  • PACIFIC HIGHWAY

    ROBINA

    Congestion Northbound
    Exit 82 Robina.
    All lanes affected
    Delays expected. Allow extra travel time.
    Last updated: 31 May 2016 17:28
    Information provided by Department of Transport and Main Roads.

  • BRISBANE ROAD

    COOMBABAH

    Stationary Vehicle Westbound
    Intersection of Computer Street.
    Lane or lanes reduced
    Delays expected. Allow extra travel time.
    Last updated: 31 May 2016 17:15
    Information provided by Department of Transport and Main Roads.

  • LOGAN MOTORWAY

    BERRINBA

    Congestion Eastbound
    Congestion back after Beaudesert Road off ramp due to crash westbound after Wembley Road on ramp.
    No blockage
    Delays expected. Motorists are urged to show patience.
    Last updated: 31 May 2016 17:04
    Information provided by Department of Transport and Main Roads.

  • LOGAN MOTORWAY

    BERRINBA

    Multi-vehicle Crash Westbound
    Congestion back to Kingston Road.
    Partial lane closures
    Long delays expected. Proceed with caution.
    Last updated: 31 May 2016 17:00
    Information provided by Department of Transport and Main Roads.

  • PACIFIC MOTORWAY

    SLACKS CREEK

    Congestion Northbound
    From Loganholme to Springwood.
    All lanes affected
    Long delays expected. Allow extra travel time.
    Last updated: 31 May 2016 17:33
    Information provided by Department of Transport and Main Roads.

  • SMITH STREET

    PARKWOOD

    Congestion Westbound
    Olsen Avenue to Pacific Motorway.
    All lanes affected
    Delays expected. Allow extra travel time.
    Last updated: 31 May 2016 16:23
    Information provided by Department of Transport and Main Roads.

  • PACIFIC HIGHWAY

    ROBINA

    Congestion Southbound
    Exit 85 Robina to Exit 89 Tallebudgera.
    All lanes affected
    Delays expected. Allow extra travel time.
    Last updated: 31 May 2016 17:21
    Information provided by Department of Transport and Main Roads.

Sorted By:
  • CURRUMBURRA ROAD

    ASHMORE

    Planned Roadworks All directions
    Lane closures on all approaches and through the Ross Street/Ashmore Road roundabout from 8pm Friday 3 June until new traffic signals are SWITCHED ON over the 4-5 June weekend..
    Commencing: 4 January 2016 10:45am
    Concluding:30 August 2016 10:45am
    All lanes affected
    Delays expected. Use alternative route.
    Lane closures on all approaches and through the Ross Street/Ashmore Road roundabout from 8pm Friday 3 June until new traffic signals are SWITCHED ON over the 4-5 June weekend.
    Last updated: 27 May 2016 10:33
    Information provided by Department of Transport and Main Roads.

  • ASHMORE ROAD

    BENOWA

    Planned Roadworks All directions
    Lane closures on all approaches and through the Ross Street/Ashmore Road roundabout from 8pm Friday 3 June until new traffic signals are SWITCHED ON over the 4-5 June weekend..
    Commencing: 04 January 2016 10:45am
    Concluding:29 July 2016 10:45am
    All lanes affected
    Delays expected. Use alternative route.
    Lane closures on all approaches and through the Ross Street/Ashmore Road roundabout from 8pm Friday 3 June until new traffic signals are SWITCHED ON over the 4-5 June weekend.
    Last updated: 27 May 2016 10:35
    Information provided by Department of Transport and Main Roads.

  • ROSS STREET

    BENOWA

    Planned Roadworks All directions
    Lane closures on all approaches and through the Ross Street/Ashmore Road roundabout from 8pm Friday 3 June until new traffic signals are SWITCHED ON over the 4-5 June weekend..
    Commencing: 04 January 2016 10:31am
    Concluding:30 August 2016 10:30am
    All lanes affected
    Delays expected. Use alternative route.
    Lane closures on all approaches and through the Ross Street/Ashmore Road roundabout from 8pm Friday 3 June until new traffic signals are SWITCHED ON over the 4-5 June weekend.
    Last updated: 27 May 2016 10:37
    Information provided by Department of Transport and Main Roads.

  • GOLD COAST HIGHWAY

    BILINGA

    Planned Roadworks Northbound
    Between Musgrave Street and the New South Wales border.
    .
    Commencing: 05 June 2016 6:00am
    Concluding:05 July 2016 6:00pm
    One lane closed
    Delays expected. Use alternative route.
    Last updated: 24 May 2016 11:20
    Information provided by Department of Transport and Main Roads.

  • BOONAH RATHDOWNEY ROAD

    BOONAH

    Planned Roadworks Both Directions
    Removal of trees and other roadside hazards, as well as the installation of new guardrail in selected locations between Boonah and Rathdowney..
    Commencing: 11 April 2016 10:55am
    Concluding:30 June 2016 5:00pm
    Partial lane closures
    No delays expected. Changed traffic conditions.
    During construction, motorists can expect:
     Changed traffic conditions along Boonah—Rathdowney Road
     Possible temporary lane closures, reduced speed limits and short delays along Boonah—Rathdowney Road to complete the safe removal of vegetation along the roadside
     Stop/slow traffic control may be in place through the roadwork zone.
    Please pay attention to local signage and traffic control and allow extra travel time.
    Last updated: 11 Apr 2016 10:57
    Information provided by Department of Transport and Main Roads.

  • DARNAY ROAD

    BROADBEACH WATERS

    Planned Roadworks Both Directions
    Commencing: 12 May 2016 12:00am
    Concluding:10 June 2016 2:00pm
    Partial lane closures
    Delays expected. Use alternative route.
    As part of works in the southern section, access to Darnay Road will temporarily change as major pavement works are completed at the Bermuda Street intersection. Temporary access changes for motorists entering and exiting Darnay Road will be in place during the first stage of works at the Bermuda Street intersection.
    Last updated: 24 May 2016 13:09
    Information provided by Department of Transport and Main Roads.

  • BERMUDA STREET

    BROADBEACH WATERS

    Planned Roadworks Both Directions
    Markeri Street to Executive Drive.
    Commencing: 27 April 2016 12:00am
    Concluding:1 July 2016 3:30pm
    Partial lane closures
    Delays expected. Reduced speed limit (60km/h).
    Last updated: 27 Apr 2016 15:37
    Information provided by Department of Transport and Main Roads.

  • BERMUDA STREET

    BROADBEACH WATERS

    Planned Roadworks Both Directions
    Between Fremar Street and Rudd Street.
    Commencing: 15 February 2016 4:00pm
    Concluding:31 August 2016 9:45am
    Lane or lanes reduced
    Delays expected. Changed traffic conditions.
    The current on-street parking lanes, in both directions, on this stretch of Bermuda Street will be closed and removed permanently from 4pm on Monday 15 February 2016. Please ensure all vehicles parked in this area are off the road by 6pm Monday 15 February. This removal of parking will be enforced and this area becomes a no parking at any time zone. Please ensure you follow all directions of road crew and note the signage in the area. Traffic conditions will be changed and lane closures are expected. We thank you for your patience whilst we construct this road upgrade.
    Last updated: 10 Feb 2016 11:50
    Information provided by Department of Transport and Main Roads.

  • BUNDALL ROAD

    BUNDALL

    Planned Roadworks Southbound
    Commencing: 1 February 2016 6:00am
    Concluding:1 November 2016 4:30pm
    Partial lane closures
    No delays expected. Observe signage.
    Footpath works continue along the eastern side of Bundall Road, and works are progressing to widen Bundall Road Bridge. Partial lane closures at night.
    Last updated: 29 Mar 2016 16:34
    Information provided by Department of Transport and Main Roads.

  • FOXWELL ROAD

    COOMERA

    Planned Roadworks All directions
    Major road upgrade - expect frequently changing traffic conditions and delays..
    Commencing: 05 April 2016 2:52pm
    Concluding:30 November 2016 8:00pm
    All lanes affected
    Delays expected. Changed traffic conditions.
    Ongoing roadworks at the Coomera Interchange (Exit 54). Reduced speed limit 80km/h.

    Last updated: 27 May 2016 10:42
    Information provided by Department of Transport and Main Roads.

  • STAPYLTON JACOBS WELL ROAD

    JACOBS WELL

    Planned Roadworks Both Directions
    Near Behm Creek Bridge.
    Commencing: 3 May 2016 12:00am
    Concluding:31 December 2016 6:45pm
    Lane or lanes reduced
    Delays expected. Changed traffic conditions.
    Lane closures to allow for the construction of a side track
    Last updated: 01 May 2016 18:51
    Information provided by Department of Transport and Main Roads.

  • STAPYLTON JACOBS WELL ROAD

    JACOBS WELL

    Planned Roadworks Both Directions
    Side track and temporary bridge construction.
    Commencing: 17 April 2016 7:00am
    Concluding:30 June 2016 5:00pm
    Limited to one lane
    Unknown traffic impact. Allow extra travel time.
    • One lane in operation under traffic control at most times during the construction of the side track
    • Short duration road closures of up to two hours may be required from time to time
    • Speed limits will be reduced in the work zone
    • Standard work hours are 7am to 5pm, 5 days per week

    Last updated: 11 Apr 2016 10:57
    Information provided by Department of Transport and Main Roads.

  • MOUNT LINDESAY HIGHWAY

    JIMBOOMBA

    Planned Roadworks All directions
    Installation of traffic signals at the intersection of Camp Cable Road .
    Commencing: 18 April 2016 6:00am
    Concluding:30 September 2016 5:00pm
    All lanes affected
    Delays expected. Changed traffic conditions.
    Night works from Monday 30 May for 2 weeks from 8pm to 5am.
    Last updated: 27 May 2016 10:54
    Information provided by Department of Transport and Main Roads.

  • KINGSTON ROAD

    KINGSTON

    Planned Roadworks All directions
    Increasing the existing traffic islands for safer pedestrian movements, installation of new pram-friendly pedestrian ramps at crossing points, upgrades to line marking and installation of new vehicle detector loops to increase traffic flow efficiency..
    Commencing: 16 May 2016 7:00am
    Concluding:3 June 2016 1:30pm
    No blockage
    No delays expected. Changed traffic conditions.


    Last updated: 09 May 2016 13:29
    Information provided by Department of Transport and Main Roads.

  • MAUDSLAND ROAD

    MAUDSLAND

    Planned Roadworks Both Directions
    Commencing: 18 April 2016 2:23pm
    Concluding:31 July 2016 2:30pm
    Both lanes affected
    Blank. Allow extra travel time.
    Reduced speed limits and short delays through the work zone as guardrail is installed. Works include installation of new sloping culvert at selected driveways, and improvements to roadside drainage.
    Last updated: 18 Apr 2016 14:23
    Information provided by Department of Transport and Main Roads.

  • MOUNT LINDESAY HIGHWAY

    MOUNT LINDESAY

    Planned Roadworks Southbound
    One lane in operation from early May to early June 2016 from Old Mount Lindesay Road to QLD/NSW border.
    Commencing: 03 May 2016 7:00am
    Concluding:30 June 2016 4:00pm
    Limited to one lane
    No delays expected.
    Last updated: 23 May 2016 15:41
    Information provided by Department of Transport and Main Roads.

  • BEAUDESERT BEENLEIGH ROAD

    MUNDOOLUN

    Planned Roadworks Both Directions
    Commencing: 18 April 2016 12:00pm
    Concluding:30 June 2016 5:00pm
    Unknown traffic impact. Changed traffic conditions.
    - Installation of guardrail in selected areas at Mundoolun, Tamborine, Wolffdene and Belivah Creek culvert
    - Some tree and vegetation clearing and removal of roadside hazards within close proximity to the road.
    Last updated: 18 Apr 2016 12:01
    Information provided by Department of Transport and Main Roads.

  • GOLD COAST HIGHWAY

    PALM BEACH

    Planned Roadworks All directions
    At the intersection of Palm Beach Avenue - day and night works.
    Commencing: 04 April 2016 6:00am
    Concluding:30 June 2016 12:00am
    Lane or lanes reduced
    Delays expected. Changed traffic conditions.
    Last updated: 25 May 2016 11:25
    Information provided by Department of Transport and Main Roads.

  • CHRISTINE AVENUE

    ROBINA

    Planned Roadworks All directions
    Robina- Intersection upgrade works with various lane closures as required at the intersection of Christine Avenue and Scottsdale Drive, Robina.
    Commencing: 26 April 2016 6:30am
    Concluding:10 December 2016 5:00pm
    All lanes affected
    Delays expected. Observe signage.
    Works will be completed in stages to allow minimal impact to the traffic flow.
    Last updated: 22 Apr 2016 15:29
    Information provided by Department of Transport and Main Roads.

  • CHRISTINE AVENUE

    ROBINA

    Planned Roadworks All directions
    Robina- Intersection upgrade works with various lane closures as required at the intersection of Christine Avenue and Scottsdale Drive, Robina .
    Commencing: 26 April 2016 6:30am
    Concluding:10 December 2016 5:00pm
    One lane closed
    Delays expected. Observe signage.
    Works are to be undertaken in stages to minimize disruption to traffic flow.
    Last updated: 22 Apr 2016 15:45
    Information provided by Department of Transport and Main Roads.

  • BAYVIEW STREET

    RUNAWAY BAY

    Planned Roadworks Both Directions
    Runaway Bay, Bayview Street closed between Anemone Avenue and Salvia Street.
    Commencing: 4 April 2016 7:00am
    Concluding:30 June 2016 4:00pm
    Road closed both directions
    Delays expected. Observe signage.
    Full road closure of Bayview Street, Runaway Bay between Anemone Avenue and Salvia Street with detour in place to allow culvert renewal and associated civil works.
    Last updated: 30 Mar 2016 15:05
    Information provided by Department of Transport and Main Roads.

  • GOLD COAST HIGHWAY

    SOUTHPORT

    Planned Roadworks Both Directions
    Southport -
    Half Road Closure Between North Street and Sundale Bridge
    .
    Commencing: 10 May 2016 7:00pm
    Concluding:30 June 2016 5:00am
    One lane closed
    Delays expected. Observe signage.
    City of Gold Coast work. Kerb and channel replacement work. Half road closures at a time with detour in place.
    Last updated: 23 May 2016 15:34
    Information provided by Department of Transport and Main Roads.

  • HIGH STREET

    SOUTHPORT

    Planned Roadworks Southbound
    Eastern side of High Street (North Street to Lawson Street).
    Commencing: 08 February 2016 6:00pm
    Concluding:3 June 2016 6:30am
    Partial lane closures
    No delays expected. Observe signage.
    Footpath works continue along the eastern side of High Street. Partial lane closures at night.
    Last updated: 29 Mar 2016 11:31
    Information provided by Department of Transport and Main Roads.

  • FERRY ROAD

    SOUTHPORT

    Planned Roadworks Southbound
    Eastern side of Ferry Road.
    Commencing: 1 February 2016 6:00am
    Concluding:3 June 2016 4:30pm
    Partial lane closures
    No delays expected. Observe signage.
    Footpath works continue along the eastern side of Ferry Road. Partial lane closures at night.
    Last updated: 29 Mar 2016 16:31
    Information provided by Department of Transport and Main Roads.

  • GOLD COAST SPRINGBROOK ROAD

    SPRINGBROOK

    Planned Roadworks Both Directions
    Roadworks at various locations including:
    - about three kms from the intersection with Springbrook Road and Pine Creek Road
    - near Hary's Road
    - near Austinville Road
    - near Lowry Court.
    Commencing: 1 February 2016 7:00am
    Concluding:30 June 2016 5:00pm
    Lane or lanes reduced
    Delays expected. Changed traffic conditions.
    Last updated: 23 May 2016 15:35
    Information provided by Department of Transport and Main Roads.

Sorted By:
  • NERANG BROADBEACH ROAD

    CARRARA

    Special Event Both Directions
    Commencing: 26 March 2016 6:00am
    Concluding:30 September 2016 11:00pm
    All lanes affected
    Delays expected. Traffic control on scene.
    GAME DAYS as follows:-
    26 March, 9 April, 23 April, 7 May, 21 May, 4 June, 2 July, 9 July, 23 July, 6 August. Finals dates yet to be advised.



    Last updated: 14 Mar 2016 11:23
    Information provided by Department of Transport and Main Roads.

  • MARINE PARADE

    COOLANGATTA

    Special Event Both Directions
    Coolangatta - Cooly Rocks On 2016
    Full Road Closure between Dutton Street and Warner Street.
    Commencing: 4 June 2016 5:30am
    Concluding:5 June 2016 9:30pm
    Road closed both directions
    Delays expected. Observe signage.
    Road Closure for Cooly Rocks On Special Event, observe signage for detours on Dutton Street, Griffith Street and Warner Street.
    Last updated: 31 May 2016 09:48
    Information provided by Department of Transport and Main Roads.

  • DAVENPORT STREET

    SOUTHPORT

    Special Event Both Directions
    Southport - China Town Markets
    Davenport Street and Young Street closed between Nerang Street and Young Street
    .
    Commencing: 4 June 2016 12:00pm
    Concluding:04 June 2016 11:45pm
    Both lanes affected
    Delays expected. Observe signage.
    Full road closure with detour to Chinatown Market
    Last updated: 10 May 2016 14:37
    Information provided by Department of Transport and Main Roads.

Search by location

Reset

Search by route

Reset