Access keys | Skip to primary navigation | Skip to secondary navigation | Skip to content | Skip to footer
Problems viewing this site

Northern

This district covers the Burdekin Shire, Charters Towers Regional, Hinchinbrook Shire, Palm Island Aboriginal Shire and Townsville City councils.

The district's boundaries extend from Ayr to Ingham along the coast and west past Pentland and Greenvale.



 

Sorted By:
  • BRUCE HIGHWAY

    CLEMANT

    Animal or wildlife Hazard All directions
    No blockage
    Unknown traffic impact. Proceed with caution.
    Motorists are urged to drive with caution, especially between the Bluewater and Rollingstone area. Please report any sightings by calling 13 19 40
    Last edited: 05 Feb 2016 14:06
    Information provided by Department of Transport and Main Roads.

Sorted By:
  • ROSS RIVER ROAD

    AITKENVALE

    Planned Roadworks Inbound
    Between Nathan Street and Elizabeth Street.
    Commencing: 15 February 2016 9:00am
    Concluding:28 February 2016 3:00pm
    No delays expected. Observe signage.
    Last edited: 02 Feb 2016 11:43
    Information provided by Department of Transport and Main Roads.

  • ROSS RIVER ROAD

    AITKENVALE

    Planned Roadworks Westbound
    Westbound, approaching Nathan Street.
    Commencing: 17 November 2015 6:00am
    Concluding:27 October 2016 6:00pm
    No blockage
    No delays expected. Observe signage.
    Last edited: 01 Dec 2015 12:10
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    ALLIGATOR CREEK

    Planned Roadworks Both Directions
    Construction of overtaking lanes are underway between Alligator Creek Road and Allendale Drive.
    Commencing: 16 November 2015 6:30am
    Concluding:30 May 2016 6:30pm
    Both lanes affected
    Delays expected. Changed traffic conditions.
    Portable traffic signals will be in place from 3 February 2016 for approximately 3 weeks.
    Last edited: 02 Feb 2016 16:54
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    AYR

    Planned Roadworks Both Directions
    Commencing: 25 January 2016 7:00am
    Concluding:30 June 2016 5:00pm
    Partial lane closures
    No delays expected. Observe signage.
    Last edited: 22 Jan 2016 16:19
    Information provided by Department of Transport and Main Roads.

  • BUNDOCK STREET

    BELGIAN GARDENS

    Planned Roadworks Westbound
    Between Evans Street and Johns Street.
    Commencing: 08 February 2016 9:00am
    Concluding:20 February 2016 3:00pm
    No delays expected. Proceed with caution.
    Last edited: 01 Feb 2016 12:06
    Information provided by Department of Transport and Main Roads.

  • THE RING ROAD

    BOHLE PLAINS

    Planned Roadworks Both Directions
    Townsville Ring Road Section 4
    From Kalynda Chase intersection to Mt Low intersection of the Bruce Highway.
    Commencing: 07 May 2015
    Concluding:31 May 2017 12:00am
    Both lanes affected
    Delays expected. Changed traffic conditions.
    Motorists are advised there will be increased heavy vehicles in the vicinity of Kalynda Parade and Dalrymple Road for the duration of this project which is expected to be completed by mid 2017.

    Works will be continuing along the Bruce Highway between Mt Low Parkway and Brabon road, south of Black River Bridge as part of the Ring Road Section 4 project. Speed reductions are in place.
    Last edited: 15 Jan 2016 14:50
    Information provided by Department of Transport and Main Roads.

  • RACECOURSE ROAD

    CLUDEN

    Planned Roadworks Northbound
    150 metres from corner of Bruce Highway and Jurekey Street.
    Commencing: 7 October 2015 7:30am
    Concluding:25 March 2016 4:00pm
    No blockage
    No delays expected. Proceed with caution.
    Last edited: 21 Jan 2016 15:19
    Information provided by Department of Transport and Main Roads.

  • NATHAN STREET

    CRANBROOK

    Planned Roadworks Southbound
    Traffic control for vehicles entering Arthur Street.
    Commencing: 8 February 2016 9:00am
    Concluding:20 February 2016 3:00pm
    No blockage
    No delays expected. Observe signage.
    Last edited: 01 Feb 2016 11:30
    Information provided by Department of Transport and Main Roads.

  • ROSS RIVER ROAD

    CRANBROOK

    Planned Roadworks Eastbound
    Commencing: 1 February 2016 8:00am
    Concluding:31 March 2016 4:00pm
    Partial lane closures
    No delays expected. Observe signage.
    Last edited: 29 Jan 2016 17:03
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    CROMARTY

    Planned Roadworks Northbound
    works to remove culverts on road shoulder near Mackenzie Creek.
    Commencing: 11 February 2016 6:00am
    Concluding:18 February 2016 6:00pm
    Unknown traffic impact. Proceed with caution.
    Last edited: 10 Feb 2016 16:23
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    DEERAGUN

    Planned Roadworks Both Directions
    Slashing of road reserve in area of advertising devices. Works will take place along various roads within Northern District.
    Commencing: 18 November 2015 6:00am
    Concluding:27 October 2016 6:00pm
    No blockage
    No delays expected. Observe signage.
    speed reduction will be in place during the works
    Last edited: 08 Jan 2016 12:08
    Information provided by Department of Transport and Main Roads.

  • DUCKWORTH STREET

    GARBUTT

    Planned Roadworks Southbound
    Southbound Parking Lane.
    Commencing: 15 February 2016 9:00am
    Concluding:22 February 2016 3:00pm
    No blockage
    Unknown traffic impact. Observe signage.
    Last edited: 01 Feb 2016 17:07
    Information provided by Department of Transport and Main Roads.

  • WOOLCOCK STREET

    GARBUTT

    Planned Roadworks
    Commencing: 1 February 2016 6:30am
    Concluding:28 February 2016 4:30pm
    Partial lane closures
    No delays expected. Observe signage.
    Last edited: 29 Jan 2016 16:25
    Information provided by Department of Transport and Main Roads.

  • NATHAN STREET

    HEATLEY

    Planned Roadworks Both Directions
    Corner of Reichelmann Street .
    Commencing: 8 February 2016 9:00am
    Concluding:20 February 2016 3:00pm
    No blockage
    No delays expected. Observe signage.
    Last edited: 01 Feb 2016 12:09
    Information provided by Department of Transport and Main Roads.

  • BOWEN ROAD

    HERMIT PARK

    Planned Roadworks Southbound
    Southbound Shoulder .
    Commencing: 15 February 2016 9:00am
    Concluding:26 February 2016 3:00pm
    No blockage
    No delays expected. Observe signage.
    Last edited: 01 Feb 2016 17:06
    Information provided by Department of Transport and Main Roads.

  • WOOLCOCK STREET

    HYDE PARK

    Planned Roadworks Both Directions
    East of Kings Road intersection.
    Commencing: 15 February 2016 9:00am
    Concluding:19 February 2016 3:00pm
    Partial lane closures
    Unknown traffic impact. Observe signage.
    REFU1059/4863
    Last edited: 02 Feb 2016 16:57
    Information provided by Department of Transport and Main Roads.

  • WOOLCOCK STREET

    HYDE PARK

    Planned Roadworks Both Directions
    Corner of Woolcock Street and Somer Street.
    Commencing: 13 November 2015 7:00am
    Concluding:29 February 2016 5:00pm
    No blockage
    No delays expected. Observe signage.
    Last edited: 08 Jan 2016 12:54
    Information provided by Department of Transport and Main Roads.

  • WOOLCOCK STREET

    HYDE PARK

    Planned Roadworks Northbound
    Landscaping works between Kings Road and Barryman Street.
    Commencing: 27 August 2015 5:00am
    Concluding:26 April 2016 5:00pm
    Partial lane closures
    Unknown traffic impact. Observe signage.
    Last edited: 08 Jan 2016 12:49
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    INGHAM

    Planned Roadworks
    Various Roads.
    Commencing: 1 February 2016 6:00am
    Concluding:31 January 2017 6:00pm
    Unknown traffic impact. Observe signage.
    Last edited: 05 Feb 2016 16:27
    Information provided by Department of Transport and Main Roads.

  • VICTORIA MILL ROAD

    INGHAM

    Planned Roadworks Both Directions
    Commencing: 21 January 2016 12:01pm
    Concluding:29 February 2016 6:00pm
    No blockage
    No delays expected. Observe signage.
    Speed reduction will be in place for the duration of these works.
    Last edited: 21 Jan 2016 12:03
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    INGHAM

    Planned Roadworks
    Between Como Road and Tokalon Street.
    Commencing: 23 November 2015, at 6:00am
    Concluding:31 March 2016, at 6:00pm
    No blockage
    No delays expected. Observe signage.
    Last edited: 20 Nov 2015 08:29
    Information provided by Department of Transport and Main Roads.

  • HERVEY RANGE ROAD

    KIRWAN

    Planned Roadworks All directions
    Commencing: 25 January 2016 7:00am
    Concluding:30 June 2016 5:00pm
    Partial lane closures
    Unknown traffic impact. Observe signage.
    Last edited: 22 Jan 2016 16:18
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    MCDESME

    Planned Roadworks Both Directions
    Commencing: 28 January 2016 8:45am
    Concluding:30 December 2016 4:30pm
    Partial lane closures
    Delays expected.
    The Department of Transport and Main Roads wishes to advise that single lane closures on the Burdekin Bridge Home Hill will be taking place (weather permitting) between 9am and 2:45pm on the following dates.
    09 February to 12 February
    15 February to 19 February.
    During this time, speed reductions will be in place and the site will be under traffic control. Both North and South bound road users should expect delays.
    Last edited: 02 Feb 2016 15:49
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    MCDESME

    Planned Roadworks Both Directions
    Between Ayr-Dalbeg Road and Milburn Road.
    Commencing: 22 January 2016 7:00am
    Concluding:21 February 2016 5:00pm
    Partial lane closures
    Unknown traffic impact. Proceed with caution.
    Last edited: 22 Jan 2016 13:29
    Information provided by Department of Transport and Main Roads.

  • DALRYMPLE ROAD

    MOUNT LOUISA

    Planned Roadworks Inbound
    Footpath works at Bamford Lane Roundabout.
    Commencing: 23 November 2015 8:30am
    Concluding:31 March 2016 4:00pm
    No blockage
    No delays expected. Reduced speed limit (60km/h).
    Last edited: 21 Jan 2016 12:09
    Information provided by Department of Transport and Main Roads.

  • WARBURTON STREET

    NORTH WARD

    Planned Roadworks Westbound
    Corner of Landsborough Street.
    Commencing: 8 February 2016 9:00am
    Concluding:20 February 2016 3:00pm
    Partial lane closures
    Unknown traffic impact. Observe signage.
    Last edited: 01 Feb 2016 12:06
    Information provided by Department of Transport and Main Roads.

  • HACKETT TERRACE

    RICHMOND HILL

    Planned Roadworks Both Directions
    Commencing: 3 February 2016 7:00am
    Concluding:3 February 2016 5:00pm
    No blockage
    No delays expected. Observe signage.
    Speed reductions in place near the intersection of Holliman Street.
    Last edited: 02 Feb 2016 17:05
    Information provided by Department of Transport and Main Roads.

  • FLINDERS HIGHWAY

    RICHMOND HILL

    Planned Roadworks All directions
    Various Roads in Charters Towers.
    Commencing: 1 February 2016 6:00am
    Concluding:31 January 2017 6:00pm
    Unknown traffic impact. Observe signage.
    Last edited: 05 Feb 2016 16:24
    Information provided by Department of Transport and Main Roads.

  • BOWEN ROAD

    ROSSLEA

    Planned Roadworks Northbound
    Between Love lane and McQueen Street.
    Commencing: 15 February 2016 9:00am
    Concluding:22 February 2016 3:00pm
    No delays expected. Observe signage.
    Last edited: 02 Feb 2016 11:53
    Information provided by Department of Transport and Main Roads.

  • BOWEN ROAD

    ROSSLEA

    Planned Roadworks Southbound
    Between Hodel Street and Lindsay Street.
    Commencing: 15 February 2016 9:00am
    Concluding:26 February 2016 3:00pm
    Partial lane closures
    Unknown traffic impact. Proceed with caution.
    Last edited: 02 Feb 2016 11:50
    Information provided by Department of Transport and Main Roads.

  • BOUNDARY STREET

    SOUTH TOWNSVILLE

    Planned Roadworks Westbound
    Between Fourth Avenue and Samphire Road.
    Commencing: 15 February 2016 9:00am
    Concluding:26 February 2016 3:00pm
    No delays expected. Observe signage.
    Last edited: 02 Feb 2016 11:47
    Information provided by Department of Transport and Main Roads.

  • DEAN STREET

    SOUTH TOWNSVILLE

    Planned Roadworks Eastbound
    Commencing: 8 February 2016 7:00am
    Concluding:19 February 2016 5:00pm
    Partial lane closures
    No delays expected. Observe signage.
    Last edited: 02 Feb 2016 16:36
    Information provided by Department of Transport and Main Roads.

  • BENWELL ROAD

    SOUTH TOWNSVILLE

    Planned Roadworks All directions
    At Archer Street intersection.
    Commencing: 23 January 2016 8:00am
    Concluding:19 February 2016 5:00pm
    Partial lane closures
    Unknown traffic impact. Changed traffic conditions.
    Last edited: 22 Jan 2016 14:22
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    STUART

    Planned Roadworks
    NBN works on various low impact areas around Townsville.
    Commencing: 19 February 2015 7:00am
    Concluding:21 March 2016 6:00pm
    Partial lane closures
    No delays expected. Observe signage.
    Last edited: 08 Jan 2016 12:57
    Information provided by Department of Transport and Main Roads.

  • THURINGOWA DRIVE

    THURINGOWA CENTRAL

    Planned Roadworks Both Directions
    Upgrade works happening at the Burnda and Hinchinbrook Street roundabouts. Single lane closures and speed reductions will be in place for the duration of these works..
    Commencing: 10 February 2016 1:24pm
    Concluding:30 April 2016 5:00pm
    Lane or lanes reduced
    Delays expected. Proceed with caution.
    Last edited: 10 Feb 2016 13:26
    Information provided by Department of Transport and Main Roads.

  • WOOLCOCK STREET

    WEST END

    Planned Roadworks
    Various Roads within Townsville region.
    Commencing: 12 March 2015, at 6:00am
    Concluding:09 March 2016, at 3:00pm
    No blockage
    No delays expected. Observe signage.
    Last edited: 06 Nov 2015 09:30
    Information provided by Department of Transport and Main Roads.

  • BRUCE HIGHWAY

    WUNJUNGA

    Planned Roadworks Both Directions
    Bruce Highway at Yellow Gin Creek Wunjunga..
    Commencing: 25 November 2015 2:11pm
    Concluding:30 April 2016 6:00pm
    Partial lane closures
    Delays expected. Changed traffic conditions.
    The Department of Transport and Main Roads (TMR) advises that work to improve flood immunity and safety at Yellow Gin Creek and its approaches, approximately 30km south of Home Hill, is underway. Works are expected to be completed by late 2016 (weather permitting).

    The Yellow Gin Creek project involves the replacement of the existing low, narrow culverts in the floodway and of the road approaches with a wider bridge and higher level road approaches.

    The project will also include upgrading the Bruce Highway and Beachmount Road intersection, which provides access to the small coastal community in Wunjunga.

    Temporary Detour
    The construction of a temporary two-way sealed side track (one lane in each direction) is now complete. This will allow works to continue on the permanent alignment while maintaining connectivity and minimising impacts to Bruce Highway traffic.

    On Friday 13 November 2015, all traffic has been moved onto the temporary side-track. A 60 km/h speed limit has been applied through the project area, road signage is in place to guide motorists through the detour.

    All heavy vehicle operators with vehicles/loads in excess of 3.5m must contact Joe Barker on mobile number: 0409 540 332 at least 48 hours in advance to advise of an anticipated time of arrival to allow for road barriers and other infrastructure to be cleared. Failure to provide sufficient advance notice will result in travel delays.

    Advance warning signs have been erected to notify road users of these changes and motorists are urged to observe and obey all signage when travelling through this site. Your patience and cooperation is appreciated while these works are underway.

    Last edited: 15 Jan 2016 14:41
    Information provided by Department of Transport and Main Roads.

Sorted By:
  • FLINDERS STREET

    TOWNSVILLE CITY

    Special Event Both Directions
    Between Denham Street and Stokes Street. Sundays 6am to 3pm.
    Commencing: 02 August, at 6:00am
    Concluding:17 June 2021, at 3:00pm
    Partial lane closures
    Unknown traffic impact. Use alternative route.
    Flinders Street between Denham Street and Stokes Street is where a planned event will be occurring every Sunday. This event will commence every Sunday at 6:00am and finish up the same day on 3:00pm. A full closure of Flinders Street between Denham Street and Stokes Street will be in place for the duration of the event.
    Last edited: 16 Nov 2015 16:43
    Information provided by Department of Transport and Main Roads.

Search by location

Reset

Search by route

Reset