Access keys | Skip to primary navigation | Skip to secondary navigation | Skip to content | Skip to footer
Problems viewing this site

South Coast

This district covers the Gold Coast and Logan city councils and Scenic Rim regional council areas.

The district extends from the New South Wales border in the south to Springwood in the north, and as far west as Cunningham's Gap on the Cunningham Highway west of Boonah.



 

Sorted By:
  • No Incidents
Sorted By:
  • BRISBANE ROAD

    ARUNDEL

    Planned Roadworks
    Traffic signal upgrade at the intersection of Olsen Avenue and Oxley Drive during April and May
    Day Works- Monday to Friday: 7am - 4pm and/or
    Night Works - Monday to Thursday: 6pm - 3:30am
    Single lane closure under traffic control as required.
    Commencing: 07 April 7:00am
    Concluding:30 May, at 4:00pm
    Short delays expected. Proceed with caution.
    Last edited: 31 Mar 2014 14:22
    Information provided by Department of Transport and Main Roads.

  • SOUTHPORT NERANG ROAD

    ASHMORE

    Planned Roadworks Both Directions
    From Ashmore Road to Moora Street.
    Commencing: 31 March, at 6:30am
    Concluding:mid-May 2014
    Short delays expected. Changed traffic conditions.
    Construct of on-road cycle lanes on Southport–Nerang Road from Ashmore Road to Moora Street. The Cotlew Street intersection will be changed to a high angle entry left turn movement.

    Last edited: 28 Mar 2014 11:50
    Information provided by Department of Transport and Main Roads.

  • GOLD COAST HIGHWAY

    BILINGA

    Planned Roadworks All directions
    Traffic signal upgrade at the intersection of Kirribin Street during April and May
    Day works - Monday to Friday: 7am - 4pm and/or
    Night works - Monday to Thursday: 6pm - 3:30am
    Single lane closure under traffic control as required..
    Commencing: 07 April 7:00am
    Concluding:30 May, at 4:00pm
    Short delays expected. Proceed with caution.
    Last edited: 07 Apr 2014 08:37
    Information provided by Department of Transport and Main Roads.

  • LAMINGTON NATIONAL PARK ROAD

    CAINBABLE

    Planned Roadworks Both Directions
    14 to 20 kilometres from the start of the road at Canungra.
    Commencing: 02 March, at 6:00pm
    Concluding:31 July, at 12:00am
    Short delays expected. Allow extra travel time.
    Day works - 6am to 6pm Monday to Friday with single lane closure
    No works will occur between Easter and Anzac Day. Works resume on 28 April 2014.
    Last edited: 17 Apr 2014 17:10
    Information provided by Department of Transport and Main Roads.

  • KINGSTON ROAD

    LOGANLEA

    Planned Roadworks All directions
    Traffic signal upgrade at the intersection of Monash Road.
    Day works Monday to Friday: 7am - 4pm
    Night works Monday to Thursday 6pm - 3:30am.
    Commencing: 24 March 7:00am
    Concluding:05 May, at 4:00pm
    Short delays expected. Traffic control on scene.
    Last edited: 15 Apr 2014 13:22
    Information provided by Department of Transport and Main Roads.

  • BERMUDA STREET

    MERMAID WATERS

    Planned Roadworks All directions
    Traffic signal upgrade at the intersection of Cottesloe Drive during April and May.
    Day works - Monday to Friday: 7am - 4pm and/or
    Night works - Monday to Thursday: 6pm - 3:30am
    .
    Commencing: 07 April 7:00am
    Concluding:30 May, at 4:00pm
    Short delays expected. Proceed with caution.
    Last edited: 01 Apr 2014 08:28
    Information provided by Department of Transport and Main Roads.

  • MOUNT LINDESAY HIGHWAY

    MOUNT LINDESAY

    Planned Roadworks Both Directions
    Works to repair 8 landslips in a 5 kilometre section of road south of Palen Creek, around 20kms south of Rathdowney.
    Commencing: 01 April, at 6:00am
    Concluding:31 August, at 9:00am
    Short delays expected. Allow extra travel time.
    During each landslip repair, the road near the works will be reduced to one lane with mobile traffic signals directing traffic one way at a time.
    No works will occur between Easter and Anzac Day. Works resume on 28 April 2014.
    Last edited: 17 Apr 2014 17:12
    Information provided by Department of Transport and Main Roads.

  • BEAUDESERT NERANG ROAD

    NERANG

    Planned Roadworks All directions
    At intersection with McLaren Road.
    Commencing: 31 March, at 7:00pm
    Concluding:02 May, at 5:00am
    No delays expected. Changed traffic conditions.
    Electrical works are being carried out at the intersection of Beaudsert-Nerang Road and McLaren Road. Traffic signals will need to be switched off during some stages of this work. Police will control traffic through the intersection during those times.
    Night works.
    Last edited: 09 Apr 2014 14:18
    Information provided by Department of Transport and Main Roads.

  • PACIFIC MOTORWAY

    SLACKS CREEK

    Planned Roadworks Northbound
    Logan Road Exit 20 (northbound) off ramp closed 09/05 from 8pm to 5am.
    Commencing: 09 May 8:00pm
    Concluding:10 May, at 5:00am
    Short delays expected. Use alternative route.
    Logan Road Exit 20 (northbound) off ramp closed 09/05 from 8pm to 5am
    Last edited: 23 Apr 2014 09:52
    Information provided by Department of Transport and Main Roads.

  • GOLD COAST SPRINGBROOK ROAD

    SPRINGBROOK

    Planned Roadworks Both Directions
    Commencing: 06 February, at 6:00am
    Concluding:May 2014
    Short delays expected. Changed traffic conditions.
    Landslip repairs are occurring on GC-Springbrook Road from Austinville Road through to 7 kilometres further up the road. Stop/go traffic control in place Monday to Friday, 6am to 5pm with short delays expected.
    No works will occur between Easter and Anzac Day. Works resume on 28 April 2014.
    Last edited: 17 Apr 2014 17:13
    Information provided by Department of Transport and Main Roads.

  • PACIFIC MOTORWAY

    SPRINGWOOD

    Planned Roadworks Southbound
    Fitzgerald Avenue (Exit 20) off ramp southboubound closed 28/04 from 8pm to 5am.
    Commencing: 28 April 8:00pm
    Concluding:29 April, at 5:00am
    Short delays expected. Use alternative route.
    Fitzgerald Avenue (Exit 20) off ramp southboubound closed 28/04 from 8pm to 5am
    Last edited: 23 Apr 2014 09:48
    Information provided by Department of Transport and Main Roads.

  • PACIFIC MOTORWAY

    SPRINGWOOD

    Planned Roadworks Both Directions
    Night works with lane closures through to 31 May 2014.
    Commencing: 09 April 8:00pm
    Concluding:31 May, at 8:00pm
    Short delays expected. Changed traffic conditions.
    night works with lane closures through to 31 May 2014
    Last edited: 09 Apr 2014 10:44
    Information provided by Department of Transport and Main Roads.

  • LOGAN ROAD

    UNDERWOOD

    Planned Roadworks All directions
    Intersection of Compton Road.
    Commencing: 27 April, at 7:00pm
    Concluding:23 May, at 5:00am
    No delays expected. Allow extra travel time.
    Electrical works are being carried out at the intersection of Logan Road and Compton Road. Traffic signals will need to be switched off during some stages of this work. Police will control traffic through the intersection during those times.

    Last edited: 09 Apr 2014 14:19
    Information provided by Department of Transport and Main Roads.

  • PACIFIC MOTORWAY

    UPPER COOMERA

    Planned Roadworks Both Directions
    Asphalt overlay work on Exit 54 on and off ramps, roundabouts and overpass.
    Commencing: 18 February 8:00pm
    Concluding:31 May, at 5:00am
    Medium delays expected. Changed traffic conditions.
    Asphalt overlay work on Exit 54 on and off ramps, roundabouts and overpass between 8pm and 5am Sunday to Thursday.
    Last edited: 06 Mar 2014 12:28
    Information provided by Department of Transport and Main Roads.

  • KINGSTON ROAD

    WATERFORD WEST

    Planned Roadworks All directions
    Traffic signal upgrade at the intersection of Muchow Road.
    Day works Monday to Friday: 7am - 4pm
    Night works Monday to Thursday 6pm - 3:30am.
    Commencing: 24 March, at 7:00am
    Concluding:05 May, at 4:00pm
    Short delays expected. Traffic control on scene.
    Last edited: 15 Apr 2014 13:21
    Information provided by Department of Transport and Main Roads.

  • MUNDOOLUN CONNECTION ROAD

    WONGLEPONG

    Planned Roadworks Both Directions
    Between Beaudesert–Nerang Road (Wonglepong Road) and Beaudesert–Beenleigh Road.
    Commencing: 10 March, at 6:30am
    Concluding:30 June, at 5:00pm
    Short delays expected. Changed traffic conditions.
    The project includes
    • upgrading the intersection at Bambling Road to provide a dedicated right turn lane for northbound traffic
    • installing flag lighting at the intersections of Wonglepong Road, Bambling Road, Wagonwheel Road, Biddaddaba Road and Chestnut Road
    • installing audio tactile linemarking in sections between Wagonwheel Road and Chestnut Road
    • improving delineation along the entire length
    • widening a portion of the road shoulders between Wagonwheel Road and Biddaddaba Road.

    Last edited: 04 Mar 2014 16:51
    Information provided by Department of Transport and Main Roads.

  • PACIFIC HIGHWAY

    WORONGARY

    Planned Roadworks Both Directions
    Construction on the Pacific Motorway between Worongary (Exit 77) and Robina (Exit 82) is continuing. Night works will be carried out tonight (Tuesday 22 April 2014) and tomorrow night (Wednesday 23 April 2014).
    Commencing: Worongary to Mudgeeraba - March 2013
    Mudgeeraba to Robina - March 2014
    Concluding:Worongary to Mudgeeraba - Mid 2014
    Mudgeeraba to Robina - Late 2014
    Unknown traffic impact. Allow extra travel time.
    Motorists are advised that single lane closures will be in place, in both directions (northbound 7pm to 5am and southbound 8pm to 6am) and the speed limit through the work site will be reduced to 40km/h.
    Last edited: 22 Apr 2014 14:01
    Information provided by Department of Transport and Main Roads.

Sorted By:
  • No Special Events