALE

    Planned Roadworks Eastbound
    Between Nathan Street and Elizabeth Street.
    Commencing: 15 July 2015 6:30am
    Concluding:15 September 2015, at 5:00pm
    Partial lane closures
    No delays expected. Observe signage.
    Footpath and parking lanes will remain closed for the duration of the works
    Last edited: 26 Aug 2015 13:26
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    ALLIGATOR CREEK

    Planned Roadworks Both Directions
    Light installation works at the intersection of Tindal Court.
    Commencing: 15 June 2015 6:00am
    Concluding:16 September 2015, at 7:00pm
    Partial lane closures
    No delays expected. Proceed with caution.
    Last edited: 26 Aug 2015 14:40
    Information provided by Department of Transport and Main Roads.

  • BUNDOCK STREET

    BELGIAN GARDENS

    Planned Roadworks Both Directions
    Between Taylor Street and Beaufort Street.
    Commencing: 18 June 2015 7:00am
    Concluding:15 October 2015, at 5:00pm
    No blockage
    Delays expected. Observe signage.
    Last edited: 26 Aug 2015 13:27
    Information provided by Department of Transport and Main Roads.

  • THE RING ROAD

    BOHLE PLAINS

    Planned Roadworks Both Directions
    Townsville Ring Road Section 4
    From Kalynda Chase intersection to Mt Low intersection of the Bruce Highway.
    Commencing: 07 May 2015, at 10:30am
    Concluding:31 May 2017, at 12:00am
    No blockage
    No delays expected. Changed traffic conditions.
    Motorists are advised there will be increased heavy vehicles in the vicinity of Kalynda Parade and Dalrymple Road for the duration of this project which is expected to be completed by mid 2017.
    Survey works will commence from 6 June 2015 between Veales Road to the overtaking lanes just south of the Black River Bridge.
    Last edited: 26 Aug 2015 13:36
    Information provided by Department of Transport and Main Roads.

  • AYR DALBEG ROAD

    CLARE

    Planned Roadworks Both Directions
    Signage in Ayr Dalbeg Road for works on Lena Road.
    Commencing: 27 August 2015, at 6:00am
    Concluding:02 October 2015, at 6:00pm
    Partial lane closures
    No delays expected. Changed traffic conditions.
    Last edited: 26 Aug 2015 13:01
    Information provided by Department of Transport and Main Roads.

  • RIVERWAY DRIVE

    CONDON

    Planned Roadworks
    Commencing: 10 August 2015, at 6:30am
    Concluding:21 September 2015, at 5:30pm
    No blockage
    No delays expected. Observe signage.
    Last edited: 26 Aug 2015 13:42
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    DEERAGUN

    Planned Roadworks Northbound
    Signage for construction works on Wagner Street.
    Commencing: 07 July 2015, at 6:00am
    Concluding:24 September 2015, at 6:00pm
    No blockage
    Unknown traffic impact. Proceed with caution.
    Last edited: 26 Aug 2015 13:37
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    DEERAGUN

    Planned Roadworks
    Slashing of road reserve on various State-controlled roads.
    Commencing: 27 October 2014, at 6:00am
    Concluding:27 October 2015, at 6:00pm
    No blockage
    No delays expected. Observe signage.
    Last edited: 26 Aug 2015 13:23
    Information provided by Department of Transport and Main Roads.

  • WOOLCOCK STREET

    GARBUTT

    Planned Roadworks All directions
    Various sections along Woolcock Street, Charters Towers Road and Dalrymple Road will have works associated with NBN installations.
    Commencing: 01 July 7:00am
    Concluding:01 November 2015, at 5:00pm
    Partial lane closures
    Unknown traffic impact. Proceed with caution.
    Works along Woolcock Street between Ingham Road and Mather Street, Charters Towers road between Woolcock Street and Kenilworth Avenue and Dalrymple Road between Banfield Drive and O'Keefe Court. There will be closure of shoulder during these works.
    Last edited: 26 Aug 2015 13:24
    Information provided by Department of Transport and Main Roads.

  • BOWEN ROAD

    HERMIT PARK

    Planned Roadworks Both Directions
    Water main replacement works are occurring at the intersection of Carmody Street and Bowen Road.
    Commencing: 10 August 2015 6:00am
    Concluding:30 September 2015, at 6:00pm
    Partial lane closures
    No delays expected. Changed traffic conditions.
    Last edited: 26 Aug 2015 14:27
    Information provided by Department of Transport and Main Roads.

  • EIGHTH AVENUE

    HOME HILL

    Planned Roadworks Both Directions
    Commencing: 03 August 2015, at 6:00am
    Concluding:04 September 2015, at 6:00pm
    Road closed both directions
    No delays expected. Use alternative route.
    Detour in place
    Last edited: 26 Aug 2015 13:38
    Information provided by Department of Transport and Main Roads.

  • WOOLCOCK STREET

    HYDE PARK

    Planned Roadworks Northbound
    Commencing: 27 August 2015, at 5:00am
    Concluding:26 April 2016, at 5:00pm
    Partial lane closures
    Unknown traffic impact. Observe signage.
    Last edited: 27 Aug 2015 17:09
    Information provided by Department of Transport and Main Roads.

  • CHARTERS TOWERS ROAD

    HYDE PARK

    Planned Roadworks All directions
    Charters Towers Road between Woolcock Street and Kenilworth Avenue, along Dalrymple Road between Banfield Drive and O'Keefe Court and along Bruce Highway between Ingham Road and Mather Street.
    Commencing: 18 June 7:00am
    Concluding:15 October 2015, at 5:00pm
    Lane or lanes reduced
    Unknown traffic impact. Observe signage.
    Last edited: 26 Aug 2015 13:25
    Information provided by Department of Transport and Main Roads.

  • WOOLCOCK STREET

    HYDE PARK

    Planned Roadworks Both Directions
    Installation of new water mains on various state controlled roads - Woolcock Street, Ross River Road, Bowen Road and Charters Towers Road.
    Commencing: 15 May 2015, at 7:00am
    Concluding:30 September 2015, at 2:00pm
    Partial lane closures
    Unknown traffic impact. Changed traffic conditions.
    Last edited: 26 Aug 2015 13:22
    Information provided by Department of Transport and Main Roads.

  • LAKESIDE DRIVE

    IDALIA

    Planned Roadworks Both Directions
    Under boring works at River Boulevard intersection.
    Commencing: 24 August 2015, at 7:00am
    Concluding:23 October 2015, at 5:00pm
    Unknown traffic impact. Proceed with caution.
    Last edited: 26 Aug 2015 14:39
    Information provided by Department of Transport and Main Roads.

  • PALM TERRACE

    INGHAM

    Planned Roadworks Southbound
    Commencing: 31 August 2015, at 9:30am
    Concluding:11 September 2015, at 3:00pm
    Partial lane closures
    Unknown traffic impact. Observe signage.
    Last edited: 26 Aug 2015 14:34
    Information provided by Department of Transport and Main Roads.

  • PALM TERRACE

    INGHAM

    Planned Roadworks Southbound
    Lannercost Street.
    Commencing: 24 August 2015, at 9:30am
    Concluding:04 September 2015, at 3:00pm
    No blockage
    No delays expected. Traffic control on scene.
    Last edited: 26 Aug 2015 14:36
    Information provided by Department of Transport and Main Roads.

  • LANNERCOST STREET

    INGHAM

    Planned Roadworks
    Palm Terrace and Lannercost Street.
    Commencing: 24 August 2015, at 9:30am
    Concluding:04 September 2015, at 3:00pm
    No blockage
    No delays expected. Observe signage.
    Last edited: 26 Aug 2015 14:38
    Information provided by Department of Transport and Main Roads.

  • VICTORIA MILL ROAD

    INGHAM

    Planned Roadworks Both Directions
    Construction works along Forest Beach Road.
    Commencing: 07 April 6:00am
    Concluding:30 November 2015, at 6:00pm
    No blockage
    No delays expected. Changed traffic conditions.
    Last edited: 26 Aug 2015 13:25
    Information provided by Department of Transport and Main Roads.

  • THURINGOWA DRIVE

    KIRWAN

    Planned Roadworks Both Directions
    Installation of irrigation.
    Commencing: 31 August 2015, at 9:00am
    Concluding:01 September 2015, at 3:00pm
    Partial lane closures
    No delays expected. Changed traffic conditions.
    Last edited: 26 Aug 2015 14:15
    Information provided by Department of Transport and Main Roads.

  • THURINGOWA DRIVE

    KIRWAN

    Planned Roadworks Both Directions
    Survey works will be occurring in this area.
    Commencing: 27 August 2015, at 8:00am
    Concluding:11 September 2015, at 6:00pm
    Partial lane closures
    No delays expected. Proceed with caution.
    Last edited: 26 Aug 2015 14:42
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    MCDESME

    Planned Roadworks Both Directions
    Burdekin River Bridge.
    Commencing: 31 August 2015, at 9:00am
    Concluding:10 October 2015, at 2:45pm
    Partial lane closures
    Delays expected. Traffic control on scene.
    Last edited: 28 Aug 2015 16:21
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    MCDESME

    Planned Roadworks Both Directions
    Burdekin Bridge - Home Hill
    Maintenance works.
    Commencing: 05 August 2015, at 9:00am
    Concluding:03 September 2015, at 2:45pm
    Partial lane closures
    Delays expected. Changed traffic conditions.

    Motorists are advised that maintenance works will be completed on the Burdekin Bridge, Home Hill between the hours of 9.00am to 2.45pm on the following dates:

    05 August - 07 August 2015
    18 August - 21 August 2015
    25 August - 28 August 2015
    31 August - 03 September 2015

    Speed restrictions and changed traffic conditions including single lane closures and stop/go controls will be in place. Motorists can expect minor delays. The Department thanks motorists for their patience and cooperation while these works are being completed.
    Last edited: 26 Aug 2015 13:37
    Information provided by Department of Transport and Main Roads.

  • ROSS RIVER ROAD

    MUNDINGBURRA

    Planned Roadworks All directions
    Works to install water mains at various locations on Ross River Road , Charters Towers Road, Bowen Road and Woolcock Street.
    Commencing: Currently underway
    Concluding:30 November 2015, at 2:00pm
    Partial lane closures
    Unknown traffic impact. Changed traffic conditions.
    Last edited: 26 Aug 2015 14:36
    Information provided by Department of Transport and Main Roads.

  • CHARTERS TOWERS ROAD

    MYSTERTON

    Planned Roadworks Both Directions
    Signage on Charters Towers Road for works on Jameson Street.
    Commencing: 20 August 2015, at 6:00am
    Concluding:03 September 2015, at 6:00pm
    No blockage
    No delays expected. Changed traffic conditions.
    Last edited: 26 Aug 2015 13:20
    Information provided by Department of Transport and Main Roads.

  • EYRE STREET

    NORTH WARD

    Planned Roadworks Eastbound
    From the Gregory Street intersection.
    Commencing: 24 August 2015, at 8:00am
    Concluding:04 September 2015, at 4:00pm
    Partial lane closures
    No delays expected. Observe signage.
    Last edited: 26 Aug 2015 14:37
    Information provided by Department of Transport and Main Roads.

  • EYRE STREET

    NORTH WARD

    Planned Roadworks Both Directions
    Commencing: 30 April 2015, at 7:00am
    Concluding:01 October 2015, at 5:00pm
    Partial lane closures
    No delays expected. Observe signage.
    Last edited: 26 Aug 2015 13:45
    Information provided by Department of Transport and Main Roads.

  • RAILWAY AVENUE

    RAILWAY ESTATE

    Planned Roadworks Both Directions
    Signage for works on Brooks Street.
    Commencing: 10 August 2015 6:30am
    Concluding:28 September 2015, at 5:30pm
    No blockage
    Unknown traffic impact. Reduced speed limit (40km/h).
    Last edited: 26 Aug 2015 13:38
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    STUART

    Planned Roadworks
    Various low impact areas around Townsville.
    Commencing: 19 February 2015, at 7:00am
    Concluding:21 March 2016, at 6:00pm
    Partial lane closures
    No delays expected. Observe signage.
    Last edited: 26 Aug 2015 13:28
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    STUART

    Planned Roadworks Both Directions
    Bruce Highway Upgrade (Vantassel to Cluden) - Highway Duplication.
    Commencing: 09 October 2013, at 9:00am
    Concluding:Late 2015
    Partial lane closures
    Delays expected. Changed traffic conditions.
    The Bruce Highway Upgrade (Vantassel to Cluden) project is now entering its final stages of completion. Work is progressing well with the majority of the works at Stuart Drive accomplished.

    The last few months has seen a lot of activity towards the northern end of the project site, and the Department of Transport and Main Roads (TMR) can now confirm that major works will be completed by the end of September 2015.

    Important works across the Vantassel to Cluden project include:

    From Zinc Avenue to Stuart Creek Bridge
    Motorists are now able to travel along two lanes of traffic in both directions, speed and lane restrictions may occur from time to time to allow for finalisation works on the centre medians and road shoulders. These temporary lane closures will provide a safe environment for work crews and motorists. Once all works are finalised, the 80km/hr speed limit will apply throughout this section.

    Hunter Street signalised intersection
    During the past couple of weeks motorists have also become acquainted with the new Hunter Street traffic lights. Some fine-tuning will continue to occur during the next couple of weeks.

    From Stuart Creek Bridge to Lakeside Drive
    It is anticipated that both northbound and southbound signals at Lakeside Drive will be operational from Friday 31 July 2015.

    Landscaping, drainage, signage and other finalisation works will continue for the next month in this section. Lane closures and speed restrictions will remain in place throughout this area to ensure the safety of our workers and motorists.

    From Lakeside Drive to Cluden Drive
    From Friday 31 July 2015, all motorists using Stuart Drive will be diverted to the new permanent alignment, therefore the Bruce Highway and Stuart Drive intersection will operate under the new dual traffic signals. During the following weeks, TMR’s Traffic Management Centre will monitor the intersection and fine-tune the light sequencing.

    The temporary roundabout at Cluden Drive will be removed and as previously advised in project updates, due to the split dual lane carriageways, Newton Street will change to a left in / left out configuration. This new permanent arrangement will permit U-turn manoeuvres at the Macarthur Drive / Melton Black intersection, and the Bruce Highway and Stuart Drive intersection. Alternate access to Stuart Drive and the Bruce Highway from Newton Street will be via Edison Street, Wulguru.

    Pedestrian movements will also be moved over to the permanent arrangement from Friday 31 July 2015. Pedestrians will be directed to the new signalised pedestrian facilities. Green cycle lanes through the new intersections will be progressively painted over the next month.

    In addition, the following activities will be occurring in this area:

    1. Decommissioning and removal of the northbound side-track between Lakeside Drive and Stuart Drive
    2. Final road pavement works continues for the remainder of this week
    3. Works on the centre medians, concreting and lighting works
    4. Landscaping, drainage, signage and other finalisation works will also continue
    5. Periodic lane closures and speed restrictions will be in place as required to ensure the safety of our workers and motorists

    Other information
    Linemarking crews will be working night shifts to finalise linemarking throughout the project site and again lane and speed restrictions will be in place
    Last edited: 26 Aug 2015 13:29
    Information provided by Department of Transport and Main Roads.

  • THURINGOWA DRIVE

    THURINGOWA CENTRAL

    Planned Roadworks All directions
    Various locations along Thuringowa Drive. Works will take place along the media strip.
    Commencing: 20 July 2015 7:00am
    Concluding:20 October 2015, at 5:00pm
    Partial lane closures
    Unknown traffic impact. Reduced speed limit (40km/h).
    Last edited: 26 Aug 2015 13:31
    Information provided by Department of Transport and Main Roads.

  • RIVERWAY DRIVE

    THURINGOWA CENTRAL

    Planned Roadworks Both Directions
    Commencing: 10 October 2014, at 7:00am
    Concluding:31 December 2015, at 5:00pm
    No blockage
    Unknown traffic impact. Observe signage.
    Last edited: 26 Aug 2015 13:23
    Information provided by Department of Transport and Main Roads.

  • DENHAM STREET

    TOWNSVILLE CITY

    Planned Roadworks Southbound
    Commencing: 09 July 2015, at 8:00am
    Concluding:14 September 2015, at 6:00pm
    Partial lane closures
    Unknown traffic impact. Observe signage.
    Last edited: 26 Aug 2015 13:21
    Information provided by Department of Transport and Main Roads.

  • PERCY STREET

    WEST END

    Planned Roadworks Westbound
    Water main repair on footpath, corner of Percy Street and Nix Street.
    Commencing: 18 August 2015, at 8:00am
    Concluding:25 September 2015, at 4:00pm
    Unknown traffic impact. Proceed with caution.
    Last edited: 31 Aug 2015 15:03
    Information provided by Department of Transport and Main Roads.

  • WOOLCOCK STREET

    WEST END

    Planned Roadworks
    Various Roads within Townsville region.
    Commencing: 12 March 2015, at 6:00am
    Concluding:09 March 2016, at 3:00pm
    No blockage
    No delays expected. Observe signage.
    Last edited: 26 Aug 2015 14:33
    Information provided by Department of Transport and Main Roads.

Sorted By:
  • FLINDERS STREET

    TOWNSVILLE CITY

    Special Event Both Directions
    Between Denham Street and Stokes Street. Sundays 6am to 3pm.
    Commencing: 02 August, at 6:00am
    Concluding:17 June 2021, at 3:00pm
    Unknown traffic impact. Use alternative route.
    Flinders Street between Denham Street and Stokes Street is where a planned event will be occurring every Sunday. This event will commence every Sunday at 6:00am and finish up the same day on 3:00pm. A full closure of Flinders Street between Denham Street and Stokes Street will be in place for the duration of the event.
    Last edited: 14 May 2015 10:49
    Information provided by Department of Transport and Main Roads.

Search by location

Reset

Search by route

Reset